4
play

4 Updated Plan must be fiscally Every constrained Years Plan - PowerPoint PPT Presentation

What Is TransPlan50 Regional Highways & Major Transit must be in the plan to be eligible for Plan funding 4 Updated Plan must be fiscally Every constrained Years Plan must conform to air quality standards What Projects Are In


  1. What Is TransPlan50… Regional Highways & Major Transit must be in the plan to be eligible for Plan funding 4 Updated Plan must be fiscally Every constrained Years Plan must conform to air quality standards

  2. What Projects Are In It… Six new freeways and Total expressways Regional 111 14 Projects Three phases of light rail Highways Transit (two unfunded), commuter rail south 121 Six new main regional Bike/Ped trails

  3. What Are The Costs… Regional Highways fully funded, total cost 13.5 billion Plan Transit is half funded, Revenues future revenue source 18.8b 23.8b And needed, total need 10.3 Revenu Need billion Needs e Bikes and Trails not all fully funded, total cost 185 million

  4. Why Plan - It’s All About The Growth… Population Wasatch Front Counties • UC grows more than the rest of Today 2050 the Front Weber 251k 357k combined Davis 348k 493k • UC adds 660k more people Salt Lake 1.1m 1.5m • County as a whole Utah 1.3m 624k doubles by 2050 to 0 500k 1.0m 1.5m 1.3 million

  5. How Does The Region Grow… • West and South Population by Sub-County Area areas grow the most Today 2050 West 127k 430k 239% • Both areas will each equal UC’s Area | % Growth North 125k 156k 25% Population back in early Central 226k 320k 42% 2000s South 390k 144k 171% • Urban growth in Central area 0 100k 200k 300k 400k 500k

  6. How Does Growth Affect Traffic in East/West Lehi… 2 nd worst congestion in the region 58,000 trips today growths to 304,000 trips by 2050 Two freeways needed (Bangerter converting to freeway at 45,000 trips)

  7. How Does Growth Affect Traffic Between Springville and Provo… Worst congestion in the region, very limited options 134,000 trips today growths to 318,000 trips by 2050 I-15 Improvements and parallel corridor need study

  8. TransPlan50 Stakeholder Goals

  9. TransPlan50 Stakeholder Goals

  10. ITE Urban Grid (and Utah County…) • Urban areas need a grid highway network • UC grew without highway grid • Grid spreads out traffic, less focus on a few roads Utah County Highway ITE Recommended Highway Grid Grid Today

  11. Utah County Highway Grid Proposed Utah County Developed with stakeholders at Grid Transportation Summits Makes arterial and collector road connections in urban built-up areas (~$500 million) Creates freeway grid past 2050 Guides future development, starts a discussion

  12. Delay Compared To Today…

  13. Travel Time Without Connected County Grid Network

  14. TransPlan50 Stakeholder Goals

  15. I-15 Freeway Lack of regional grid funnels most traffic onto I-15 increasing congestion By 2050, even at twelve lanes, the I-15 Freeway will be highly congested Proposed study will determine future design and support corridors A parallel facility or collector-distributor are some solutions

  16. South Lehi Area Lehi is ground zero of two metro areas and three valleys all coming together Silicon Slopes is becoming a major economic powerhouse and destination Proposed study will determine future road design and location East/west freeway volumes south and north of Lehi

  17. Mountain View, Lehi 2100 N, SR 73 Freeways Westside freeway grid is coming together UDOT owns 2100 North right- ROW of-way for future freeway Mountain View corridor is ROW being preserved SR 73 just completed environmental work

  18. US 6 Spanish Fork Proposed to have grade separated interchanges Freeway volumes exit I- 15 to US 6 today Heavy truck traffic with connection to Denver Major commercial and residential growth

  19. Utah Lake Bridge Bridge over Utah Lake is integral in creating freeway grid Carries 60,000 to 80,000 trips a day (FWY volumes) Could be tolled Future design work would determine how to mitigate environmental and constructability issues

  20. TransPlan50 Stakeholder Goals

  21. Commuter Rail System Commuter Rail - Front Runner Extension to Payson funded within 10 years New Vineyard Station funded within 10 years Double track in limited areas needed in 10 years, funded in 20 Electrification & full double track needed in 20 years, not funded

  22. Light Rail - Trax Light Rail System Ridership projections warrant light rail in Utah County North Line - Draper to AF needed in 10 years, funded in 30 Central Line - AF to Provo needed in 20 years, not funded South Line - Provo to SF needed in 30 years, not funded

  23. Bus Rapid Transit Bus Rapid Transit UVX Utah Valley Express a success! 10,000 ridership State Street BRT funded by 2030 South BRT needed by 2050, not funded

  24. Core Bus Routes Core Bus Routes High frequency, enhanced route, no dedicated lanes Redwood CBR needed within 10 years, funded in 20 Cedar Valley CBR funded in 10 years Maple CBR funded in 10 years Nebo CBR needed within 10 years, funded in 20

  25. TransPlan50 Stakeholder Goals

  26. Regional Trails Utah County regional trails are envied along the Wasatch Front College Connector Trail • Hobble Creek Trail • Historic Southern Rail Trail • Jordan River Parkway Trail • Mapleton Lateral Canal Trail • Murdock Canal Trail • Provo River Parkway Trail • Spanish Fork River Trail • Utah Lakeshore Trail •

  27. Planned Regional Trails Major regional trail extensions include: Highline Canal Trail (new) • Historic Southern Rail Trail • Hobble Creek Trail • Mapleton Lateral Canal Trail • Spanish Fork River Trail • Utah Lakeshore Trail •

  28. TransPlan50 Stakeholder Goals

  29. Preserving the Regional Highway Network UDOT does an excellent Extending Pavement Life job of preserving their system UDOT preservation is funded in the plan Local highway UDOT preservation is underfunded to $177 million

  30. Highways Transit Bike/Trails

  31. I move that MPO Regional Planning Committee approve of the draft TransPlan50 document and related appendices to release to a 30-day public comment period as required by the MAG Public Participation Program. Also, I recommend that, barring no significant comments received during the 30-day public comment period that would require a new air quality conformity determination, that the draft TransPlan50 document and related appendices be approved as the final document.

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.

Recommend


More recommend