29955 I-45 North, Shenandoah, Texas 77381 1 Overview Welcome - PowerPoint PPT Presentation

Public Meeting September 25, 2014 6:00-8:00 p.m. Shenandoah Municipal Complex 29955 I-45 North, Shenandoah, Texas 77381 1 Overview Welcome Study Background Short-Term Needs Long-Term Needs Panel Questions 2


  1. Public Meeting September 25, 2014 6:00-8:00 p.m. Shenandoah Municipal Complex 29955 I-45 North, Shenandoah, Texas 77381 1

  2. Overview • Welcome Study Background • Short-Term Needs • Long-Term Needs • • Panel Questions 2

  3. Background 3

  4. Background Study Goals and Objectives • Economic Development • Maximize Mobility • Quality of Life • Project Consensus 4

  5. Background Population Growth 2010 2040 Household Population Growth Year 1980 1990 2000 2010 2040* Population 128,000 181,000 294,000 453,000 1,151,000 4.30% 3.15% 30 yr. Annual Growth 5

  6. Background Survey and Website Comments Road/Area Website Blog Online Survey Rayford/Sawdust 62 381 Imperial Oaks Area 33 --- Robinson 62 203 Robinson/Hanna RR – 105 (s) Hanna --- 143 Gosling 33 139 South of Woodlands Pkwy – 30 (w) N. of Woodlands Pkwy – 3 (w) Kuykendahl 35 243 Woodlands Pkwy --- 68 Riley Fuzzell --- 65 I-45 --- 57 Other 86 83 Total 311 1,382 6

  7. Background Employment Growth Mobility Issues 7

  8. Short Term Needs Existing and Committed Projects 8

  9. Short Term Needs 0 – 5 years 9

  10. Key Corridors Rayford Road Rayford • Construct a railroad overpass at UPRR • Widen to 6 lanes from UPRR to Grand Parkway* • Incorporate access management strategies from UPRR to Grand Parkway. Elan/Birnham Woods • Widen to 4 lanes. 10

  11. Key Corridors Woodlands Parkway/Robinson Corridor • Convert the interchange at IH 45 to a single-point urban interchange (SPUI). • Widen and re-align Robinson Road from IH 45 to east of the UPRR • Extend the existing Woodlands Parkway direct connector over Woodloch Forest and Six Pines. 11

  12. Key Corridors Employment Growth Woodlands Parkway/Robinson at I-45 • Convert the Woodlands Parkway/Robinson Road at IH 45 into a single- point urban interchange (SPUI), including frontage road U-turn lanes. 12

  13. Key Corridors Employment Growth Robinson Road • Widen to four lanes from IH 45 to UPRR • Re-align and install signal at Hanna 13

  14. Key Corridors Lake Woodlands/Grogans Mill Road Lake Woodlands • Widen to six lanes from Lake Front Circle to IH 45. • Construct an overpass on Lake Woodlands at Grogans Mill. • Construct the U-turn at the intersection of Lake Woodlands Drive at entrance. Grogans Mill • Widen to six lanes from Woodlands Parkway to Research Forest. 14

  15. Key Corridors Gosling • Widen to four lanes from Flintridge to the Grand Parkway. • Build two lane bridge over Spring Creek. • Intersection improvement at Flintridge. 15

  16. Short Term Needs Kuykendahl and Gosling Kuykendahl • Widen to four lanes from Lake Woodlands to Bay Branch. • Intersection improvements at FM 1488 and Woodlands Parkway Gosling • Intersection improvements at SH 242 and Lake Woodlands. 16

  17. Short Term Needs Rayford/Sawdust Corridor • Implement access management strategies between Grogans Mill and UPRR. • Intersection improvements at Budde, IH 45 and Richard roads. • Construct a new two-lane road under IH 45 at Spring Creek to connect both sides of IH45. 17

  18. Short Term Needs David Memorial, SH 242 Research Forest/Tamina SH242 David Memorial Drive • Widen one lane in each • Extend from Shenandoah Park to SH 242. direction from Gosling to IH 45 and Harpers Way to FM 1314. • Improve intersection at Gosling. Research Forest • Improve intersection at Grogans Mill, Six Pines, Holly Hill and Pinecroft. • Widen at IH 45. Tamina • Widen from IH 45 to David Memorial. • Improve intersection at David Memorial. 18

  19. Short Term Needs Research Forest – Two Point Intersection Hyatt Place CB&I Consultant’s Recommendation 19

  20. Short Term Needs Oak Ridge North Circulation 20

  21. Bicycle/Pedestrian Network Proposed Network: 85 Miles Estimated Cost: $27 Million 21

  22. Short-Term Needs Bicycle/Pedestrian Network Possible Treatments Shared Use Path Adjacent Path Adjacent Separated Trail Utility Easements Extra – wide shoulder 22

  23. Short Term Needs Area Wide • Signal timing optimization program • Implement Aggressive Incident Clearance Program 23

  24. Additional Recommendation • Major Investment Study for IH 45N/Hardy Toll Road, from BW 8 to N Montgomery Co. 24

  25. Long Term Needs 6 – 25 years 25

  26. Long Term Needs East Side Grid • Improves N/S and E/W connectivity • Develops a roadway grid • Improves access to Grand Parkway • Provides alternatives to IH 45 • Improves local circulation 26

  27. Long Term Needs West Side • Improves N/S and E/W connectivity • Improves access to Grand Parkway • Provides alternatives to IH 45 • Improves local circulation 27

  28. Long Term Needs Research Forest Underpass Hyatt Place CB&I Consultant’s Recommendation 28

  29. Complete Network 2040 29

  30. Complete Network Estimated Cost Estimated Cost Short Term Construction Cost: $ 340.3 Million Short Term Study Cost: $23.8 Million Long Term Construction Cost: $1.23 Billion Total Plan Estimated Cost: $1.59 Billion * Construction cost only: does not include potential right-of-way acquisition cost or utility relocation 30

  31. Panel Questions 31

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.