29955 I-45 North, Shenandoah, Texas 77381 1 Overview Welcome - - PowerPoint PPT Presentation

29955 i 45 north shenandoah texas 77381
SMART_READER_LITE
LIVE PREVIEW

29955 I-45 North, Shenandoah, Texas 77381 1 Overview Welcome - - PowerPoint PPT Presentation

Public Meeting September 25, 2014 6:00-8:00 p.m. Shenandoah Municipal Complex 29955 I-45 North, Shenandoah, Texas 77381 1 Overview Welcome Study Background Short-Term Needs Long-Term Needs Panel Questions 2


slide-1
SLIDE 1

Public Meeting September 25, 2014 6:00-8:00 p.m. Shenandoah Municipal Complex 29955 I-45 North, Shenandoah, Texas 77381

1

slide-2
SLIDE 2
  • Welcome
  • Study Background
  • Short-Term Needs
  • Long-Term Needs
  • Panel Questions

Overview

2

slide-3
SLIDE 3

Background

3

slide-4
SLIDE 4

Background

4

Study Goals and Objectives

  • Economic Development
  • Maximize Mobility
  • Quality of Life
  • Project Consensus
slide-5
SLIDE 5

Household Population Growth

Year 1980 1990 2000 2010 2040* Population 128,000 181,000 294,000 453,000 1,151,000 30 yr. Annual Growth 4.30% 3.15%

2010 2040

5

Population Growth

Background

slide-6
SLIDE 6

Background

Survey and Website Comments

6

Road/Area

Website Blog Online Survey

Rayford/Sawdust 62 381 Imperial Oaks Area 33

  • Robinson

62 203

Robinson/Hanna RR – 105 (s)

Hanna

  • 143

Gosling 33 139

South of Woodlands Pkwy – 30 (w)

  • N. of Woodlands Pkwy – 3 (w)

Kuykendahl 35 243 Woodlands Pkwy

  • 68

Riley Fuzzell

  • 65

I-45

  • 57

Other 86 83 Total 311 1,382

slide-7
SLIDE 7

Employment Growth

7

Background

Mobility Issues

slide-8
SLIDE 8

8

Short Term Needs

Existing and Committed Projects

slide-9
SLIDE 9

9

Short Term Needs

0 – 5 years

slide-10
SLIDE 10

10

Key Corridors

Rayford Road

Rayford

  • Construct a railroad
  • verpass at UPRR
  • Widen to 6 lanes

from UPRR to Grand Parkway*

  • Incorporate access

management strategies from UPRR to Grand Parkway.

Elan/Birnham Woods

  • Widen to 4 lanes.
slide-11
SLIDE 11

11

Key Corridors

Woodlands Parkway/Robinson Corridor

  • Convert the interchange at IH 45 to a single-point urban

interchange (SPUI).

  • Widen and re-align Robinson Road from IH 45 to east of the

UPRR

  • Extend the existing Woodlands Parkway direct connector over

Woodloch Forest and Six Pines.

slide-12
SLIDE 12

Employment Growth

12

Key Corridors

Woodlands Parkway/Robinson at I-45

  • Convert the Woodlands Parkway/Robinson Road at IH 45 into a single-

point urban interchange (SPUI), including frontage road U-turn lanes.

slide-13
SLIDE 13

Employment Growth

13

Key Corridors

Robinson Road

  • Widen to four lanes from IH 45 to UPRR
  • Re-align and install signal at Hanna
slide-14
SLIDE 14

14

Key Corridors

Lake Woodlands/Grogans Mill Road

Lake Woodlands

  • Widen to six lanes from Lake Front Circle to IH 45.
  • Construct an overpass on Lake Woodlands at Grogans Mill.
  • Construct the U-turn at the intersection of Lake Woodlands Drive

at entrance. Grogans Mill

  • Widen to six lanes from Woodlands Parkway to Research Forest.
slide-15
SLIDE 15

15

Key Corridors

Gosling

  • Widen to four lanes from

Flintridge to the Grand Parkway.

  • Build two lane bridge
  • ver Spring Creek.
  • Intersection

improvement at Flintridge.

slide-16
SLIDE 16

16

Short Term Needs

Kuykendahl and Gosling

Kuykendahl

  • Widen to four lanes from

Lake Woodlands to Bay Branch.

  • Intersection improvements

at FM 1488 and Woodlands Parkway Gosling

  • Intersection improvements

at SH 242 and Lake Woodlands.

slide-17
SLIDE 17

17

Short Term Needs

Rayford/Sawdust Corridor

  • Implement access

management strategies between Grogans Mill and UPRR.

  • Intersection

improvements at Budde, IH 45 and Richard roads.

  • Construct a new

two-lane road under IH 45 at Spring Creek to connect both sides of IH45.

slide-18
SLIDE 18

18

David Memorial, SH 242 Research Forest/Tamina

Short Term Needs

SH242

  • Widen one lane in each

direction from Gosling to IH 45 and Harpers Way to FM 1314.

  • Improve intersection at

Gosling. Research Forest

  • Improve intersection at

Grogans Mill, Six Pines, Holly Hill and Pinecroft.

  • Widen at IH 45.

Tamina

  • Widen from IH 45 to David

Memorial.

  • Improve intersection at

David Memorial. David Memorial Drive

  • Extend from Shenandoah Park to SH 242.
slide-19
SLIDE 19

19

Short Term Needs

Research Forest – Two Point Intersection

CB&I Hyatt Place

Consultant’s Recommendation

slide-20
SLIDE 20

20

Short Term Needs

Oak Ridge North Circulation

slide-21
SLIDE 21

21

Bicycle/Pedestrian Network

Proposed Network: 85 Miles Estimated Cost: $27 Million

slide-22
SLIDE 22

22

Short-Term Needs

Bicycle/Pedestrian Network

Utility Easements Extra –wide shoulder Shared Use Path Adjacent Separated Trail Adjacent Path

Possible Treatments

slide-23
SLIDE 23

23

Short Term Needs

  • Signal timing optimization program
  • Implement Aggressive Incident Clearance Program

Area Wide

slide-24
SLIDE 24

24

Additional Recommendation

  • Major Investment Study for

IH 45N/Hardy Toll Road, from BW 8 to N Montgomery Co.

slide-25
SLIDE 25

25

Long Term Needs

6 – 25 years

slide-26
SLIDE 26

26

Long Term Needs

East Side Grid

  • Improves N/S and

E/W connectivity

  • Develops a

roadway grid

  • Improves access to

Grand Parkway

  • Provides

alternatives to IH 45

  • Improves local

circulation

slide-27
SLIDE 27

27

Long Term Needs

West Side

  • Improves N/S and E/W

connectivity

  • Improves access to Grand

Parkway

  • Provides alternatives to IH 45
  • Improves local circulation
slide-28
SLIDE 28

28

Long Term Needs

Research Forest Underpass

Hyatt Place CB&I

Consultant’s Recommendation

slide-29
SLIDE 29

29

Complete Network

2040

slide-30
SLIDE 30

30

Complete Network

Estimated Cost

Short Term Construction Cost: $ 340.3 Million Short Term Study Cost: $23.8 Million Long Term Construction Cost: $1.23 Billion Total Plan Estimated Cost: $1.59 Billion

Estimated Cost