23.06.2017 8 th Largest 4 th fastest Termed as 9/10 Diamonds 40% of - - PowerPoint PPT Presentation

23 06 2017 8 th largest 4 th fastest
SMART_READER_LITE
LIVE PREVIEW

23.06.2017 8 th Largest 4 th fastest Termed as 9/10 Diamonds 40% of - - PowerPoint PPT Presentation

23.06.2017 8 th Largest 4 th fastest Termed as 9/10 Diamonds 40% of nations total Economic in the world are man-made fabric & in India as per growing city Capital of Gujarat population cut and polished 28% of nations total globally


slide-1
SLIDE 1

23.06.2017

slide-2
SLIDE 2
  • Surat dates back to 300 BC
  • Municipality Established in 1852
  • Municipal Corporation Formed in 1966
  • Hazira Industrial Estate near the City
  • An Environment with Peace, Alliance & Unity

8th Largest

in India as per population

4th fastest growing city

globally Termed as

Economic Capital of Gujarat

9/10 Diamonds in the world are

cut and polished here

40% of nations total man-made fabric & 28% of nation’s total man-made fiber

production

Ranked #4

under the Smart City Mission

Ranked #4

Swachh Survekshan 2017

slide-3
SLIDE 3

Year Area in

  • Sq. Km

Population 1951 8.18 2,23,182 1961 8.18 2,88,026 1971 33.85 4,71,656 1981 55.56 7,76,583 1991 111.16 14,98,817 2001 112.27 24,33,785 2001* 326.51 28,77,241 2011 326.51 44,61,026

  • Unprecedented growth in last four decades
  • Decadal Growth - 60-80%
  • In 2006 with the expansion of city limits, city area

increased to three times

2,23,182 2,88,026 4,71,656 7,76,583 14,98,817 24,33,785 44,61,026 1951 1961 1971 1981 1991 2001 2011

POPULATION GROWTH

slide-4
SLIDE 4

PAN City – Rs. 817 Cr. ABD Area – Rs. 1780 Cr.

slide-5
SLIDE 5
  • 1. Covers 8.77 sq.km area
  • ut of 326.52 sq.km
  • 2. 7 TP Schemes
  • 3. Retrofitting proposal:
  • Rs. 1780 Cr.

ABD PAN

  • 1. For the whole city
  • 2. Focuses on Transport -

Mobility -Connectivity

  • 3. Total Proposal:
  • Rs. 817 crore

Water - Supply, Conservation, Recharge Sewage - Recycle & Reuse Renewable Energy Smart Road Visual Improvement Economic Development Housing & Inclusiveness Citizen Engagement

Surat Smart City Proposal - Convergence

IT Systems OFC Network Connectivity

slide-6
SLIDE 6

Property Tax KPI Dashboard Complaint Monitoring CCTV Monitoring Malaria Survey

  • The SMAC Center integrates & collaborates data from

various departments.

  • Acts as single command and control center for various

departmental functions of Surat Municipal Corporation.

  • Enables monitoring of KPI and abnormal events to take

corrective actions.

  • Cross department collaboration and early identification of

the issues helps in improvement of the quality of service.

PAN City │

Inaugurated on 25.06.2016

Features Video Wall Area : 250 sq.ft. SMAC Center Area: 2100 sq.ft. Capacity : 22 operators Domains Covered : 7

slide-7
SLIDE 7

Inaugurated

  • n 29.10.2016

PAN City │

  • Surat.data.gov.in - a platform supporting Open Data initiative of SMC.
  • Created under Software as A Service (SaaS) model of Open Government

Data (OGD) Platform India of NIC.

  • Data sets pertaining to property tax, professional tax, birth registration,

death registration, census, transaction details, budget, weather, transport,

  • etc. accessible to the citizens.

Future Plan

  • To make available near realtime

data using APIs

  • Datasets pertaining to water

supply, solid waste collection, bus passenger information,

  • nline & offline transactions,

etc.

Honourable Chief Minister inaugurating surat.gov.in portal

slide-8
SLIDE 8

BRTS & City Bus ITMS ITCS AFCS

slide-9
SLIDE 9

Real-time information of BRTS/City buses Tracking of SMC vehicles Bunching & Headway Management Integrated Fares & Travel across BRTS & City Bus

Project Cost

  • Rs. 49 Cr

PAN City │

116 BRTS Buses 200 City Buses 153 BRTS Stations 640 Route Kms – 98% City Coverage

slide-10
SLIDE 10

PAN City │

  • Project Cost: Rs. 80.22 Cr
  • Integration with Common

City Payment Card

  • Mobile Ticketing with QR

Code

QR Code Based Ticketing Solution at BRTS Bus Station & within City Buses

slide-11
SLIDE 11

27 Projects INR 1780 Crore

slide-12
SLIDE 12

10%

3% City Area 10% City Population 16% GDP

Total City Area: 326.515 Sq.Km. Retrofitting Area: 2167 acres (8.77Sq.Km) includes 7 TP schemes Present Population 5 lakhs Floating Population : 1 lakh ABD Projects – 1780 Cr.

3% 16%

slide-13
SLIDE 13

Solar Energy Residential Rooftop Solar LED Street Light Biogas

slide-14
SLIDE 14

Green Energy Sources used by SMC Wind Energy Solar Energy Waste to Energy

(Biogas Based Power Plant)

Total Capacity 30.3 MW 5 MW 5.85 MW Total Generation (KWH) 1947 Lakh KWH 69 Lakh KWH 561 Lakh KWH Total Benefit Realized (Gross) INR 102 Cr. INR 5.24 Cr. INR 33 Cr.

  • 34% of electricity consumed by SMC comes from Renewal Sources of Energy
  • Yearly 8.5 Crore KWH electricity generated resulting in saving of Rs. 45 cr.
slide-15
SLIDE 15

ABD Area│

Project Cost: Rs. 5.13 Cr Impact

  • 14 lacs units p.a. will be generated
  • Savings in electricity: Rs. 85 lacs p.a.
  • Reduction of 6500 tonnes CO2 p.a.

Completion : June 2017

  • City - 5 MW
  • Project Cost – 30 Cr.
  • ABD – 1 MW
  • Project Cost – 5.10 Cr.

Solar Power Generation

  • Total applications – 2400 of which 1755

approved, 800 installation complete

  • 5 MW Capacity

Residential Rooftop Solar

Rander Water Works

slide-16
SLIDE 16

ABD Area│

Smart City ABD Area 7500 LED Fittings Completion –June 2017 Project Brief

  • Total 90,000 fittings across city
  • Conservation – 1.5 Cr units/year
  • Conversion so far – 55,000 fittings
  • Electricity Bill Savings: Rs. 9 Cr./year
  • Longer life than conventional light
  • Low Ultra Violet and Infrared

Radiation Centralised Control & Monitoring System as part of Smart Street Light

slide-17
SLIDE 17

ABD Area│

  • Treatment of 50 TPD of organic waste
  • Decentralized Model
  • Location: APMC market, Surat
  • Reduction of transportation cost &

revenue generation in form of energy

Digester

Scrubber and Bottling

Tipping Floor & Crusher

Compost: 5 TPD Biogas: 7200 m3/day Liquid Fertilizer: 2.1 TPD Captive Power Plant: 140 kwe

slide-18
SLIDE 18

Water Conservation Water Recycling

slide-19
SLIDE 19

ABD Area│

Dindoli Tertiary Treatment Plant

  • 40 MLD capacity Tertiary Treatment Plant (TTP)
  • To treat secondary treated water from

Sewage Treatment Plant (167 MLD capacity)

  • To supply Industrial Grade Water to Pandesara Industrial Estate
  • Total Project Cost – 256 Cr.
  • Reduces pressure on water resources in the city
  • Reduces diversion of drinking water for non-potable purposes

TTP Inlet TTP Outlet Raw-TTP Inlet-TTP Outlet

slide-20
SLIDE 20

ABD Area│

Impact

  • Prevent drain out of surface

water

  • Enhance the ground water table
  • 34 Rain Water Recharging Wells in

ABD Area

  • 300 mm Diameter
  • Installation
  • f

two layers sand filtration precast module for water recharging/ harvesting

At Magob Central Store

slide-21
SLIDE 21

ABD Area│

  • 24x7 water supply to serve entire ABD area of 8.77 sq.km
  • 3 - Water Distribution Stations (69 lacs ltr., 48 lacs ltr. and 51 lacs ltr.)
  • 7 - Elevated Storage Reservoirs (2 with. 15 lacs ltr., 4 with 21 lacs ltr., 1 with

24 lacs ltr.)

  • 3 - Rising Main lines (4.980 RKM, k9 class DICL pipes dia 400 to 600 mm)
  • Distribution network line of 57,940 rmt. (k9 class DICL pipes dia 150 to 700

mm)

  • SCADA

System for effective supervision control and data acquisition and centralized monitoring

  • 27,000 Smart Water Meters - to prevent the wastage of water and

automate water meter and billing

slide-22
SLIDE 22

Visual Improvement

slide-23
SLIDE 23

ABD Area│

Tender Cost

  • Rs. 121 Cr

Completion April 2019

  • Visual

Improvement

  • f

Roads consisting:

  • Up gradation & Augmentation
  • Footpath & Cycle Track
  • Utility Duct
  • Road Markings & Traffic Signage
  • Street Furniture & Bus Shelter
  • Vending Kiosk
  • Major roads of 23 km. length

covered under Visual Improvement Project

slide-24
SLIDE 24

3040 houses under PMAY 5800 housed under PPP

slide-25
SLIDE 25

ABD Area│

PMAY Scheme

  • Total 8109 houses
  • 3040 houses under

Smart City ABD Area

  • Project Cost 240 Cr.
  • All WIP

PPP

  • 10,200 houses
  • 7500 approved with

Project Cost 631 Cr. Efforts Till Date

  • 78,170 Houses

allotted

  • 69,449 EWS Houses
  • 8721 LIG Houses
slide-26
SLIDE 26

Important Projects in Pipeline

Fiber Network | Logistic Park | Incubation Center | Sky Walk

Tender Preparation 5 Tender

  • Eval. Stage

9 WIP 18 Completed Works 5 Total 27 Projects 39 Works

“Smart Utilization of Surat City’s Potential for enhancing Quality of life for the citizens by Providing Equal Access to Best Quality Physical Infrastructure, Social Infrastructure and Mobility through leveraging state

  • f the art technology; thus making Surat a Futuristic Global city with

focus on enhancing economy, protecting the ecology and preserving the identity & culture of the city.”

slide-27
SLIDE 27

www.suratmunicipal.gov.in www.suratsmartcity.com