2020 & 2024 Final LCR Study Results Stockton Area Ebrahim Rahimi Lead Regional Transmission Engineer Stakeholder Call April 10, 2019 ISO Public ISO Public Stockton Area Transmission System & LCR Subareas Legend: Legend: Rio Oso


slide-1
SLIDE 1

ISO Public ISO Public

2020 & 2024 Final LCR Study Results Stockton Area

Ebrahim Rahimi Lead Regional Transmission Engineer Stakeholder Call April 10, 2019

slide-2
SLIDE 2

ISO Public

Stockton Area Transmission System & LCR Subareas

Slide 2

Legend:

Bellota 230 kV Weber 60 kV

Weber LCR Sub-Area

60 kV

Weber 230 kV Tesla 230 kV

230 kV

Stockton A 60 kV Santa Fe 60 kV Santa Fe 60 kV Hazelton JCT 60 kV

Legend:

Rio Oso 230 kV Lockeford 60 kV

Lockeford LCR Sub-Area

Lodi 60 kV Industrial 60 kV 60 kV Colony 60 kV Victor 60 kV Lockeford 230 kV Bellota 230 kV 230 kV Wodberg 60 kV

Manteca 115 kV

Legend:

115 kV Kasson 115 kV Vierra 115 kV Schulte Tesla 115 kV

Tesla-Bellota LCR Sub-Area in 2020

Tracy Salado 115 kV Ingram Creek 115 kV

G

GWF Tracy Units Lammers Melones 115 kV Bellota 115 kV Riverbank 115 kV Tulloch 115 kV Stanislaus 115 kV Ripon 115 kV Riverbank JCT 115 kV Bellota 230 kV

slide-3
SLIDE 3

ISO Public

New major transmission projects

Slide 3

Project Name Expected ISD Year 2020 Ripon 115 kV Line Apr-19 Stockton A – Weber #1 & #2 60 kV lines Reconductor May-19 Year 2024 Vierra 115 kV Looping Project Feb-23

slide-4
SLIDE 4

ISO Public

Power plant changes

Additions:

  • No new resource addition

Retirements:

  • No new retirements

Slide 4

slide-5
SLIDE 5

ISO Public

Stockton Area Overall: Load and Resources

Slide 5

Load (MW) 2020 2024 Generation (MW) 2020 2024 Gross Load 1,270 1,360 Market/ Net Seller/ Battery 497 543 AAEE

  • 16
  • 52

Solar 1 1 Behind the meter DG Wind Net Load 1,254 1,308 Muni 137 137 Transmission Losses 22 21 QF 18 18 Pumps Future preferred resource and energy storage Load + Losses + Pumps 1,275 1,329 Total Qualifying Capacity 653 699

slide-6
SLIDE 6

ISO Public

Lockeford Sub Area : Requirements

Slide 6

Year Category Limiting Facility Contingency LCR (MW) (Deficiency) 2020 B Lockeford – Lodi #2 60 kV Lockeford-Industrial 60 kV line and Loci CT 48 (24) 2020 C Lockeford – Lodi #3 60 kV Lockeford-Industrial and Lockeford – Lodi #2 60 kV lines 97 (73) 2024 B Lockeford – Lodi #2 60 kV Lockeford-Industrial 60 kV line and Loci CT 53 (29) 2024 C Lockeford – Lodi #3 60 kV Lockeford-Industrial and Lockeford – Lodi #2 60 kV lines 102 (78)

Lockeford Lodi Industrial

New Hope Colony Victor Lodi Jct Lockeford-Lodi #1 Lockeford-Industrial Lockeford-Lodi #2 Lockeford-Lodi #3

Legend:

60 kV

X X X

Contingency Overload

slide-7
SLIDE 7

ISO Public

Lockeford Subarea: Load Profiles

Slide 7

slide-8
SLIDE 8

ISO Public

Weber Sub Area : Requirements

Slide 8

Year Category Limiting Facility Contingency LCR (MW) (Deficiency) 2020 B None None No requirement 2020 C Stockton A-Weber #3 Stockton A-Weber #1 and #2 60 kV lines 26 2024 B None None No requirement 2024 C Stockton A-Weber #3 Stockton A-Weber #1 and #2 60 kV lines 26

Legend:

Bellota 230 kV Weber 60 kV

Weber LCR Sub-Area

60 kV 230 kV

Stockton A 60 kV Santa Fe 60 kV Hazelton JCT 60 kV

X

Contingency Overload

X X

slide-9
SLIDE 9

ISO Public

Weber Subarea: Load Profiles

Slide 9

slide-10
SLIDE 10

ISO Public

Stanislaus Sub Area : Requirements

Slide 10

Year Category Limiting Facility Contingency LCR (MW) (Deficiency) 2020 B Manteca - Ripon 115 kV Line Bellota-Riverbank-Melones 115 kV line and Stanislaus PH unit 179 2020 C Same as Category B 2024 B Manteca - Ripon 115 kV Line Bellota-Riverbank-Melones 115 kV line and Stanislaus PH unit 185 2024 C Same as Category B

Manteca 115 kV Melones 115 kV Bellota 115 kV Riverbank 115 kV Tulloch 115 kV Stanislaus 115 kV Ripon 115 kV Bellota – Riverbank – Melones SW STA Bellota – Riverbank Riverbank JCT SW STA - Menteca Stanislaus – Melones SW STA - Manteca Stanislaus – Manteca #2 Riverbank JCT 115 kV

X Legend:

115 kV

X

Contingency Overload

slide-11
SLIDE 11

ISO Public

Stanislaus Subarea: Flow Profiles

Slide 11

slide-12
SLIDE 12

ISO Public

Slide 12

Year

Category

Limiting Facility Contingency LCR (MW) (Deficiency) 2020 B Tesla – Tracy 115 kV line Schulte – Lammers 115 kV and GWF Tracy #3 unit 639 (60 NQC/ 61 Peak) 2020 C Schulte-Kasson- Manteca 115 kV lines Schulte – Lammers and Tesla – Tracy 115 kV lines 1,117 (538 NQC/ 539 Peak) 2024 B Tesla – Vierra 115 kV line Tesla – Tracy 115 kV and GWF Tracy #3 unit 364 2024 C (1) Tesla – Tracy 115 kV line Schulte – Lammers and Tesla – Vierra 115 kV lines 756 (131 NQC/ 132 Peak) 2024 C (2) Tesla – Vierra 115 kV line Schulte – Lammers and Schulte-Kasson-Manteca 115 kV lines 552 (256 NQC/ 257 Peak) 2024 C (total) N/A N/A 881 (256 NQC/ 257 Peak)

Tesla - Bellota Sub Area : Requirements

Manteca 115 kV

Legend:

115 kV Kasson 115 kV Vierra 115 kV Schulte Tesla 115 kV

Tesla-Bellota LCR Sub-Area in 2020

Tracy Salado 115 kV Ingram Creek 115 kV

G

GWF Tracy Units Lammers

X X

Melones 115 kV Bellota 115 kV Riverbank 115 kV Tulloch 115 kV Stanislaus 115 kV Ripon 115 kV Riverbank JCT 115 kV Bellota 230 kV

Tesla-Bellota LCR Sub-Area in 2024

Manteca 115 kV Kasson 115 kV Schulte Tesla 115 kV Tracy Salado 115 kV Ingram Creek 115 kV

G

GWF Tracy Units Lammers Vierra 115 kV Thermal Energy

Legend:

115 kV

X X

Melones 115 kV Bellota 115 kV Riverbank 115 kV Tulloch 115 kV Stanislaus 115 kV Ripon 115 kV Riverbank JCT 115 kV Bellota 230 kV

slide-13
SLIDE 13

ISO Public

Tesla-Bellota Subarea: Flow Profiles

Slide 13

slide-14
SLIDE 14

ISO Public

Slide 14

Subarea 2019 2020 Load LCR Load LCR Lockeford 184 83 (59) 190 97 (73) Weber 229 21 238 26 Stanislaus N/A 152 N/A 179 Tesla - Bellota 761 673 (291) 848 1,117 (538 NQC/ 539 Peak) Total 1,174 777 (350) 1,275 1,241 (612 NQC/ 613 Peak)

LCR increases is mostly due to load increase. The load has a much higher effectiveness factor than the most effective resource.

N/A=Flow-through area. No defined load pocket.

Changes from 2019 to 2020

slide-15
SLIDE 15

ISO Public

Changes from 2023 to 2024

Slide 15

LCR increases is mostly due to load increase. The load has a much higher effectiveness factor than the most effective resource.

N/A=Flow-through area. No defined load pocket.

Subarea 2023 2024 Load LCR Load LCR Lockeford 198 103 (79) 193 102 (78) Weber 219 21 238 26 Stanislaus N/A 147 N/A 185 Tesla - Bellota 809 319 (78) 899 881 (256 NQC/ 257 Peak) Total 1,226 439 (157) 1,330 1,009 (334 NQC/ 335 Peak)

slide-16
SLIDE 16

ISO Public

Stockton Area Total LCR Need

Slide 16

2020 LCR Need Existing Generation Capacity Needed (MW) Deficiency (MW) Total MW Need Category B (Single) 603 (84 NQC/ 85 Peak) 687 Category C (Multiple) 629 (612 NQC/ 613 Peak) 1,241 2024 LCR Need Existing Generation Capacity Needed (MW) Deficiency (MW) Total MW Need Category B (Single) 414 29 443 Category C (Multiple) 675 (334 NQC/ 335 Peak) 1,009