2019/20 Performance Benchmark Report Michael Johnson P.E. State Asset Management Engineer California Department of Transportation June 2020 1 What is the Performance Benchmark Report? CTC Guidelines: CTC Guidelines require an annual


  1. 2019/20 Performance Benchmark Report Michael Johnson P.E. State Asset Management Engineer California Department of Transportation June 2020 1

  2. What is the Performance Benchmark Report? • CTC Guidelines: CTC Guidelines require an annual report to the Commission showing progress toward asset management and SB1 performance targets • What’s in the Report: Reports the current condition and future projections relative to the 19 established baseline conditions 2017- 2027. • Timing: The 2019/20 Performance Benchmark Report is presented in June of each year. This is the third reporting with actual conditions through 30% of the time period (2017-2027) Slide 2

  3. Benchmark Development Slide 3

  4. Report Features Slide 4

  5. Summary of Progress on SB1 Targets Slide 5

  6. Class 1 Pavement Slide 6

  7. Culvert Condition Detail Slide 7

  8. TMS Projection Slide 8

  9. Summary of Progress on Asset Management Targets Slide 9

  10. Bridge Condition Slide 10

  11. Bridge Condition - Poor Slide 11

  12. SHOPP Bridge Project Timeline Average Time Period = 9.5 Years On - 2 1 2.2 1.6 0.5 Year 1.2 1 going Years Year Years Years Years Year TAMP Planning Program Capital Outlay Support (COS) COS Closeout Allocation Construction PS&E (Design) Need & Programming & Allocation Priority Re - inspection PA&ED PID Allocation Identified Right of Way Programming End Project PA&ED Right of Way Certification Begin Construction End Construction Design Complete, RTL and Complete DEFINITIONS TAMP Transportation Asset Management Plan PID Project Initiation Document PA&ED Project Approval and Environmental Document PS&E Plans, Specifications and Estimate RTL Ready to List for Advertising Slide 12

  13. Bridge Corrective Strategies Permit streamlining – AB 1282 Increase the Bridge Project Portfolio Inspection Data Update • • Pending Final Report Program immediately after Planning Post project update coordination • Pilot locations identified completion • Liberal use of Long Lead for Bridges • Innovative Delivery (Design Build, CMGC) Slide 13

  14. Conclusion • Overall, we are making good progress • Senate Bill 1 Metrics • SB1 Performance Metrics – Pavement and culverts at goals • SB1 Metrics – Fix bridges half way to 500; monitoring TMS • Asset Management Metrics • TAMP Targets - Watching Bridge Condition and TMS • Evaluating need for change in Fair bridge target Slide 14

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.