2010-2019 DOT 195 Accidents Review Derek Sollberger, PE
Tulsa, OK May, 7 2020
IC-Solutions-LLC www.ic-solutions-llc.com Oklahoma City, OK dsollberger@ic-solutions-llc.com
2010-2019 DOT 195 Accidents Review Derek Sollberger, PE - - PowerPoint PPT Presentation
2010-2019 DOT 195 Accidents Review Derek Sollberger, PE IC-Solutions-LLC Tulsa, OK www.ic-solutions-llc.com May, 7 2020 Oklahoma City, OK dsollberger@ic-solutions-llc.com Accident Report Hazardous Liquid Pipeline Systems form updates:
2010-2019 DOT 195 Accidents Review Derek Sollberger, PE
Tulsa, OK May, 7 2020
IC-Solutions-LLC www.ic-solutions-llc.com Oklahoma City, OK dsollberger@ic-solutions-llc.com
Accident Report – Hazardous Liquid Pipeline Systems form updates:
Form RSPA F 7000-1 49 CFR §195.50
20,000 30,000 40,000 50,000 60,000 bbl
TANK SUBTYPE SPILLS
SINGLE BOTTOM ROOF DRAIN MIXER OTHER ROOF/ROOF SEAL DOUBLE BOTTOM
COMMODITY
CRUDE OIL NON-HVL, LIQ @ AMB HVL, GAS @ AMB BIOFUEL / ALTERNATIVE FUEL
CAUSE
EQUIPMENT FAILURE NATURAL FORCE DAMAGE OTHER INCIDENT CAUSE INCORRECT OPERATION CORROSION FAILURE OTHER OUTSIDE FORCE DAMAGE MATERIAL FAILURE OF PIPE OR WELD
OTHER EQUIP MALFUNCTION OF CONTROL/RELIEF EQUIP EQUIP BODY (<PUMP, TANK PLATE, MATERIAL) NON-THREADED CONNECT
EQUIPMENT FAILURE
10,000 20,000 30,000 1,000 2,000 3,000 1920 1940 1951 1956 1964 1971 1976 1981 1989 1994 2001 2006 2011 2016
2,000
TANK, VESSEL, OR SUMP/SEPARATOR ALLOWED OR CAUSED TO OVERFILL EQUIPMENT NOT INSTALLED PROPERLY OTHER INCORRECT OPERATION VALVE LEFT OR PLACED IN WRONG POSITION, NOT OVERFLOW OR OVERPRESSURE
INCORRECT OPERATION
Tank Damage Expenditures TOTAL per TANK category
AVG per incident
$7-15/1,000 bll storage (0.5B-1B Part M)
development review
material compatibility reviews,
inspections.
100 200 300 400 1945 1954 1957 1965 1968 1973 1980 1983 1986 1990 1995 2000 2003 2007 2010 2013 2016
MANUFACTURE YEAR
200 400 600 800 1000 1200 1400 1600 1800
Mainline Valve Type Failure
GATE BALL CHECK OTHER PLUG
MAINLINE LEAK TYPE
OTHER SEAL OR PACKING CONNECTION FAILURE PINHOLE CRACK
COMMODITY
CRUDE OIL HVL, GAS @ AMB NON-HVL, LIQ @ AMB CO2
EQUIPMENT FAILURE INCORRECT OPERATION OTHER OUTSIDE FORCE CORROSION FAILURE NATURAL FORCE EXCAVATION DAMAGE OTHER INCIDENT CAUSE
AUXILIARY OR OTHER VALVE
EQUIPMENT FAILURE
EQUIP BODY (<PUMP, TANK PLATE, MATERIAL) THREADED CONNECTION/COUPLING MALFUNCTION OF CONTROL/RELIEF EQUIP NON-THREADED CONNECTION OTHER EQUIPMENT PUMP OR PUMP-RELATED EQUIP DEFECTIVE OR LOOSE TUBING OR FITTING
measures.
recommendations and easily accessible by Operations.
Valve Damage Expenditures TOTAL per VALVE category
AVG per incident
28,369 bbl on 699 events
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100% 10,000 20,000 30,000 40,000 50,000 60,000 70,000 80,000 90,000 100,000 4 6 6.625 8.625 10.5 12 14 20 26 32 40
COMODITY
HVL, GAS @ AMB CRUDE OIL NON-HVL, LIQ @ AMB 10000 20000 30000 40000 1910 1929 1937 1944 1950 1956 1962 1968 1974 1980 1987 1993 1999 2006 2011 2018
MANUFACTURE YEAR
100,000 150,000 200,000 250,000
Pipe Body, Corrosion, Material Failure, Incident Area
UNDERGROUND TRANSITION AREA ABOVEGROUND
100,000 CPM LEAK DETECTION OR SCADA INFO NOTIFICATION FROM PUBLIC CONTROLLER LOCAL OPERATING STAFF AND CONTRACT AIR PATROL GROUND PATROL BY OPS OR CONTRACT OTHER
ACCIDENT IDENTIFIER
0% 5% 10% 15% 20% GALVANIC OTHER MICROBIOLOGICAL STRAY CURRENT ATMOSPHERE SELECTIVE SEAM
TYPE OF CORROSION
46% of External Corrosion records noted Prior Coating Damage
51% 29% 8% 7% 5% 18 51 4 4 3 6 3
PIPE SEAM TYPE FAILURES
LONGITUDINAL ERW - HF LONGITUDINAL ERW - LF LAP WELDED FLASH WELDED SEAMLESS LONGITUDINAL ERW - UNK 0% 10% 20% 30% 40% TOTAL ILI MFL GEOMETRY COMBO CALIPER ULTRASONIC TRANSVERSE OTHER CRACK
PRIOR TOOL RUNS
0% 50% 100%
CORROSION INHIBITORS CORROSION COUPONS
INTERNAL CORROSION EFFORTS
0% 10% 20% 30% 40% INTEGRITY HYDRO CLOSE INTERVAL DIRECT INSPECT
INTEGRITY PROGRAMS
67% 33%
2018 DOT 195 Part E -ERW Pipe Seam
HIGH FREQUENCY LOW FREQUENCY AND DC 0% 20% 40% 60% 80% 100%
20,000 30,000 40,000 50,000 <4 8 12 16 20 24 28 32 36 40 44 48
2018 DOT 195 Part H Mileage
On Shore Off Shore %
representative presence during line crossing urgent
detection
Pipe Damage Expenditures TOTAL per PIPE category
AVG per incident
279,679 bbl on 745 events
Corrosion, Material Failure, & Other Incident
40,000 60,000 80,000 100,000 120,000 140,000 160,000 180,000
Excavator Equipment
TRENCHER BACKHOE/TRACKHOE UNKNOWN/OTHER GRADER/SCRAPER FARM EQUIPMENT DRILLING DIRECTIONAL DRILL AUGER BORING
13 57 23 14 12
0% 20% 40% 60% 80% 100% TRENCHER BACKHOE/TRACKHOE UNKNOWN/OTHER GRADER/SCRAPER FARM EQUIPMENT DRILLING DIRECTIONAL DRILL AUGER BORING PROBING DEVICE
One Call Notice One Call Completed
EXCAVATION PRACTICES NOT SUFFICIENT LOCATING PRACTICES NOT SUFFICIENT OTHER ONE-CALL NOTIFICATION PRACTICES NOT SUFFICIENT
Comodity
HVL, GAS @ AMB CRUDE OIL NON-HVL, LIQ @ AMB
Median Grade 42,000 Median Diameter 10 Average Install Year 1968
Data includes dozer line strike to a propane pipeline, resulting in
fatality and one general public injury.
requirements.
identification exercises.
Excavator Damage Expenditures TOTAL per EXCAVATOR category
AVG per incident
Data Summary
– 2 Failed (Contractors)
auditing, and training
Integrity Operations Engineering Inspection Coordination IC-Solutions LLC brings together 40 years of mid-continent pipeline operations, integrity, construction, and optimization experience. Our experience includes facility design and operation. We will utilize our extensive experience and background to ensure your assets remain compliant and free of any jurisdictional interruptions; thereby leaving your schedule open for revenue generating and expense management activities. Our years of experience inside mid-sized organizations has established a value driven approach with all projects. We can help you unlock underutilized capacity and assist with operational challenges that appear in the form of regulatory restrictions, inefficiencies or losses.