100% Design/Construction Kick-Off Wedgefield Area K-8 School May - - PowerPoint PPT Presentation

100 design construction kick off wedgefield area k 8
SMART_READER_LITE
LIVE PREVIEW

100% Design/Construction Kick-Off Wedgefield Area K-8 School May - - PowerPoint PPT Presentation

100% Design/Construction Kick-Off Wedgefield Area K-8 School May 13, 2015 Orange County Public Schools Wedgefield Area K-8 School Meeting Agenda Welcome Principal Lundman Introductions School Board Member, Joie Cadle


slide-1
SLIDE 1

100% Design/Construction Kick-Off Wedgefield Area K-8 School

May 13, 2015

slide-2
SLIDE 2

Orange County Public Schools Wedgefield Area K-8 School Meeting Agenda

  • Welcome – Principal Lundman
  • Introductions – School Board Member, Joie Cadle
  • Project Update –

Facilities Meeting Organizer Architect: Zyscovich Architects Construction Manager: Pirtle Construction Utilities Update: Pluris

  • Questions and Answers
  • Adjournment

05.13.2015

slide-3
SLIDE 3

Orange County Public Schools

05.13.2015

NORTH

slide-4
SLIDE 4

Orange County Public Schools

BANCROFT BLVD. ORTEGA ST. PADDOCK ST. BABBIT AVE. ARCHER AVE.

NORTH

05.13.2015

slide-5
SLIDE 5

Orange County Public Schools

Required Parking

OCPS Design Guide = Minimum 150 Spaces SREF Requirements : Staff + 1 per 100 Students Assumed Staff 70 spaces 1144 Students /100 12spaces SREF Required Spaces 82 spaces Parking Shown 192 spaces

Stacking Requirements

OCPS Des. Guide- 15% of Students Capacity 1144 S.S. x 15% = 172 cars x 20’= 3,440 LF Actual Car Stacking : 253 cars LF Shown: 5,072 LF

Main Entrance Merge Point

NEW LANDSCAPE BUFFER RELOCATED CANAL CEP PLAYFIELDS BUS DROP OFF PARENT DROP OFF EXISTING CANAL WETLANDS WET RETENTION POND

TOT LOT YOUTH LOT

BIKE PARKING UTILITY COURT BASKETBALL COURTS FIRE LANE

NORTH

ORTEGA ST.

CLASSROOMS CORE CLASSROOMS GYM FUTURE PORTABLES BIKE PARKING

BANCROFT BLVD.

OVERFLOW PARKING (Non-lit fields) (Lights provided at Parking and roadways only) 142’- 5” NEW SIDEWALKS NEW SIDEWALKS NEW SIDEWALKS Area available for future classroom portables only if needed

FUTURE NATURE TRAILS FUTURE PAVILLION BUFFER

PADDOCK ST.

NEW SITE PLAN

WETLANDS

05.13.2015

slide-6
SLIDE 6

Orange County Public Schools

BUFFER ZONE CEP PLAYFIELDS WETLANDS WET RETENTION POND

TOT LOT

UTILITY COURT FIRE LANE

NORTH

ORTEGA ST.

CLASSROOMS CORE CLASSROOMS GYM

BANCROFT BLVD.

BUFFER ZONE (Non-lit fields) (Lights provided at Parking and roadways only) NEW SIDEWALKS NEW SIDEWALKS NEW SIDEWALKS

FUTURE NATURE TRAILS FUTURE PAVILLION BUFFER

PADDOCK ST.

BUFFER DIMENSIONS

WETLANDS

05.13.2015

BUFFER ZONE

149’- 6” 140’- 0” 206’-10” 274’- 0” 85’-0” 682’- 0”

slide-7
SLIDE 7

Orange County Public Schools

COLORS + TEXTURES INSIPRED BY THE NATURAL HABITAT

05.13.2015

slide-8
SLIDE 8

Orange County Public Schools

NEW ELEVATION

05.13.2015

slide-9
SLIDE 9

Orange County Public Schools

COMMUNITY PRESENTATION VIEWS

05.13.2015

slide-10
SLIDE 10

Orange County Public Schools

COMMUNITY PRESENTATION VIEWS

05.13.2015

slide-11
SLIDE 11

Orange County Public Schools

COMMUNITY PRESENTATION VIEWS

05.13.2015

slide-12
SLIDE 12

Orange County Public Schools

COMMUNITY PRESENTATION VIEWS

05.13.2015

slide-13
SLIDE 13

Orange County Public Schools

COMMUNITY PRESENTATION VIEWS

05.13.2015

slide-14
SLIDE 14

Orange County Public Schools

COMMUNITY PRESENTATION VIEWS

05.13.2015

ADMIN- DINING BUILDING

slide-15
SLIDE 15

Orange County Public Schools

COMMUNITY PRESENTATION VIEWS

05.13.2015

CLASSROOM BUILDING- FIRST FLOOR

slide-16
SLIDE 16

Orange County Public Schools

COMMUNITY PRESENTATION VIEWS

05.13.2015

CLASSROOM

slide-17
SLIDE 17

Orange County Public Schools

COMMUNITY PRESENTATION VIEWS

05.13.2015

MEDIA CENTER

slide-18
SLIDE 18

Orange County Public Schools

COMMUNITY PRESENTATION VIEWS

05.13.2015

MEDIA CENTER

slide-19
SLIDE 19

Orange County Public Schools

OVERALL SCHEDULE

05.13.2015

slide-20
SLIDE 20

Orange County Public Schools

MOBILIZATION

05.13.2015

slide-21
SLIDE 21

Orange County Public Schools

WATER & SEWER LINE COMPLETE PROJECT OUTLINE

05.13.2015

slide-22
SLIDE 22

Orange County Public Schools

WATER PIPE LINE CONSTRUCTION

05.13.2015

WATER TREATMENT PLANT TO MAXIM PARKWAY

slide-23
SLIDE 23

Orange County Public Schools

WATER PIPE LINE CONSTRUCTION

05.13.2015

NETTLETON STREET TIE-IN

slide-24
SLIDE 24

Orange County Public Schools

WATER PIPE LINE CONSTRUCTION

05.13.2015

BANCROFT BOULEVARD

slide-25
SLIDE 25

Orange County Public Schools

05.13.2015

SEWER PIPELINE CONSTRUCTION BANCROFT BOULEVARD

slide-26
SLIDE 26

Orange County Public Schools

THANK YOU