1 Project Name Type of Document 4 Cyclist Information CCTV - - PowerPoint PPT Presentation

1
SMART_READER_LITE
LIVE PREVIEW

1 Project Name Type of Document 4 Cyclist Information CCTV - - PowerPoint PPT Presentation

1 Project Name Type of Document 4 Cyclist Information CCTV Location for cyclist / pedestrian Safety CCTV Camera Direction Cycle workshop to be held on site each Friday from 2:30 to 5:30 PM for local cyclists to attend and have


slide-1
SLIDE 1

Project Name Type of Document

1

slide-2
SLIDE 2
slide-3
SLIDE 3
slide-4
SLIDE 4

Project Name Type of Document

4

1

1

2 3

2 3 5 CCTV Location for cyclist / pedestrian Safety CCTV Camera Direction Cycle workshop to be held on site each Friday from 2:30 to 5:30 PM for local cyclists to attend and have maintenance carried out on their bikes. SDC will also have a presence to discuss cycle safety and any concerns they may have with the site or cycle access.

  • Numbered Loading areas

to ease Traffic flow

1

Signage: CCTV in operation for cyclist safety

2

Signage: Please use cycle path

3

Signage: Stop Banksman / Gate house location Vehicle route

Cyclist Information

Site Boundary Note: No site deliveries after 2:30pm Friday 4

slide-5
SLIDE 5

Project Name Type of Document

5

1

3

2 3 5

  • Numbered Loading areas

to ease Traffic flow Banksman / Gate house location Vehicle route

Site Setup & Deliveries

Site Welfare Site Boundary Site Welfare Layout 4

slide-6
SLIDE 6

Project Name Type of Document

6

Block F

CCTV Location for cyclist / pedestrian Safety CCTV Camera Direction Banksman / Gate house location Vehicle route New pedestrian walkway location Walkway Visualisations

slide-7
SLIDE 7

Project Name Type of Document

7

Car Park Logistics

One-way delivery route on site Banksman/Gatehouse Car Park Exit Location