1 Ow Owne ner: Texas Department of Transportation (TxDOT) Owner - PowerPoint PPT Presentation

1 Ow Owne ner: Texas Department of Transportation (TxDOT) Owner Developer : Blueridge Transportation Group, LLC (BTG) De ACS Servicios y Concesiones. 21.6%. InfraRed Capital Partners. 21.6%. Developer Shikun & Binui


  1. 1

  2. § Ow Owne ner: Texas Department of Transportation (TxDOT) Owner Developer : Blueridge Transportation Group, LLC (BTG) § De – ACS Servicios y Concesiones.– 21.6%. – InfraRed Capital Partners. – 21.6%. Developer – Shikun & Binui Concessions USA, Inc.– 21.6%. – Northleaf Capital. – 18%. – Clal. – 12.1%. – Star America. – 5%. Equity Members § Lead C d Contractor: Almeda-Genoa Constructors (A-GC) – Dragados USA, Inc – 30%. Lead Contractor – Pulice Construction, Inc – 20%. – Shikun & Binui America – 50%. § Lead E d Engineering Fi Firm: Stantec (Formerly KBR Infra.) Joint Venture Partners § O&M : : A-GC has subcontracted with Roy Jorgensen Co. the O&M responsibilities of the Project during the Operations Lead Engineering Firm Phase 2

  3. De Develo lope per: : Bl Bluerid idge ge Transp nsportation G n Group up, L , LLC ( (BTG) ) Leasi sing ng T TXDOT Ri Right o of W Way f for a a 5 52 y year p period f from U US59 t to C Clear C Creek (just ust so sout uth o of B Beltway 8 8) Fina nanc ncing ng, Op , Operating ng a and nd M Maint ntaini ning ng T Toll R Road a and nd G Gene neral Pur Purpose se l lane nes 3

  4. Lead Con d Contractor or: : Al Almeda-Ge Geno noa a Con Constructor ors ( (A-GC GC) Respon onsible le f for or D Design a and Con d Construction on of of Pr Proj oject Con Constructing 1 10.3 .3 m mile les of of T Toll L oll Lanes Approximately ly 5 54 b bridg dges - 2 M Medi dical Con l Connector or r ramps f from om T Toll L oll Lanes - 8 R Ramps f for or IH IH 6 610 i interchange - 8 R Ramps f for or t the B Belt ltway 8 8 i interchange - 36 V Variou ous b bridg dges o over r roa oadw dways, r , railr lroa oad a d and b d bayou ous 4

  5. 5

  6. * ** 6

  7. • Demolishing & rebuilding entire interchange • Challenging bridge demolition • Excavating ponds – over 1 million cubic yard of dirt removed 7

  8. I 610 Interchange 8

  9. • Constructing 8 direct connect ramps • Over 5.5 miles of bridges in this interchange • Coordination with other project - Harris County Toll Road Widening (General Contractor - Pulice Construction) 9

  10. BW 8 Interchange 10

  11. 11

  12. Texas Medical Center 12

  13. • Financial Close achieved on 05/09/2016 • Notice to proceed achieved October 25, 2016 • Groundbreaking Ceremony on November 15, 2016 • The plan is completing the work within 1,0 ,000 da days s (33 months) of Notice to Proceed • The critical path is controlled by the work at both the IH 610 and BW 8 interchanges. 13

  14. Social Media § We Website – www.drive288.com § Fa Facebook – Drive288 § Tw Twitter – @drive288 § Em Email ail – info@drive288.com 14

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.