Π0 PLANS FOR 2020
MILO VERMEULEN — 19-12-2019
0 PLANS FOR 2020 0 PLANS FOR 2020 19-12-2019 0 S IN 2019 Truth - - PowerPoint PPT Presentation
MILO VERMEULEN 19-12-2019 0 PLANS FOR 2020 0 PLANS FOR 2020 19-12-2019 0 S IN 2019 Truth utilities linking MC to reco and vice versa General purpose 0 information extraction module
MILO VERMEULEN — 19-12-2019
Π0 PLANS FOR 2020 — 19-12-2019
Π0S IN 2019
▸ Truth utilities linking MC to reco and vice versa ▸ General purpose π0 information extraction module ▸ protoduneana/protoduneana/singlephase/
EMTaskForce/ProtoDUNEPizeroAnaTree_module.cc
▸ Single / double shower reconstruction efficiency ▸ Track contamination of showers ▸ Catching shower hits in 3D cones
Π0 PLANS FOR 2020 — 19-12-2019
Π0S IN 2020
▸ PhD deadline 1-9-2020 ▸ End goal: π0 invariant mass peak in ProtoDUNE data ▸ Handles: ▸ Shower pair topology ▸ Shower dE/dx?
Π0 PLANS FOR 2020 — 19-12-2019
Π0S IN 2020 — DE/DX
▸ Distinguish between e+/- and γ shower ▸ Photon shower: effectively two overlapping e+/- showers
e+/- e+e- γ shower shower
Π0 PLANS FOR 2020 — 19-12-2019
Π0S IN 2020 — DE/DX
▸ MIP ~ 2.12 MeV/cm (https://lar.bnl.gov/properties/) ▸ Photon should have dE/dx ~ 4.24 MeV/cm ▸ Not what we see so far
1 2 3 4 5 6 7 8 9 10 Shower dE/dx [MeV/cm] 100 200 300 400 500 600 700 All dE/dx Most energetic shower dE/dx Least energetic shower dE/dx Old plot just for illustrative purposesΠ0 PLANS FOR 2020 — 19-12-2019
Π0S IN 2020 — DE/DX
▸ Single MIP photon showers could be due to asymmetric
e+e- production
▸ Shower MC information discarded by default ▸ Could look into extra charge deposition at very start of
shower by least energetic electron/positron (~2cm)
e+e- γ shower
Π0 PLANS FOR 2020 — 19-12-2019
Π0S IN 2020 — SHOWER PAIR TOPOLOGY
▸ π0 shower pair must ideally ▸ consist of two photon showers (decided via dE/dx?) ▸ point toward a common vertex (with a certain error) ▸ both start close to this vertex (γ mean free path ~ 18 cm) ▸ produce an invariant mass close to that of π0
Π0 PLANS FOR 2020 — 19-12-2019
Π0S IN 2020 — SHOWER PAIR TOPOLOGY
▸ MC studies must produce distributions for these variables ▸ Using true π0 occurrences ▸ Apply multivariate analysis on ProtoDUNE data
Π0 PLANS FOR 2020 — 19-12-2019
CONCLUSION
▸ Change in strategy: ▸ Gain initial result through multivariate analysis ▸ Refine through optimisations (catching hits in cones,
better dE/dx shower selection, etc.)
▸ Time is pressing!