zach wassmouth project manager
play

Zach Wassmouth Project Manager 1 Parking approximate project - PowerPoint PPT Presentation

Thomas M. Menino Joanne P. Massaro Mayor Commissioner of Public Works Zach Wassmouth Project Manager 1 Parking approximate project limits Parking Strand Theatre Municipal Parking Vibrant Community and Businesses Strand Theatre


  1. Thomas M. Menino Joanne P. Massaro Mayor Commissioner of Public Works Zach Wassmouth Project Manager 1

  2. Parking approximate project limits Parking Strand Theatre

  3. Municipal Parking Vibrant Community and Businesses Strand Theatre

  4. Parking Strand 2 minute walking distance 4 minute walking distance 5 minute walking distance 3 minute walking distance

  5. Upham’s Corner Station

  6. 15 41 16 17 Bus Route Description Number 15 Kane Square or Fields Corner Station to Ruggles Station, via Upham’s Corner 16 Forest Hills Station via South Bay Center & Franklin Park to Andrew Station or UMass via Upham’s Corner & Mall 17 Fields Corner Station to Andrew Station via Upham’s Corner and Edward Everett Square 41 Centre St. & Eliot St. via Dudley Station & Jackson Station to JFK/UMass Station via Upham’s Corner

  7. In designated areas 4 3 Within Uphams 6 On Stoughton Street 3 2 Approx. 7 Within Uphams

  8. 1. Pedestrian Safety 2. Green/Sustainable Design 3. Sidewalk Materials 4. Traffic Flow 5. Parking 6. Amenities 7. Bicycles 8. Public Art

  9. Parking Area Parking Area 1. Enhanced Crosswalks 2. Streetlights 3. Stormwater 4. Concrete Sidewalks Management with Brick Accent Strip 9

  10. Public Art

  11. 12

  12. 13

  13. Dudley Street Church Citizens Bank Ramsey St Columbia Road Strand Bank of Theatre America Sovereign Bank Concept 1 Characteristics On-Street Parking Provide mid-block crossing Install new street lighting 19 Spaces - Existing On-Street Parking • • Extend median island Retain on-street parking 11 Spaces - Remaining • • 8 Spaces - Lost Improve pedestrian crossings with the Provide sharrow lane • • stamping bicycle accommodations Provide way finding and landscaping •

  14. Concept 1 Cross-Sections

  15. Church Citizens Bank Columbia Road Concept 2 Characteristics On-Street Parking Provide mid-block crossing 19 Spaces - Existing On-Street Parking Install new street lighting • • Extend median island 2 Spaces - Remaining Retain couple on-street • • 17 Spaces - Lost Improve pedestrian crossings with the parking on the north side of • stamping roadway Provide way finding and landscaping Provide exclusive bicycle lanes • • on both sides of the roadway

  16. Concept 2 Cross-Section

  17. Church Citizens Bank Columbia Road Concept 2 Characteristics Provide mid-block crossing Install new street lighting • • On-Street Parking Install a partial median island Retain on-street parking on • • Improve pedestrian crossings with the the north side only • 19 Spaces - Existing On-Street Parking stamping 9 Spaces - Remaining Provide exclusive bicycle • 10 Spaces - Lost Provide way finding and landscaping lanes on both sides of the • roadway

  18. Concept 3 Cross-Section

  19. = public meeting

  20. QUESTIONS • website - www.cityofboston.gov/publicworks/engineering

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.

Recommend


More recommend