Zach Wassmouth Project Manager 1 Parking approximate project - - PowerPoint PPT Presentation

zach wassmouth project manager
SMART_READER_LITE
LIVE PREVIEW

Zach Wassmouth Project Manager 1 Parking approximate project - - PowerPoint PPT Presentation

Thomas M. Menino Joanne P. Massaro Mayor Commissioner of Public Works Zach Wassmouth Project Manager 1 Parking approximate project limits Parking Strand Theatre Municipal Parking Vibrant Community and Businesses Strand Theatre


slide-1
SLIDE 1

Zach Wassmouth Project Manager

Joanne P. Massaro Commissioner of Public Works Thomas M. Menino Mayor 1

slide-2
SLIDE 2

Parking Strand Theatre

approximate project limits

Parking

slide-3
SLIDE 3

Strand Theatre Municipal Parking

Vibrant Community and Businesses

slide-4
SLIDE 4

2 minute walking distance 3 minute walking distance 4 minute walking distance 5 minute walking distance Strand Parking

slide-5
SLIDE 5

Upham’s Corner Station

slide-6
SLIDE 6

41 16 15 17

Bus Route Number Description 15 Kane Square or Fields Corner Station to Ruggles Station, via Upham’s Corner 16 Forest Hills Station via South Bay Center & Franklin Park to Andrew Station or UMass via Upham’s Corner & Mall 17 Fields Corner Station to Andrew Station via Upham’s Corner and Edward Everett Square 41 Centre St. & Eliot St. via Dudley Station & Jackson Station to JFK/UMass Station via Upham’s Corner

slide-7
SLIDE 7

4 3 Within Uphams 6 3 2 On Stoughton Street In designated areas

  • Approx. 7

Within Uphams

slide-8
SLIDE 8
  • 1. Pedestrian Safety
  • 2. Green/Sustainable Design
  • 3. Sidewalk Materials
  • 4. Traffic Flow
  • 5. Parking
  • 6. Amenities
  • 7. Bicycles
  • 8. Public Art
slide-9
SLIDE 9

Parking Area Parking Area

  • 1. Enhanced Crosswalks

9

  • 4. Concrete Sidewalks

with Brick Accent Strip

  • 3. Stormwater

Management

  • 2. Streetlights
slide-10
SLIDE 10

Public Art

slide-11
SLIDE 11
slide-12
SLIDE 12

12

slide-13
SLIDE 13

13

slide-14
SLIDE 14

Concept 1 Characteristics

  • Provide mid-block crossing
  • Extend median island
  • Improve pedestrian crossings with the

stamping

  • Provide way finding and landscaping
  • Install new street lighting
  • Retain on-street parking
  • Provide sharrow lane

bicycle accommodations

On-Street Parking

19 Spaces - Existing On-Street Parking 11 Spaces - Remaining 8 Spaces - Lost Columbia Road Dudley Street Ramsey St

Sovereign Bank Bank of America Strand Theatre Citizens Bank Church

slide-15
SLIDE 15

Concept 1 Cross-Sections

slide-16
SLIDE 16

Concept 2 Characteristics

  • Provide mid-block crossing
  • Extend median island
  • Improve pedestrian crossings with the

stamping

  • Provide way finding and landscaping
  • Install new street lighting
  • Retain couple on-street

parking on the north side of roadway

  • Provide exclusive bicycle lanes
  • n both sides of the roadway

Columbia Road

Citizens Bank Church

On-Street Parking

19 Spaces - Existing On-Street Parking 2 Spaces - Remaining 17 Spaces - Lost

slide-17
SLIDE 17

Concept 2 Cross-Section

slide-18
SLIDE 18

Columbia Road

Citizens Bank Church

Concept 2 Characteristics

  • Provide mid-block crossing
  • Install a partial median island
  • Improve pedestrian crossings with the

stamping

  • Provide way finding and landscaping
  • Install new street lighting
  • Retain on-street parking on

the north side only

  • Provide exclusive bicycle

lanes on both sides of the roadway

On-Street Parking

19 Spaces - Existing On-Street Parking 9 Spaces - Remaining 10 Spaces - Lost