WSDOT OR Local Programs-LPE Update WSDOT OR Local Programs Frequently Asked ROW Questions Bryan Dias, PE (360) 357-2631, diasb@wsdot.wa.gov 7/2019 Does My Project Need ROW ? Can your project be built In its entirety within current ROW ?


slide-1
SLIDE 1

ywvutsrqponmlkjihgfedcaWTSRQPONMLIFDC

WSDOT OR Local Programs-LPE Update

WSDOT OR Local Programs

Frequently Asked ROW Questions

Bryan Dias, PE (360) 357-2631, diasb@wsdot.wa.gov

7/2019

Does My Project Need ROW ?

  • Can your project be built In its entirety within current ROW ?
  • Do you require and temporary construction easements ?
  • Do you require a permit ?
  • Is the temporary permit between another governmental

agency

  • Review Section 25.4 LAG Manual
  • NO ROW Verification training

https://www.wsdot.wa.gov/publications/fulltext/localprogra ms/NoROWVerification/story_html5.html

2

What is required to start ROW acquisition w ith Federal Dollars ?

  • Project is on the STIP
  • Current (less than 3 years old) Approved NEPA
  • PFE
  • Approved ROW Plans
  • Approved relocation plan

3

1

slide-2
SLIDE 2

ywvutsrqponmlkjihgfedcaWTSRQPONMLIFDC

WSDOT OR Local Programs-LPE Update

Do state funded projects need a ROW Certification

While there is an expectation that the uniform process will be followed on State Funded projects a certification process by Local Programs is not required.

4

What is ROW Certification ?

  • A statement that sufficient property rights to construct,
  • perate, and maintain the facility as shown on the PS&E

have been obtained

  • ROW is clear of encroachments
  • ROW was been acquired with the URA and /or the Federal

Land Transfer Process

5

What are the three kinds of ROW certifications ?

  • Certificate 1 (most preferred)
  • Certificate 2
  • Certificate 3 (least preferred)

6

2

slide-3
SLIDE 3

WSDOT OR Local Programs-LPE Update

What is a Certification 1 ?

  • All necessary rights have been acquired
  • Deed or physical possession and use obtained … Legal ownership not

mandatory

  • Trial or appeal cases may be pending but legal possession
  • All occupants have vacated the ROW
  • Right to enter on all land
  • Right to remove salvage or demolish any remaining

improvements

  • WSDOT does not allow CERT 1 on a possession and use

agreement

7

What is a Certification 2 ?

  • Right to occupy all ROW
  • Trial or appeal of some parcels may be pending
  • Some parcels have rights to entry only. Possession and use or legal ownership

has not been obtained.

  • All occupants have vacated the ROW
  • Right to enter on all land
  • Right to remove salvage or demolish any remaining

improvements

8

What is a certification 3 ?

  • All ROW not acquired
  • Acquisition of a few parcels not complete
  • All occupants have had replacement housing made available

per 49 CFR 24.204 but may not have moved

  • Justification is required
  • Full explanations and reasons
  • Identify each outstanding parcel
  • Provide realistic date of physical occupancy and use

TWO certification options Excepted Parcel and Time Based

9

3

slide-4
SLIDE 4

WSDOT OR Local Programs-LPE Update 4

Certification 3 cont.

Time based

  • Agreement that payment and relocation be completed prior to bid opening
  • Allows use of time between ad and bid opening

Excepted Parcel

  • Must notify bidders of locations where right of occupancy not obtained
  • Contractors must work around the parcel
  • Rarely used

Certification 3 should be an exception

10

Who do I contact if I have ROW questions

Bryan Dias OR Local Programs Engineer (360) 357-2631, diasb@wsdot.wa.gov Michelle Newlean HQ Local Programs (360) 705‐7329

11

Questions