yiot expansion
play

YIOT EXPANSION NOV 3, 2018 , AGENDA Introduction SNS - PowerPoint PPT Presentation

LOOKING AHEAD YIOT EXPANSION NOV 3, 2018 , AGENDA Introduction SNS Presentation Sanctuary Seating & Growth Beit Medrash Social Hall Youth Programming Lobby Design & Function Capital Campaign Road


  1. LOOKING AHEAD YIOT EXPANSION NOV 3, 2018 • ט״עשת , ןושׂח ו״כ

  2. AGENDA Introduction SNS Presentation Sanctuary Seating & Growth Beit Medrash Social Hall Youth Programming Lobby Design & Function Capital Campaign Road Map & Planning Q&A

  3. RABBI BINYOMIN KROHN INTRODUCTION

  4. JOHN LIGNOS & JOHN FOTIADIS SNS ARCHITECTS & ENGINEERS

  5. GARY STEINMETZ, YAACOV WEINSTOCK SANCTUARY SEATING & GROWTH

  6. SHELDON LIEBB BEIT MEDRASH

  7. EXISTING BEIT NEW BEIT MEDRASH MEDRASH + 1,000 SQ FT 1,730 SQ FT 730 SQ FT

  8. BENA SCHWARTZ SOCIAL HALL

  9. EXISTING SOCIAL HALL 1,334 SQ FT NEW SOCIAL HALL 2,490 SQ FT + 1,156 SQ FT

  10. DEENA ROSENBERG, HEZZY JESIN YOUTH PROGRAMMING

  11. CURRENT YOUTH NEEDS • 400 children within the community • On average, 100-125 attend groups each Shabbat: • 15-25 in each of Nursery, PreK, Grade 1-2 Boys and 1-2 Girls • 10-30 in Junior Congregation • Currently use six youth spaces • Three on main floor • Two upstairs • Beit Medrash

  12. BENEFITS OF PLANNED EXPANSION • 8 classrooms • From 1,250 sq ft to 2,595 sq ft • Rooms can combine or divide • Locked storage • Kitchen and bathroom access • Appropriate emergency exits • All on one floor for noise and flow control • Potential source of rental income

  13. STEVE HORWITZ, ISSAR KIEFFER & JEREMY FRANK LOBBY DESIGN 
 AND FUNCTION

  14. LOBBY • New entrance to the building • Congregation and socialization • Central access to coat room, bathrooms, stair and elevator • Combination of form and functionality • Coat room out of view

  15. GALLERIA • Bridge between old and new • Separation between main sanctuary and social hall • Reception area • Double volume and glass allows light into building • Wide, open space • Wide airlock access to sanctuary mitigates noise • Centrally located washing station • Bookcases and cubbies • Three exits prevent congestion

  16. RUVEN ELLBERGER CAPITAL

  17. $4M $3.75M $3M PLEDGES BUILDING FUND SISTERHOOD $2M $1.20M $1M EXPANSION 
 CAMPAIGN $0M TARGET CURRENT

  18. THE PROCESS CAPITAL SUB-COMMITTEE • Ruven Ellberger • Estimate costs and collections • Gamy Frankel • Fundraising campaign and dedications • Michelle Jaffe • YOU! • Hezzy Jesin • Esta Luber • Michael Wimpfheimer • Shlomo Yaros

  19. YAAKOV PULTMAN ROAD MAP 
 & PLANNING

  20. Q&A

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.