YIELDSUMMARY GROSSFLOORAREA (15YRVISION ) MARKETCAPTURE - - PowerPoint PPT Presentation

yield summary
SMART_READER_LITE
LIVE PREVIEW

YIELDSUMMARY GROSSFLOORAREA (15YRVISION ) MARKETCAPTURE - - PowerPoint PPT Presentation

YIELDSUMMARY GROSSFLOORAREA (15YRVISION ) MARKETCAPTURE (10YRPROJECTION) RETAIL 137.0K 23 76K OFFICE 1,000 1,400K 2,454.6K FLEX 92 777K 133.8K HOTEL 260 390RM


slide-1
SLIDE 1
slide-2
SLIDE 2

RETAIL OFFICE FLEX HOTEL

FAR1.2

137.0K 2,454.6K 133.8K 300RM(340.0K) 3,065.4K 23 76K 1,000– 1,400K 92 777K 260– 390RM 1,979– 2,343K MARKETCAPTURE(10YRPROJECTION)

YIELDSUMMARY

GROSSFLOORAREA(15YRVISION)

slide-3
SLIDE 3

PRELIMINARY CONCEPT SKETCH PLAN

slide-4
SLIDE 4
slide-5
SLIDE 5

OFFICE |CREATIVECLASSA HOTEL |W/CONFERENCE OFFICE |SIGNATURETOWER

LANDUSES

FLEX |R&DMULTITENANT OFFICE |CLASSB OFFICE +RETAIL | LINER RETAIL|MARKET/EATERY HOTEL| BOUTIQUE

slide-6
SLIDE 6
slide-7
SLIDE 7

REGIONAL TRAVELLERS

✓ NEEDS FAST & DEDICATED ACCESS TO THE AIRPORT ✓ NEEDS UNIMPEDED LOOP ROAD AROUND PARKING FACILITY ✓ MAY INCEASINGLY USE TRANSIT CONNECTIONS

ITINERARIES

slide-8
SLIDE 8

✓ COMMITTED TO TRANSIT ALTERNATIVES & SUSTAINABILITY ✓ PREFERS CAMPUS THAT FOSTERS CREATIVITY / INTERACTION ✓ WANTS ALTERNATIVE TRAVEL MODES AWAY FROM MOST TRAFFIC

ITINERARIES

KNOWLEDGE WORKERS

slide-9
SLIDE 9

LOCAL ENTREPENUER

✓ WANTS TO AVOID AIRPORT TRAFFIC ✓ NEEDS A NO-HASSLE ROUTE TO WORK ✓ WANTS TO PUT THE CAR AWAY QUICKLY

ITINERARIES

slide-10
SLIDE 10

✓ EXCLUSIVELY PEDESTRIAN (MAY STAY AT SITE) ✓ WANTS PLACES TO COLLABORATE W/ LESS LOCAL TRAFFIC ✓ WANTS HIGH-END AMENITIES AND RELAXING SETTING

CORPORATE VISITORS

ITINERARIES

slide-11
SLIDE 11
slide-12
SLIDE 12

Preliminary Terminal Concept Second Floor

30

slide-13
SLIDE 13

Preliminary Terminal Concept First Floor

29

slide-14
SLIDE 14

Replacement Terminal Design Aircraft

6

slide-15
SLIDE 15

Primary Differences

  • Authority Administration Space
  • Gate Access Corridor
  • Baggage Meeter/Greeter Lobby
  • Outbound Baggage
  • Security

– Baggage Screening Area

11

slide-16
SLIDE 16

Terminal

7

  • Existing Terminal

– 14 Gates – 6,631 Parking Spaces – 210,599 SF

  • Excludes Apron Space Uses
  • Replacement Terminal Size

– 14 Gates – 6,631 Parking Spaces – 355,102 SF

  • Net Increase = 144,503 SF (68.6% increase)
slide-17
SLIDE 17

The Goal

  • Replace an 83-year-old building with a

safe, modern 14-gate terminal

– Meets current earthquake design standards – Meets FAA standards for distance from the runways

  • Invests $300-400M in Burbank’s economy

– funded by the FAA, airlines, and airport users – NOT Burbank taxpayers

  • Creates a substantial number of terminal

related jobs in construction, transportation, and services

1

slide-18
SLIDE 18

What passengers and residents want

  • Don’t “screw it up!”

–Still convenient with

  • Close-in parking
  • Easier to use
  • More amenities
  • Don’t use local taxes to pay for it!

2

slide-19
SLIDE 19
slide-20
SLIDE 20

Project Description – Non-Aviation Development

  • An office, retail, hotel and light industrial

development project on approximately 56.7 acres

– up to approximately 3 million square feet of floor area – have a floor area ratio of up to 1.25 – up to 8,189 structured and surface development- related (not Airport terminal-related) parking spaces, internal roadways and pedestrian pathways and amenities – primary vehicular access from Hollywood Way near the intersection of Hollywood Way and Tulare Avenue

4

slide-21
SLIDE 21

Project Description – Aviation Development

  • Airport-related development proposed on several

parcels of Authority owned land

– A 14-gate replacement passenger terminal building totaling approximately 355,000 square feet – Two public automobile parking structures for approximately 2,000 passenger vehicles each (up to 4,000 total) but with approximately 2.5 acres of the southerly structure and terminal access roadway located on the “Trust Parcel” – Total public parking spaces for Airport terminal-related purposes will be limited to an aggregate total of 6,631 spaces (same as current)

5

slide-22
SLIDE 22

Project Description – Aviation Development

– Approximately 600 surface employee parking spaces – The construction of an approximate .75 mile loop Airport terminal access and recirculation road – The removal of all existing 1,592 surface public parking spaces and 567 employee parking spaces in Parking Lot A for reuse as the main terminal access roadway – The construction of a central utility plant located north of the proposed replacement terminal building

6

slide-23
SLIDE 23

Project Description – Aviation Development

– The construction of a new air-cargo building of approximately 16,600 square feet to be used for processing belly cargo carried aboard passenger aircraft as well as maintenance of terminal ground service equipment – Demolition of the existing approximately 16,600-square-foot air cargo and ground service equipment building and associated parking area located in the southwest quadrant

  • f the air field and immediately adjacent to

Taxiway G with no plans for an alternative building on that site

7

slide-24
SLIDE 24

Project Description – Aviation Development

– Relocation of portions of Airport Administrative offices into an existing stand-alone office building of approximately 35,700 square feet of floor space – Construction of a permanent replacement airport fire station immediately east of the existing FAA control tower with five truck bays in an approximate 19,000 sf free-standing building – Removal of the existing temporary modular fire station building and equipment floor (approximately 14,000 sf) located within general aviation Hangar 35 in the Airport’s northwest quadrant. The hangar will revert back to general aviation operations

8

slide-25
SLIDE 25

Project Description – Aviation Development

– Demolition of the existing passenger terminal building, adjacent four-level public parking structure, Lot E, portions of the existing terminal access roadway, employee parking lot, and partial relocation of the existing terminal access road to the south – Extension of Taxiway A located easterly of Runway 15- 33 and south of Runway 8-26 in the area vacated by demolition of the existing terminal building – Extension of Taxiway C located south of Runway 8-26 and east of Runway 15-33 in the area vacated by demolition of the existing passenger terminal building – Extension of Airfield Service Road inside the perimeter fence

9

slide-26
SLIDE 26

Project Description – Aviation Development

– Re-routing of off-site parking bus operations to accommodate the relocation of parking and terminal facilities – Closure of Parking Lot B for Airport passenger parking and the placement of a restrictive covenant precluding airport uses not compatible with runway protection zone restrictions for safety – Closure of Parking Lot C

10

slide-27
SLIDE 27

PROJECT TIMELINE – NEXT STEPS