Wyoming EORI 3nd Annual Wyoming CO 2 Conference 6/23/09 The Beaver Creek Field Madison CO 2 Project Spring 2009 Update Chuck Peterson, PE Sr. Advisor - Reservoir Engineering Beaver Creek Field Madison CO 2 Flood Project Presentation


  1. Wyoming EORI 3nd Annual Wyoming CO 2 Conference 6/23/09 The Beaver Creek Field Madison CO 2 Project – Spring 2009 Update Chuck Peterson, PE – Sr. Advisor - Reservoir Engineering

  2. Beaver Creek Field Madison CO 2 Flood Project Presentation Overview Geographic S etting Geologic and Reservoir setting Field History Final Proj ect Design Proj ect Construction Flood S tatus & Response NYS E: DVN www.devonenergy.com page 2

  3. CO 2 Floods in Wyoming CO 2 Floods in Wyoming Devon Beaver Creek Field Anadarko Salt Creek Field Merit Energy Anadarko Wertz/Lost Soldier Patrick Draw Monel Unit NYS E: DVN www.devonenergy.com page 3

  4. Beaver Creek Madison Structure Beaver Creek Madison Structure 0 0 3 6 - 57 Reservoir Characteristics Type Log 69 Approximate 0 0 1 6 - Porosity = 10% Oil - Water 0 0 0 6 - Contact Permeability = 9 md 30 0 34 0 9 5 o F - Reservoir Temp = 234 147 BHPi = 5301 psia 107 GORi = 288 scf/bbl 39-M 46 45 Bubble Pt. = 673 psia 127 9 10 - 42 5 00 8 Swi = 10% 104 0 2 0 6 o API 11 - 52 Oil Gravity = 39.5 14 56 77 68 41 0 - 32 0 7 5 5 Geologic Characteristics 66 7 - 40 0 44 96 0 117 38 - 6 - Limestone/Dolomite Matrix 81 6 1 0 0 55 0 0 0 - 5 Approx. Prod. Area = 974 Acres 8 0 31 0 0 146 22 0 6 5 143 - Approx. Oil Column Height = 17 43 139 136 820’ W 0 137 0 9 5 124 Avg. Net Pay Thickness = 212’ - Active Oil Producer Avg. Depth to Madison Top = Active Water Injector 11,100’ 16 15 0 1,518 NYS E: DVN www.devonenergy.com page 4 FEET PETRA 12/13/2005 5:04:00 PM

  5. Madison Log Section A Zone Top GR/ Bulk Density B Zone Top C Zone Top D Zone Top BCU #127 Well Top @ 11224’ MD E Zone Top Bottom @ 11723’ MD F Zone Top Madison Base NYS E: DVN www.devonenergy.com page 5

  6. Beaver Creek Madison Beaver Creek Madison Pre- -CO CO 2 Flood Production History Pre 2 Flood Production History Beaver Creek Madison Unit Production History 100,000 10,000 Monthly Volumes (Bpd, Mcfd) Oil Gas Water 1,000 WINJ 100 Discovered January 1954 Main Block (Target) OOIP = 109 MMbo Waterflood initiated in 1959 Cum Oil = 42.5 MMbo (39% OOIP) Developed with 36 completions Rem Primary/Secondary = 2.6 MMbo 10 Jan-50 Jan-60 Jan-70 Jan-80 Jan-90 Dec-99 Dec-09 NYS E: DVN www.devonenergy.com page 6

  7. Flood Plan Peripheral CO 2 -WAG 14 Injectors: 8 WAG injectors 6 CO2 injectors 57 16 Producers 69 Low confidence B inside this area 12 Shut-in or producing 30 34 A from other formation or 147 E TA F C Detail: 39 3 well conversion (prod->Inj): 45 46 D 127 44, 146, 143 J H G 8 old producers: 42 11, 38, 41, 46, 68, 147, 66, 81 L 11 K 2 shut-in: 14 56 14, 96 68 77 6 old injectors: I 41 40, 17, 30, 32, 45, 139 7 new producers: 32 66 44 40 D, E, F, G, H, I, J, L 96 38 4 new injectors: us A, B, C, K 55 81 tive 1 Injector reactivation: 61 ctive 31 ctor 146 22 17 1 Producer reactivation: 143 77 139 43 NYS E: DVN www.devonenergy.com page 7

  8. Flood Preparation Work Requirements • Convert 2 wells from producer to injector • Rework or recomplete 9 producers & 7 injectors • Drill 7 new producers & 5 new injectors • Construct Production & Injection Facilities • Install New Flowlines for Producers & Injectors • Build CO2 Supply Pipeline NYS E: DVN www.devonenergy.com page 8

  9. Madison CO 2 Flood Status Where Are We At Today? Construction & Wellwork � CO 2 source pipeline completed & tested S pring 2008 � Inj ection facilities completed S pring 2008 � Production facilities completed Fall 2008 � Drilling, completion and other wellwork completed Fall 2008 � Recycle compressors installed and on line S pring 2009 CO 2 Flood Process � CO 2 Inj ection initiated July3, 2008 � 10.7 Bcfg inj ected to date � Flood response observed in 7 of the 16 producers � CO 2 indications observed in 9 if the 16 producers � Continued monitoring of production data and adj usting our flood � Flow rate adj ustments � Gas distribution adj ustments NYS E: DVN www.devonenergy.com page 9

  10. Madison CO 2 Flood Production 100000.00 Initiated CO 2 Injection Current Rate Pre-Flood 10000.00 7/3/08 1200 Bopd 320 Bopd 22000 Bwpd 32000 Bwpd 1000.00 Water (Bwpd) Oil (Bopd) 100.00 Well count Oil Cut (%) 10.00 1.00 Oil Cut Increase from 1% to 5% 0.10 January-2007 January-2008 January-2009 January-2010 NYS E: DVN www.devonenergy.com page 10

  11. Madison CO 2 Injection Response 6/09 Oil Production Increase 2 6 0 0 7 6 0 0 6 6 6 0 900 0 1 6 0 0 5 6 0 0 0 0 6 0 8 0 6 0 6800 4 6 G BCU 10-21 BCU 30 0 0 3 58 6 0 0 9 5 7 0 BCU 147 0 0 G BCU 10-12 0 G 0 BCU 10-41X 0 2 0 0 6 8 5 BCU 10-22-2 0 35 6 9 10 7 BCU 10-32 BCU 46 00 6 BCU 45 0 7 0 G 0 0 BCU 10-42 0 0 6 1 BCU 10-12-2 6 6 0 0 BCU 10-22 0 5 0 0 6 900 BCU 11 BCU 10-13 0 6 0 0 6 G 6 BCU 10-33 0 BCU 10-43 0 BCU 10-23 0 0 161 BCU 77 0 BCU 68 5 0 BCU 41 7 0 9 5 0 82 G BCU 32 0 0 5 6 0 0 300 6 7 BCU 66 G 50 5 BCU 40 0 BCU 44 BCU 96 5 BCU 38 104 8 0 0 BCU 81 0 BCU 31 6 BCU 146 4 0 0 BCU 143 G BCU 17 G BCU 139 6 6 0 6 0 0 7 0 0 Zone: MADISON - WELL_UTILITY [CAP] Contains "prod" 0 6 6 5 300 Zone: MADISON - WELL_UTILITY [CAP] Contains "giw" 0 1,017 5 9 Zone: MADISON - WELL_UTILITY [CAP] Contains "wag" 0 0 6 2 FEET 0 0 PETRA 6/16/2009 5:11:02 PM NYS E: DVN www.devonenergy.com page 11

  12. Madison CO 2 Injection Response 6/09 Produced Gas CO 2 % 2 6 0 0 7 6 0 0 6 6 6 0 9 0 0 1 6 0 0 0 5 6 0 0 0 0 6 0 8 0 0 6 6800 4 6 G BCU 10-21 BCU 30 0 0 3 11 3/09 6 0 0 9 5 7 0 0 BCU 147 0 G BCU 10-12 62 3/09 G 0 BCU 10-41X 0 2 0 0 8 6 5 BCU 10-22-2 90 6/09 2 3/09 6 9 10 7 BCU 10-32 BCU 46 1 3/09 0 6 BCU 45 0 7 0 G 0 BCU 10-42 0 0 6 1 BCU 10-12-2 6 6 0 0 61 6/09 93 6/09 BCU 10-22 1 6/09 1 6/09 6 BCU 11 900 BCU 10-13 0 0 6 0 6 G BCU 10-33 6 0 1 6/09 BCU 10-43 BCU 10-23 0 95 6/09 86 6/09 BCU 77 0 BCU 68 5 BCU 41 7 0 9 0 5 0 88 6/09 G BCU 32 0 6 0 80 6/09 5 0 0 6 7 BCU 66 G 5 5 BCU 40 0 0 BCU 44 84 6/09 BCU 96 5 BCU 38 8 0 0 BCU 81 BCU 31 6 4 BCU 146 0 0 BCU 143 G BCU 17 G BCU 139 6 6 0 0 6 0 7 0 0 0 Zone: MADISON - WELL_UTILITY [CAP] Contains "prod" 6 6 5 300 Zone: MADISON - WELL_UTILITY [CAP] Contains "giw" 0 1,017 5 9 Zone: MADISON - WELL_UTILITY [CAP] Contains "wag" 0 0 6 2 FEET 0 0 PETRA 6/16/2009 6:09:36 PM NYS E: DVN www.devonenergy.com page 12

  13. BCU 10-41 Injection Wellhead page 13 www.devonenergy.com E: DVN NYS

  14. page 14 BCU 10-33 & BCU 10-41 2 Well Pad Location www.devonenergy.com E: DVN NYS

  15. page 15 CO 2 Injection Header www.devonenergy.com E: DVN NYS

  16. page 16 Production Header www.devonenergy.com E: DVN NYS

  17. 8” CO 2 Supply Pipeline Delivery Point page 17 www.devonenergy.com E: DVN NYS

  18. page 18 CO 2 Recycle Compression www.devonenergy.com E: DVN NYS

  19. Recycle Compression Facility page 19 www.devonenergy.com E: DVN NYS

  20. Storage Tanks / Dehydration page 20 www.devonenergy.com E: DVN NYS

  21. Separation/Dehydration Facility page 21 www.devonenergy.com E: DVN NYS

  22. page 22 Separation Vessels www.devonenergy.com E: DVN NYS

  23. page 23 Production Facility Building www.devonenergy.com E: DVN NYS

  24. Production Facility Building NYS E: DVN www.devonenergy.com page 24

  25. Managing Start-up Operations page 25 www.devonenergy.com E: DVN NYS

  26. Thank You.

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.