Winooski/Burlington, US RTs 2 & 7 Bridge Scoping Study Ag e nda - - PowerPoint PPT Presentation

winooski burlington us rts 2 7 bridge scoping study ag e
SMART_READER_LITE
LIVE PREVIEW

Winooski/Burlington, US RTs 2 & 7 Bridge Scoping Study Ag e nda - - PowerPoint PPT Presentation

CHITTENDEN COUNTY REGIONAL PLANNING COMMISSION Winooski/Burlington, US RTs 2 & 7 Bridge Scoping Study Ag e nda : 1. We lc o me / I ntro duc tio ns 2. Sc o pe o f Wo rk Ove rvie w: Pre se nta tio n fro m Mc F a rla nd Jo hnso n Majo


slide-1
SLIDE 1

CHITTENDEN COUNTY REGIONAL PLANNING COMMISSION

Winooski/Burlington, US RTs 2 & 7 Bridge Scoping Study

slide-2
SLIDE 2

Ag e nda :

  • 1. We lc o me / I

ntro duc tio ns

  • 2. Sc o pe o f Wo rk Ove rvie w: Pre se nta tio n fro m Mc F

a rla nd Jo hnso n

  • Majo r tasks and mile sto ne s;
  • b ridg e and traffic alte rnative s;
  • Adviso ry Co mmitte e me e ting s and c o mmitte e ro le ;
  • 3. Adviso ry Co mmitte e I

nput: Que stio ns/ c o nc e rns fro m me mb e rs’ pe rspe c tive s

  • 4. Me mb e rs/ Othe r I

te ms

  • 5. Ne xt Ste ps
  • 6. Ne xt Me e ting : Re vie w/ Disc uss pro je c t purpo se a nd ne e d sta te me nt
slide-3
SLIDE 3

Ma jo r T a sks a nd Mile sto ne s:

Task/Milestone Estimated Timeline Data Collection & Analysis May – July 2017 Purpose and Need Statement July – September 2017 Public Participation

  • Advisory Committee Mtgs.
  • Project Website and Web Survey
  • Stakeholder Outreach
  • Draft Alternatives Workshop & Local Concerns Mtg.

June 2017 – May 2018 Development of Alternatives September 2017 – February 2018 Evaluation of Alternatives February – May 2018 Alternatives Presentation

  • Winooski City Council
  • Burlington City Council

June 2018 Scoping Report June – August 2018

slide-4
SLIDE 4

E xisting Bridg e :

slide-5
SLIDE 5

E xisting Bridg e :

slide-6
SLIDE 6

E xisting Bridg e :

slide-7
SLIDE 7

Pro po se d Bridg e – F

  • ur Alte rna tive s
  • 1. Bridg e Re ha b ilita tio n
  • 2. Bridg e Supe rstruc ture

Re pla c e me nt a nd Sub struc ture Wide ning

  • 3. Bridg e Re pla c e me nt –

T wo -Spa n Struc ture

  • 4. Bridg e Re pla c e me nt –

Sing le Spa n Struc ture

slide-8
SLIDE 8

On Bridg e lo o king no rth to wa rds Wino o ski.

On So uth e nd o f Brid g e L

  • o king so uth to wa rd s Burling to n.

E xisting Ro a dwa y a nd T ra ffic

slide-9
SLIDE 9

Wino o ski e nd o f b ridg e lo o king so uth. T ra ffic a ro und Ro ta ry Pa rk in Wino o ski.

E xisting Ro a dwa y a nd T ra ffic

slide-10
SLIDE 10

L a ne Co nfig ura tio ns – Pe rma ne nt T ypic a l Se c tio ns

  • 1. T

hre e L a ne s

  • T

wo no rth a nd o ne so uth

  • 2. F
  • ur L

a ne s

slide-11
SLIDE 11

L a ne Co nfig ura tio ns – T e mpo ra ry T ypic a l Se c tio ns during Bridg e Co nstruc tio n

  • 1. Alte rna ting One -Wa y T

ra ffic (two -pha se c o nstruc tio n)

  • 2. Sing le L

a ne Ma inta ine d in E a c h Dire c tio n (thre e -pha se c o nstruc tio n)

  • 3. Co mple te Clo sure
slide-12
SLIDE 12

Adviso ry Co mmitte e Ro ste r

Name Association Email

Jon Griffin VTrans Jonathan.Griffin@vermont.gov Dick Hosking VTrans Dick.Hosking@vermont.gov Amy Bell VTrans amy.bell@vermont.gov Peter Wernsdorfer Winooski pmwernsdorfer@winooskivt.org Brian Corrigan Winooski Deputy Mayor bcorrigan@winooskivt.org Ryan Lambert Winooski rlambert@winooskivt.org Nicole Losch Burlington NLosch@burlingtonvt.gov Sharon Bushor Burlington City Council sbushor@burlingtonvt.gov Dave Armstrong GMT darmstrong@ridegmt.com Sandy Thibault CATMA sandy@catmavt.org Katelin Brewer-Colie Local Motion katelin@localmotion.org David Keelty UVM Medical Center Dave.Keelty@uvmhealth.org Richard Hillyard Burlington Ward 1 NPA pompeyhccc@hotmail.com Wayne Senville Alternate for Ward 1 wsenville@gmail.com

slide-13
SLIDE 13

Adviso ry Co mmitte e – F

  • ur Me e ting s

Meeting Date

Kickoff June 7, 2017 Purpose and Need Late July 2017 Development of Alternatives Late September 2017 Evaluation of Alternatives April 2018

slide-14
SLIDE 14

Ag e nda (c o ntinue d):

  • Adviso ry Co mmitte e I

nput: Que stio ns/ c o nc e rns fro m me mb e rs’ pe rspe c tive

  • Me mb e rs/ Othe r I

te ms

  • Ne xt Ste ps
  • Ne xt Me e ting : Re vie w/ Disc uss pro je c t purpo se a nd ne e d

sta te me nt