Western Alignment & Future Vehicle Maintenance and Storage Facility Update

1

Welcome to the Online Consultation

Western Alignment & Vehicle Maintenance & Storage Facility Update

Please review the presentation and complete the survey by July 10, 2012.

slide-2
SLIDE 2

Western Alignment & Future Vehicle Maintenance and Storage Facility Update

1

Format for Feedback

  • Please complete the online survey at www.thecrosstown.ca by

July 10, 2012

  • A consultation report to inform the designers will be posted
  • nline at: www.thecrosstown.ca
slide-3
SLIDE 3

Western Alignment & Future Vehicle Maintenance and Storage Facility Update

2

Online Consultation Overview

Part 1

  • Crosstown Background, Key Developments & Construction Update

Part 2

  • New Keele Street to Weston Road Routing – Preliminary Planning

Part 3

  • Vehicle Facility – Preliminary Planning

* Metrolinx is beginning the Mount Dennis Mobility Hub Study for the area around the station.

slide-4
SLIDE 4

Western Alignment & Future Vehicle Maintenance and Storage Facility Update

3

The Purpose of this Online Consultation

  • Provide a brief project update
  • Present proposed changes & improvements to the alignment from Keele

Street to Weston Road

  • Provide an overview of the Maintenance and Storage Facility layout &

challenges

Most importantly:

  • Get your input on the Preliminary Planning early in this process.

A second community consultation will be held in Fall, 2012

slide-5
SLIDE 5

Western Alignment & Future Vehicle Maintenance and Storage Facility Update

4

Presentation Part 1: Crosstown Background, Key Developments & Construction Update

slide-6
SLIDE 6

Western Alignment & Future Vehicle Maintenance and Storage Facility Update

5

What was determined in 2010

Keele to Jane Section

A street-level LRT alignment on the following panel was approved through a study (Transit Project Assessment) in 2010.

slide-7
SLIDE 7

Western Alignment & Future Vehicle Maintenance and Storage Facility Update

6

2010 Alignment (Street Level)

slide-8
SLIDE 8

Western Alignment & Future Vehicle Maintenance and Storage Facility Update

7

What we heard in 2009 – 2010

Community Concerns were raised during the previous study. The new study will address these:

  • Traffjc concerns at Black Creek Drive
  • Pedestrian Crossings at Weston Road
  • Property impacts in the vicinity of Weston Road
  • Plan for Crosstown connection to GO Transit
slide-9
SLIDE 9

Western Alignment & Future Vehicle Maintenance and Storage Facility Update

8

Key Project Developments since 2010

  • An off-street (elevated) route is now proposed from a portal west
  • f Keele Street to Black Creek
  • Underground LRT is now proposed from Black Creek to Weston

Road

  • An underground “Weston Rd/Mt Dennis Station” is now

proposed, just east of Weston Road

  • Protecting for future GO Transit connection
  • Preliminary plans are developing to retain Kodak Building
slide-10
SLIDE 10

Western Alignment & Future Vehicle Maintenance and Storage Facility Update

9

Proposed New Route Alignment – 2012

  • This project includes construction to Weston Rd/Mt Dennis

Station to be complete in 2020

  • The timing and construction method for Weston Road to Jane

Street is TBD through further study

slide-11
SLIDE 11

Western Alignment & Future Vehicle Maintenance and Storage Facility Update

10

Potential Benefjts of the New LRT Route Proposal

  • Improve access to the proposed Vehicle Maintenance and Storage Facility (MSF)
  • Build a new underground LRT station near Weston Road
  • Improve pedestrian connections at the newly proposed Station
  • Provide a new bus terminal for connection to proposed Weston Road/Mount

Dennis Station

  • Preserve the former Kodak Employees Building for future re-development
  • Protect for a future GO Transit to Crosstown LRT connection

A new study will now assess the pros and cons of the design changes and identify measures to mitigate any impacts such as those related to “Weston Rd/Mt Dennis” Station.

slide-12
SLIDE 12

Western Alignment & Future Vehicle Maintenance and Storage Facility Update

11

The Eglinton Crosstown Plan 2012

  • 19 km Rapid Transit Line (Jane/Black Creek Drive to Kennedy

Station)

  • 10 km Underground Tunnel (Keele Area to Laird Drive*)
  • SRT Replacement, Enhancement & Extension from Kennedy

Station to Sheppard Avenue East

  • 60% faster than bus service today

* Exact alignment west of Keele Street TBD through this study

slide-13
SLIDE 13

Western Alignment & Future Vehicle Maintenance and Storage Facility Update

12

The Crosstown – 2012

*Final number and location of stations subject to Provincial review

  • 60% faster than

current bus routes

  • 15 minutes from Keele

to Yonge

slide-14
SLIDE 14

Western Alignment & Future Vehicle Maintenance and Storage Facility Update

13

Implementation

  • The Keele to Weston Rd/Mt Dennis

Station segment is part of the Province of Ontario’s $8.4 Billion investment for Transit expansion in Toronto

  • Crosstown Phase 1 (2011 – 2020)

– Tunnel contract for Keele to Yonge and Keelesdale Park Bridge are currently being tendered for bids – 6 LRT Stations are currently under design (Keele to Chaplin)

Future Community Centre Future Bridge

slide-15
SLIDE 15

Western Alignment & Future Vehicle Maintenance and Storage Facility Update

14

Crosstown Construction Update

  • Tunnel preparation work at Black

Creek and Eglinton in Keelesdale Park

  • Piling rigs are building concrete

support walls for the future west tunnel launch shaft

  • The west launch shaft will enable

tunnelling works in late 2012 towards Allen Road

slide-16
SLIDE 16

Western Alignment & Future Vehicle Maintenance and Storage Facility Update

15

Presentation Part 2: Route Alignment Update Keele Street to Jane Street

slide-17
SLIDE 17

Western Alignment & Future Vehicle Maintenance and Storage Facility Update

16

Guiding Principles

The plans being presented today are conceptual, and will be refjned over the coming months to:

  • Minimize impacts to the natural environment
  • Reduce property impacts if possible
  • Minimize costs
  • Minimize impacts to buildings
  • Enhance access to vehicle facility
slide-18
SLIDE 18

Western Alignment & Future Vehicle Maintenance and Storage Facility Update

17

Study Areas

* For future study *

slide-19
SLIDE 19

Western Alignment & Future Vehicle Maintenance and Storage Facility Update

18

2012 – New Proposed Plan/Profjle

slide-20
SLIDE 20

Western Alignment & Future Vehicle Maintenance and Storage Facility Update

19

Weston Rd / Mt Dennis Station

slide-21
SLIDE 21

Western Alignment & Future Vehicle Maintenance and Storage Facility Update

20

Presentation Part 3: Vehicle Maintenance & Storage Facility Preliminary Planning

slide-22
SLIDE 22

Western Alignment & Future Vehicle Maintenance and Storage Facility Update

21

Maintenance and Storage Facility Requirements

  • 17 hectares (42 acres) of fmat property
  • Vacant property preferred or property which causes minimal

displacement of existing commercial/industrial activities

  • Ideally zoned for industrial/employment or transportation use
  • Proximity to the Eglinton line – ideally less than 1 kilometre
  • Ideally close to future intersecting LRT lines.
slide-23
SLIDE 23

Western Alignment & Future Vehicle Maintenance and Storage Facility Update

22

Maintenance and Storage Facility

slide-24
SLIDE 24

Western Alignment & Future Vehicle Maintenance and Storage Facility Update

23

Maintenance and Storage Facility Concept

slide-25
SLIDE 25

Western Alignment & Future Vehicle Maintenance and Storage Facility Update

24

Bus Terminal

The Weston Rd/Mt Dennis LRT Station will be connected to a new 15-bay bus terminal.

slide-26
SLIDE 26

Western Alignment & Future Vehicle Maintenance and Storage Facility Update

25

Bus Routes Serving the Bus Terminal

It is proposed that the following TTC bus routes will serve the new bus terminal:

  • 19 Jane South (new)
  • 32 Eglinton West
  • 35 Jane
  • 35E Jane Express
  • 71 Runnymede
  • 89 Weston (local northbound)
  • 89 Weston (local southbound)
  • 161 Rogers Rd
  • 168 Symington
  • 170 Emmett (new)
  • 171 Mount Dennis
  • TTC Wheel-Trans
slide-27
SLIDE 27

Western Alignment & Future Vehicle Maintenance and Storage Facility Update

26

Bus Terminal:

MSF Site with Kodak Building

Eglinton Ave W Existing Building Black Creek Dr Photography Dr

slide-28
SLIDE 28

Western Alignment & Future Vehicle Maintenance and Storage Facility Update

27

Study Processes Transit Project Assessment (TPAP)

  • The alignment study focuses on the proposed changes to the

approved Eglinton-Crosstown LRT plan, and will assess the impacts of the changes using the same assessment factors as the previous study.

  • The public will be provided opportunities to review and comment
  • n the assessment of the impacts of the proposed design

changes, and measures to mitigate those impacts.

  • The impact assessment and results of the study will be

documented in a report for the Eglinton Crosstown LRT Project.

  • The Vehicle Facility will also undergo study under the TPAP
slide-29
SLIDE 29

Western Alignment & Future Vehicle Maintenance and Storage Facility Update

28

Environmental Impact Assessment and Mitigation of the Project

  • As part of the Transit Project Assessment Process (TPAP), the project team will:
  • Document the assessment and evaluation of the impacts of the project on the environment;
  • Explore and incorporate measures to mitigate negative impacts of the project; and,
  • Develop means to monitor or verify the effectiveness of mitigation measures.
  • The project team includes natural, socio-economic and cultural environment specialists such as:
  • air quality
  • geotechnical
  • safety
  • archaeological
  • health effects
  • natural environment
  • economic
  • heritage
  • traffjc
  • fjsheries
  • noise
  • The results of the impact assessment will be documented and reviewed by various government agencies

and members of the public. The following display provides a summary of the issues that will be explored.

slide-30
SLIDE 30

Western Alignment & Future Vehicle Maintenance and Storage Facility Update

29

Environmental Factor Areas

  • Natural Environment
  • Cultural Environment
  • Fisheries and aquatic habitat
  • Cultural heritage features
  • Terrestrial habitat and species
  • Archaeological resources
  • Specially designated features and species
  • Constitutionally protected aboriginal or
  • Groundwater

treaty right

  • Contamination properties
  • Socio-Economic Environment
  • Direct impacts on residents and businesses including things such as:
  • Displacement of residences
  • Displacement of businesses
  • Displacement of community features
  • Indirect impacts on residents and businesses including things such as:
  • Changes to noise levels – comparing future ‘do nothing’ to future with the project
  • Changes in local and regional air quality and the implications on human health
  • Changes to aesthetic environment
  • Changes to access, travel patterns and traffjc
slide-31
SLIDE 31

Western Alignment & Future Vehicle Maintenance and Storage Facility Update

30

Alignment & Facility - Consultation Process

Timelines

Online Consultation — June 26 – July 10, 2012 Consultation #2 — Fall, 2012

  • Update on Alignment. Respond to consultation #1 Input
  • Update to layout of Vehicle Maintenance & Storage

Facility

slide-32
SLIDE 32

Western Alignment & Future Vehicle Maintenance and Storage Facility Update

31

The Crosstown Team

Please get in touch with us

Devin Horne, Franca Di Giovanni, Denise Jayawardene E-mail: eglintontransit@ttc.ca Online: www.thecrosstown.ca Tel: 416-338-6310 Fax: 416-397-8193 TTY: 416-481-2523 Visit our West Community Office at 1848 Eglinton Avenue West (at Dufferin) Community Office Hours — 2012 Monday, Wednesday, Friday: 9:00 a.m. – 5:00 p.m. Tuesday & Thursday: by appointment

slide-33
SLIDE 33

Western Alignment & Future Vehicle Maintenance and Storage Facility Update

32

Next Steps

  • Please submit comments to the project team by July 10th, 2012
  • Refine the preferred project option
  • Assess the project impacts
  • Develop mitigation methods
  • Second Public Consultation in Fall, 2012
  • Prepare a draft study summary report for public and agency review