Welcome Kolos Begins CSR Turnover 2019 No of Employees One of - - PowerPoint PPT Presentation
Welcome Kolos Begins CSR Turnover 2019 No of Employees One of - - PowerPoint PPT Presentation
Welcome Kolos Begins CSR Turnover 2019 No of Employees One of the main cement operator in Mauritius. 1,125 Started operations in M 68 2000 Batir Agir Ranked 77 in Top 100 in 2018 Foundation Subsidiary of Gamma Civic Our Clients
Kolos Begins
One of the main cement
- perator in Mauritius.
Started operations in
2000
No of Employees
68
Turnover 2019
1,125 M
CSR
Batir Agir Foundation
Ranked 77 in Top 100 in 2018
Our Clients Our Products Operations Certifications
60 KT
Largest Terminal Indian Ocean MS EN 197-1 BS EN 413-1 MS 36-3 Local Compliance
ISO 9001 ISO 14001
Subsidiary of Gamma Civic
- Ready Mix
- Operators
- Construction
Companies
- Hardware Stores
Our Values
Our Site
Kolos
CEM II 32.5 Portland Composite Cement
Kolos Plus
CEM II 42.5 Portland Composite Cement
Our Bags Product Kolos Eco Plus
CEM II/B-M (LL-Z) 32.5 N- TU Portland Composite Cement
Kolos Finish
MC 22.5X Masonry Cement
Bulk Products
- CEM II 42.5 => Portland Composite Cement
- CEM I 42.5 N => Ordinary Portland Cement
- CEM I 52.5 N => Ordinary Portland Cement
Specialised Bulk Products
- CEM III A 42.5 N => Portland Slag Cement
Used for Port Extension
- CEM III B 32.5 N => Sulphate Resistance
Cement with Low Heat of Hydration
Used for Bagatelle Dam
- CEM III A 52.5 N => Portland Slag Cement
Used for A1 – M1 Motorway
Our Bulks Product
Major Achievements 2018 - 2019
Major Achievements 2013 - 2017
» The 56,900m2 airport terminal is the
largest infrastructure project ever in Mauritius
» Cement tons required for this project:
28,000
» Timing: 2013 » CEM I 42.5 N supplied » Was continuously supplied during
casting by organising 18 hour continuous deliveries
International Airport in Mauritius
» Will enable 24-hour water supply to Port
Louis and Plaines Wilhems
» Cement tons required for this project: 28,000 » Timing: 2012-2017 » Kolos supplied CEM III B 32.5 with slag
which was prepared over a six month period to produce the specifications required by the designers
Bagatelle Dam
» Will cater for increase shipping activity in
Port Louis
» Cement tons required for this project: 20,000 » Timing: 2015-2017 » Kolos supplied CEM III A 42.5 with slag
according to specifications required by the designers
MPA Port Extension
Unloading Cement - KOVAKO
- Capacity : 7,500 mt/day – Operated and
maintained by local team.
Our Operation
Production
Flat Storage Shed 1: 40.000 t Portland Cement Flat Storage Shed 2: 20.000 t Slag Continuous blender 150 t/h Packer 1 Export Capacity of 2,700 Bags/h Silo Storage Bulk 3B3 : 80 t 3B4 : 250 t 3B5 : 250 t Packer 2 25t/h (sac de 25kg) – 50 Palettes Palettiseur 70 palettes/h Housseuse 80 palettes / h
Storage
- Capacity : 1,000 tons (500 Palettes)
- Daily shipping rate : 500 - 600 tons
Storage and Distribution
Kolos Building Materials
- 3 points of distribution around the island
- Delivery in less than 1hr