WELCOME THE UNIVERSITY OFUTAH Planning, Design & Construction Forum May 9th,2019 INTRODUCTION Presenter: Robin Burr Chief Facilities Officer MEET EETING NG GOAL OALS o Our Organization Where weve been o Where we are today o


slide-1
SLIDE 1

THE UNIVERSITY OFUTAH Planning, Design & Construction Forum May 9th,2019

WELCOME

slide-2
SLIDE 2

Presenter: Robin Burr – Chief Facilities Officer

INTRODUCTION

slide-3
SLIDE 3
  • Our Organization
  • Where we’ve been
  • Where we are today
  • Where we‘re going
  • General Updates
  • Practice Changes
  • Current and Upcoming Projects
  • Q&A

MEET EETING NG GOAL OALS

slide-4
SLIDE 4
  • Changing Expectations
  • Success with smaller, better integrated Project

Teams

  • Added Design & Construction Support Team

WHER ERE W E WE’ E’VE VE BEEN… EEN…

slide-5
SLIDE 5
  • Continuous Improvement Mode
  • Strong focus on Campus Planning
  • More support for Project Delivery
  • New Tools and Training
  • Changes in Plan Check & Inspection
  • Changes in Proposal Format
  • Joining with Facilities Management and University

Hospitals & Clinics

WHER ERE W E WE E AR ARE E TOD ODAY AY…

slide-6
SLIDE 6
  • Continued adaptation of Tools and

Training

  • Strong focus on Sustainability
  • Heavy up-front involvement at beginning
  • f projects
  • Evolving Project Delivery methodology
  • LEAN Practices
  • Target Value Design
  • Better integration of AE, GC and

the U in project delivery

WHER ERE W E WE’ E’RE E GOI OING NG…

slide-7
SLIDE 7 Robin Burr Chief Facilities Officer Ken Nye Deputy Chief Facilities Officer
  • TEAM. LEADERSHIP

Updated April 30, 2019

Contracts Heather Henderson Contracts Administrator Polly Alles Contracts Administrator Unifier Jeff Record
  • Sr. Bus
Analyst John Naylor
  • Sr. Bus data
Analyst Records Management (Vacant) IT Manager Finance / Business Support Infrastructure, Energy, Red Butte Gardens Rick Johansen PM Shireen Ghorbani
  • Assoc. Director,
PR, Training, Communications Communications Organizational Development Wes Mangum Comm. Specialist Mary Ellen Allen
  • Prog. Mgr.
Andrew King Associate Director Campus Planning Tami Wolfgang Planner John Close Planner Charles Shepherd Planner Campus Planning Blaine Osborne Administrative Manager Administrative Support Administrative Support Shannon Failner Admin Ass’t Michelle Keddington Admin Ass’t Randi Porter Reception Gary Giglio Director Design & Construction Support Building Official Karen Janicki Financial Analyst Jeff Kuehndahl Financial Analyst Nana Amoah Ewusi- Emmim
  • Fin. Analyst
Brenda Diaz Financial Analyst Bob Simonton Director Design & Construction Christian Johansen APM 2 Astrid Paredes PM Jon Jefferson PM Brett Petersen PM Scott Jefferson PM Liz Blackner Director Design & Construction Mark Grabl PM Andrea Cavrag PM Christin Robbins PM Andrew Heiner PM Desslie Andreason PM Main Campus Research Park Community Clinics Lori Kaczka PM Carley Bradbury Project Ass’t Rochelle Randazzo Director Project Finance/ Accounting Shivali Khopkar Accountant Project Fin/Acct’g Support Mary Dupaix Accountant Steve Laraway PM Harry Corsi PM Nils Eddy Program Manager Health Sciences Campus Nirman Rajbhandari PM Mike Wessman PM Krin Kirijas PM Health Sciences Campus Barbara Famageltto APM 1 Sherri Somers APM 1 Design & Construction Support Michael Beck QC / Safety Mgr. Colin Moore Construction Estimator Sam Jensen Augustine Energy/ Sustainability Manager Eric Newby Construction Manager Chris Blair Building Inspector Sue Pope Open Space Manager Training Stacia Worndle Training Manager Stacy Hendricksen Skills Trainer Facilities Service Center Stacy Heiner Customer Srvc. Specialist Jodi Smith Customer Srvc. Specialist Katherine Somers Student Intern (vacant) Student Intern FM/PDC Shared Services Facilities Management Steve Hoskins Orfeo Kostrencich Dave Quinlivan UUHC Facilities & Engineering Jerry North Facilities Management Rich Miller Finance & Data Analytics

OUR R ORGAN ANIZAT ATIO ION

slide-8
SLIDE 8

Presenter: Ken Nye - Deputy Chief Facilities Officer

GENERAL UPDATES

slide-9
SLIDE 9

Staff

  • Heather Henderson
  • Polly Alles
  • CM/GC – we are transitioning to a pre-set fee
  • Multi-Project Selections for A/E and Contractor
  • Performance Reviews

PROC OCUREM EMENT ENT

slide-10
SLIDE 10
  • Gifts
  • Option to donate to U of U Student Food

Bank or other charity of your choice

CONF ONFLICT OF OF INT NTER ERES EST

slide-11
SLIDE 11
  • Electronic signatures coming
  • PlanGrid is a companion system to Unifier

Staff

  • John Naylor
  • Jeff Record

UNI NIFIER ER

slide-12
SLIDE 12
  • New policy coming this summer
  • Objective is to minimize impact of

construction on parking availability

CO CONTR TRACT CTOR PAR ARKING NG ON ON CAM AMPUS

slide-13
SLIDE 13
  • Permit required for parking anywhere on

campus

  • Sidewalk passes will carry a fee
  • Designated parking areas for sidewalk passes
  • Limited to specific areas, according to

Commuter Services parking plan

  • Use of parking areas for staging require

written approval in advance

  • Contractor contact info on staging area fence

CO CONTR TRACT CTOR PAR ARKING NG REQU EQUIREM EMEN ENTS

slide-14
SLIDE 14

Presenters: Gary Giglio - Director of Design & Construction

Support/Building Official

Sam Jensen Augustine– Energy/Sustainability Manager Colin Moore – Preconstruction Manager

CHANGES IN PRACTICE & EXPECTATIONS

slide-15
SLIDE 15

Presenter: Gary Giglio- Director of Design & Construction Support/Building Official

PROCESS IMPROVEMENT

slide-16
SLIDE 16
  • LEAN Concepts for Design & Construction

CHANG ANGES ES IN N PRAC ACTICE E & & EX EXPEC ECTATIONS ONS

slide-17
SLIDE 17
  • OUR MISSION: Delivering projects on time,
  • n budget with the expected quality and

safety

  • Creating value for clients by eliminating

activities that are considered waste, focusing on process and flow, and continuous improvement

LEAN EAN CONC ONCEP EPTS FOR OR DESI ESIGN N & & CONST ONSTRUCTION

slide-18
SLIDE 18
  • 1. Deployment/Use of interoperable

technology, such as BIM, cost-estimating and scheduling tools

LEAN EAN CONC ONCEP EPTS FOR OR DESI ESIGN N & & CONST ONSTRUCTION

slide-19
SLIDE 19
  • 2. Use of prefabrication, preassembly,

modularization, and off-site fabrication techniques and processes

LEAN EAN CONC ONCEP EPTS FOR OR DESI ESIGN N & & CONST ONSTRUCTION

slide-20
SLIDE 20
  • 3. Effective performance measurement to

drive efficiency and support innovation

LEAN EAN CONC ONCEP EPTS FOR OR DESI ESIGN N & & CONST ONSTRUCTION

slide-21
SLIDE 21

Presenter: Alex Demogines- Regional Manager, PlanGrid

PLANGRID

slide-22
SLIDE 22

Welcome to PlanGrid

Changing Project Delivery for the Unive iversit ity o

  • f Utah
slide-23
SLIDE 23

Centr tral alize a all p project t lifec ecycle do e docum umen entation

slide-24
SLIDE 24

၊ Errors & omissions ၊ Change orders ၊ Inaccurate as-built drawings ၊ Incomplete reporting ၊ Missing asset management data

Solutions f for o

  • wne

wners f from design gn t to t turnover

slide-25
SLIDE 25

Raymond Group T-Mobile Arena

“PlanGrid allows me to collect and turn over ‘live working’ as-builts that are invaluable to

  • wners for the life of the building.”

Construction Turnover Operations

—Terry Coleman Superintendent, Kraus-Anderson

Sec ecur ure a a compl plet ete turno nover p package

slide-26
SLIDE 26

Granite Construction Highway 99 Realignment

✓ Proven project team adoption ✓ Retain portable data for turnover ✓ Simplify team collaboration ✓ Deliver more predictable outcomes ✓ Control data for the lifecycle of the facility

3,672 ratings 2,014 ratings

Used by 52%

  • f ENR top 400

GCs

Why PlanGrid?

slide-27
SLIDE 27

PLANGRID Q&A

slide-28
SLIDE 28

Presenter: Sam Jensen Augustine – Energy/Sustainability Manager

SUSTAINABILITY IN DESIGN & CONSTRUCTION

slide-29
SLIDE 29
  • Started July 1, 2018
  • Visiting firms to have conversation about

U’s evolving approach

  • Owner’s Project Requirements updated
  • Working with project team to tailor HBPS as

appropriate

  • Aligning upfront project decisions with

LCCA

SU SUST STAI AINA NABILITY

slide-30
SLIDE 30

Presenter: Gary Giglio- Director of Design & Construction Support/Building Official

CODE REVIEW & INSPECTION SERVICES

slide-31
SLIDE 31
  • Moe Heivand, Regional Operations Manager Facilities-Code Compliance West-Southwest
  • Chris Blair, Building Inspector
  • Randy Moss, Plans Examiner and Inspector
  • Craig Baptista, Director of Operations, Facilities-Code Compliance
  • Building permit card

BUREAU EAU VER VERITAS NOR NORTH AM AMER ERICA

slide-32
SLIDE 32

Presenter: Colin Moore- Preconstruction Manager

ESTIMATING MANUAL, TEMPLATE & COST DATABASE

slide-33
SLIDE 33

WHAT IS VALUE?

1

WAYS TO INCREASE COST CERTAINTY

2

UPDATED WBS CODES / ESTIMATING METHODOLOGY MANUAL

3

COST DATABASE FOR BENCHMARKING

4

TARGET VALUE DELIVERY

5

PRECONSTR TRUC UCTI TION

slide-34
SLIDE 34
  • Value is “what the customer is actually paying for the project to produce and install.”

– Lean Construction Institute

  • Value = Function

Cost

  • Planning, Design, & Construction:
  • State entity with a charge to gain best value for Utah tax payers
  • Understands – and assists to communicate and deliver on - the client’s definition of value (program, schedule, cost,

social)

  • Architects & Engineers:
  • Understands - and designs to - client’s definition of value while collaborating closely with the client’s team
  • Contractors:
  • Understands client’s definition of value and brings value by providing expert opinion, real-time design and

constructability feedback, and cost certainty while collaborating closely with the client’s team

WHAT AT IS S VAL VALUE? E?

slide-35
SLIDE 35
  • Cost certainty is high on every client’s value list. Cost overruns cause redesign, schedule delays, and decrease delivered value
  • Ways to increase cost certainty:
  • Establish consistent cost reporting tools, including Work Breakdown Structure (WBS) codes. Establish consistent times to

report costs

  • Maximize collaboration during preconstruction and construction – all team members are “linked” to the project budget
  • Project “benchmarking” against similar projects to validate costs
  • Continuous review & feedback of design documents for cost, constructability, & conflicts
  • Immediate reporting of potential cost overruns, including market factors such as tariffs or commodity pricing increases
  • Establish Target Values, with subgroups that report on how specific target values are tracking with design

WAYS AYS TO O INC NCREASE EASE COST OST CER ERTAI AINTY

slide-36
SLIDE 36

WORK BREAKDOWN STRUCTURE (WBS) ESTIMATING METHODOLOGY MANUAL

  • Establishes a uniform cost reporting

system between University projects

  • Reduces miscommunication and is more

transparent

  • Template based on Construction

Specification Institute (CSI 2014)

  • Will be used in University’s cost

database

  • Explains how to measure each of the

line items in the WBS

  • Defines scope of unit rates for database

accuracy

  • Guides delineation of TI versus Shell &

Core for renovation projects

UPDATED ED WBS S COD ODES/ ES/ES ESTIMATING NG MET ETHOD ODOLOGY Y MANU ANUAL AL

slide-37
SLIDE 37

Example of the WBS - Summary

WOR ORK BREAK EAKDOWN N ST STRUCTURE

slide-38
SLIDE 38

Detail Example Div. Code Component Description Quantity Unit Cost $ Total $ 9 09 00 00 FINISHES 9 09 20 00 Plaster And Gypsum Board 9 09 21 00 Plaster And Gypsum Board Assemblies 9 09 22 00 Supports For Plaster And Gypsum Board 9 09 22 00 Exterior Wall and Parapet Assemblies 9 09 22 00 Steel stud, 18 ga - 6" SF 9 09 22 00 Steel stud, 18 ga - 6" at parapet walls SF 9 09 22 00 Exterior soffit framing SF 9 09 22 13 Metal Furring 9 09 22 13 Interior Wall 9 09 22 13 Steel stud furring, 16 ga - 1 5/8" SF 9 09 22 13 Steel stud furring, 20 ga - 2 1/2" SF 9 09 22 16 Non-Structural Metal Framing 9 09 22 16 Interior Wall 9 09 22 16 Steel stud framing, 20 ga - 3 5/8" SF 9 09 22 16 Steel stud framing, 20 ga - 6" SF 9 09 22 16 Steel shaft wall framing, 20 ga - 2 1/2" CH SF 9 09 22 16 Steel shaft wall framing, 20 ga - 4" CH studs SF 9 09 22 16 Blocking and backing LF 9 09 22 26 Suspension Systems 9 09 22 26 Ceilings 9 09 22 26 Gypboard ceiling framing SF 9 09 22 26 Gypboard soffit framing, including kickers SF 9 09 24 00 Portland Cement Plastering 9 09 24 23 Portland Cement Stucco 9 09 24 23 Exterior stucco, integrally colored, including lath SF 9 09 24 23 Plaster control joints, including continuous bent plate LF 9 09 28 00 Backing Boards And Underlayments 9 09 28 13 Cementitious Backing Boards

Example of the WBS - Detail

WOR ORK BREAK EAKDOWN N ST STRUCTURE

slide-39
SLIDE 39

ESTIMATING METHODOLOGY MANUAL 6

SAMPLE OF THE EMM6

Curtainwall Systems (SF):

08 44 00

Exterior glazing systems are measured based on total area, and include both the glass and the frame. Fritted / spandrel glass is broken out as a separate line item from vision glazing. Curved glass is broken out as a distinct line item (with a premium unit cost) as are other specialty glazing systems. As a standard convention, exterior curtain wall systems do not deduct glass entrances. Metal Decking

05 30 00

Material: Corrugated metal deck, Nelson/shear studs. Labor: Fabrication / installation of deck system, welding of Nelson/shear studs. Equipment: Hoisting equipment, welding equipment. Factors Affecting Cost: Metal Deck (SF):

05 31 13

Unit cost includes the furnishing and installation of Nelson or shear studs. Penetrations larger than 50 square feet are deducted from the overall quantity, however smaller penetrations are not deducted. Unit cost includes penetration cutouts. Vented deck follow the same standards.

EST ESTIMATING NG MET ETHOD ODOLOGY MANU ANUAL AL 6

slide-40
SLIDE 40

COST OST DAT ATAB ABAS ASE E FOR OR BENC ENCHMAR ARKING NG

slide-41
SLIDE 41

TAR ARGET ET VAL VALUE E DEL ELIVER VERY Y (TVD VD)

  • Value & cost drive the design process

instead of calculating the cost after design is complete.

  • Increases cost predictability vs. the

traditional method of estimating at established design intervals only.

  • Teams work together to deliver value
slide-42
SLIDE 42

Presenters: Rochelle Randazzo -Director of Finance & Accounting Andrew King- Associate Director of Campus Planning Bob Simonton - Director of Design & Construction Liz Blackner - Director of Design & Construction Nils Eddy - Program Manager, Health Sciences Trent Cutler – Director of Planning, Design & Construction, Health Sciences

MEET THE TEAMS/PROJECTS

slide-43
SLIDE 43

Presenter: Rochelle Rondazzo- Director of Finance & Accounting

FINANCE & PROJECT METRICS

slide-44
SLIDE 44

9 10 11 9 10 9 8 227 311 267 289 268 241 247 236 321 278 298 278 250 255

  • 50

100 150 200 250 300 350 2018 2019 2020 2021 2022 2023 2024

Number of Project Fiscal Year Number of Projects

The University of Utah Planning, Design & Construction Annual Number of Projects

Projects under $10M $53 $75 $116 $92 $91 $75 $71 $167 $206 $182 $151 $183 $148 $174 $220 $281 $298 $243 $274 $223 $245 $- $50 $100 $150 $200 $250 $300 $350 2018 2019 2020 2021 2022 2023 2024

In Millions Fiscal Year Spending

The University of Utah Planning, Design & Construction Project Spending

Projects under $10M

slide-45
SLIDE 45

Presenter: Andrew King- Associate Director, Campus Planning

CAMPUS PLANNING

slide-46
SLIDE 46

Planners Campus Planning Responsibilities

  • Project Studies and

Research

  • Visioning and Master

Planning

  • Campus Transportation
  • Campus Parking
  • Campus Site and

Landscape

  • Cultural Resources /

Historic Preservation

  • Campus Signs and

Signage

  • Charles Shepherd:

Cultural Resource Manager

  • Sue Pope:

Open Space Manager

  • Tami Wolfgang:

Campus Planner

  • John Close:

Campus Planner Andrew King, Associate Director, Campus Planning

CAM AMPUS S PLANNI ANNING NG

slide-47
SLIDE 47

Presenter: Bob Simonton - Director of Design & Construction

INFRASTRUCTURE TEAM

slide-48
SLIDE 48
  • Scott Jefferson
  • Steve Laraway
  • Brett Petersen
  • Jon Jefferson
  • Astrid Paredes

Financial Analyst

  • Brenda Diaz
  • Carley Bradbury

Project Managers

INFRASTR TRUC UCTUR TURE, ENER ENERGY & Y & RED ED B BUTTE E GAR ARDEN EN

Project Assistant

  • Energy Efficiency
  • Transportation
  • Utilities
  • Red Butte Garden
  • Seismic
  • Building Systems

Renewal

Types of Projects

slide-49
SLIDE 49

Presenter: Liz Blackner - Director of Design & Construction

MAIN CAMPUS, RESEARCH PARK & COMMUNITY CLINIC TEAM

slide-50
SLIDE 50

Project Managers

  • Desslie Andreason
  • (Retiring May 17)
  • Andrea Cavrag
  • Mark Grabl
  • Andrew Heiner
  • Rick Johansen
  • Lori Kaczka
  • Christin Robbins

Financial Analyst

  • Christian Johansen
  • Sherri Somers

Types of Projects

  • Academic
  • Research
  • Athletics
  • Community Spaces
  • Food Service
  • Administration
  • Clinics
  • Housing
  • Performance Arts
  • Tenant Improvements
  • Remodels
  • Additions
  • Karen Janicki
  • Nana Amoah

Ewusi-Emmim

Associate Project Managers

MAI AIN N CAM AMPUS & & RESEAR ESEARCH PAR ARK

slide-51
SLIDE 51

Presenter: Nils Eddy - Program Manager,

Health Science

HEALTH SCIENCES & TRANSFORMATION TEAM

slide-52
SLIDE 52
  • Krin Kirijas
  • Harry Corsi
  • Mike Wessman
  • Nirman Rajbhandari
  • Sherri Somers
  • Barbara Famageltto

Project Managers Construction Project Manager

  • Eric Newby

HEAL EALTH SC SCIENC ENCES ES & & TRANSF ANSFOR ORMATION

Associate Project Managers Financial Analysts

  • Nana Amoah Ewusi-Emmim
  • Jeff Kuehndahl
slide-53
SLIDE 53

Presenter: Trent Cutler- Director of Planning, Design & Construction,

Health Sciences

HOSPITALS & CLINICS TEAM

slide-54
SLIDE 54

DavidDaining RebeccaWielder BlakeMcBride KristiannaPulsipher CJKulp Chris tianAllen JenniferBrownlee BenBlacker

DESI ESIGN N PROJ OJEC ECT MANAG ANAGER ERS

slide-55
SLIDE 55

Rod Randall Joe Cronin Destry Norman Scott Cummins Mark Hunziker Jay Sarten Kathy Sirrine Jamie Hackworth

CONST ONSTRUCTION N PROJ OJEC ECT MANAG ANAGER ERS

slide-56
SLIDE 56

Malory Devries Jenna Matheson Elaine Stowell

AEST AESTHET ETICS TEAM EAM

slide-57
SLIDE 57

HOSP OSPITALS & & CLINI NICS

Types of Projects Geographically Spread

  • Clinical
  • Inpatient
  • Outpatient
  • Support Spaces
  • Research
  • Tenant Improvements
  • General Renovations
  • Infrastructure
  • Main Medical Campus
  • Research Park
  • Community Clinics
  • Salt Lake County
  • Davis County
  • Utah County
slide-58
SLIDE 58

Q&A