Vacuum Lumber Drying Presented by, Jim Parker Bring your Cash Flow - - PowerPoint PPT Presentation

vacuum lumber drying
SMART_READER_LITE
LIVE PREVIEW

Vacuum Lumber Drying Presented by, Jim Parker Bring your Cash Flow - - PowerPoint PPT Presentation

Vacuum Lumber Drying Presented by, Jim Parker Bring your Cash Flow out of the woods EFFICIENCY QUALITY SPEED This is what your calendar looks like now EFFICIENCY QUALITY SPEED APRIL 2014 SUN MON TUES


slide-1
SLIDE 1

SPEED QUALITY EFFICIENCY

Bring your Cash Flow out of the woods

Vacuum Lumber Drying

Presented by, Jim Parker

slide-2
SLIDE 2

SPEED QUALITY EFFICIENCY

This is what your calendar looks like now

slide-3
SLIDE 3

SPEED QUALITY EFFICIENCY

GET ORDER

SAW LOG DRY DRY DRY DRY DRY DRY DRY DRY DRY DRY DRY DRY DRY DRY DRY DRY DRY DRY DRY DRY

SHIP ORDER

APRIL 2014

SUN MON TUES WED THURS FRI SAT

slide-4
SLIDE 4

SPEED QUALITY EFFICIENCY

This is what the Vacutherm Calendar looks like

slide-5
SLIDE 5

SPEED QUALITY EFFICIENCY

Go fishing

GET ORDER

SAW LOG DRY DRY

SHIP ORDER

Go fishing Go fishing

GET ORDER

SAW LOG DRY DRY

SHIP ORDER

Go fishing Go fishing

GET ORDER

SAW LOG DRY DRY

SHIP ORDER

Go fishing Go fishing

GET ORDER

SAW LOG DRY DRY

SHIP ORDER

Go fishing

APRIL 2014

SUN MON TUES WED THURS FRI SAT

slide-6
SLIDE 6

SPEED QUALITY EFFICIENCY

slide-7
SLIDE 7

SPEED QUALITY EFFICIENCY

Drying Time Comparison

20 40 60 80

0 1 1.5 2 3 4 5 6 7 8 9 10 11 12 13

VacuPress from Green Conventional from Green

% Moisture Content Days

Drying 4/4 Hard Maple

slide-8
SLIDE 8

SPEED QUALITY EFFICIENCY

Drying Times

Drying time (hours) Species 4/4 5/4 6/4 8/4 10/4 12/4 Maple 30 35 42 48 96 140 Birch 40 48 55 70 120 192 Red Oak (40%) 24 36 48 96 168 240 Walnut (40%) 45 50 58 65 115 168 White Pine 24 30 38 48 55 96

slide-9
SLIDE 9

SPEED QUALITY EFFICIENCY

Production Comparison

Conventional Steam Kiln

VacuPress 4000 Capacity 50,000 bf 4,000 bf Drying Time (4/4 Hard Maple) 15 days 30 Hours Annual Throughput (350 days) 1,166,666 bf 1,120,000 bf

vs

slide-10
SLIDE 10

SPEED QUALITY EFFICIENCY

slide-11
SLIDE 11

SPEED QUALITY EFFICIENCY

Production Throughput

  • Eliminates the ‘bottleneck’
  • Increases responsiveness to market
  • Just-in-Time Inventory/production
  • Cash flow Machine
slide-12
SLIDE 12

SPEED QUALITY EFFICIENCY

slide-13
SLIDE 13

SPEED QUALITY EFFICIENCY

VACUPRESS 8000 INSTALLATION

slide-14
SLIDE 14

SPEED QUALITY EFFICIENCY

slide-15
SLIDE 15

SPEED QUALITY EFFICIENCY

slide-16
SLIDE 16

SPEED QUALITY EFFICIENCY

slide-17
SLIDE 17

SPEED QUALITY EFFICIENCY

CLICK ME

slide-18
SLIDE 18

SPEED QUALITY EFFICIENCY

Contact Heating

Aluminium hot water heating plate The hot water heating plates or heated air (for AirVac) heat the wood very efficiently and help drive the moisture out.

slide-19
SLIDE 19

SPEED QUALITY EFFICIENCY

The “Press” in VacuPress

Atmospheric Pressure (29.92 in Hg.) Low Pressure (4 in Hg.) Atmospheric Pressure (29.92in Hg) The rubber membrane holds the lumber flat and straight with 1200lbs/sqft

slide-20
SLIDE 20

SPEED QUALITY EFFICIENCY

RESULTS Red Oak #2 COM 43%-6% 24hrs

slide-21
SLIDE 21

SPEED QUALITY EFFICIENCY

slide-22
SLIDE 22

SPEED QUALITY EFFICIENCY

slide-23
SLIDE 23

SPEED QUALITY EFFICIENCY

slide-24
SLIDE 24

SPEED QUALITY EFFICIENCY

slide-25
SLIDE 25

SPEED QUALITY EFFICIENCY

The “Press” in VacuPress

  • Appox. 1200 lbs per foot of pressure
  • Does not affect dimension of wood
  • Prevents:
  • Cup
  • Bow
  • Twist
  • Crook
  • Can Eliminate cup, bow and twist already in lumber
slide-26
SLIDE 26

SPEED QUALITY EFFICIENCY

VacuPress Equipment Costs

Drying 4/4 Hard Maple

Model Cost per Bf of production

(paid for over 5 years + interest)

VacuPress 500 $0.09 VacuPress 1000 $0.05 VacuPress 2500 $0.04 VacuPress 4000 $0.03 VacuPress 8000 $0.02

slide-27
SLIDE 27

SPEED QUALITY EFFICIENCY

slide-28
SLIDE 28

SPEED QUALITY EFFICIENCY

slide-29
SLIDE 29

SPEED QUALITY EFFICIENCY

slide-30
SLIDE 30

SPEED QUALITY EFFICIENCY

  • Circulated Hot Air
  • Stickered Pack of Lumber
  • Track or Side Loaded
  • Cold Water EMC Control
slide-31
SLIDE 31

SPEED QUALITY EFFICIENCY

slide-32
SLIDE 32

SPEED QUALITY EFFICIENCY

slide-33
SLIDE 33

SPEED QUALITY EFFICIENCY

slide-34
SLIDE 34

SPEED QUALITY EFFICIENCY

slide-35
SLIDE 35

SPEED QUALITY EFFICIENCY

AirVac 40 (40,000 Board Feet)

slide-36
SLIDE 36

SPEED QUALITY EFFICIENCY

slide-37
SLIDE 37

SPEED QUALITY EFFICIENCY

AirVac Drying time (DAYS) Species 4/4 8/4 12/4 Maple 4 8 14 Birch 4 8 15 Red Oak 5 10 20 Walnut 5 10 20 White Pine 2 4 6

slide-38
SLIDE 38

SPEED QUALITY EFFICIENCY

Model Cost per Bf of production

(paid for over 5 years + interest) AirVac2.5 $0.20 AirVac4 $0.17 AirVac8 $0.15 AirVac20 $0.08 AirVac40 $0.07

AirVac Equipment Costs

Drying 8/4 Hard Maple

slide-39
SLIDE 39

SPEED QUALITY EFFICIENCY

Total Energy Cost

Wood Heat = $0.03/BF

Propane Heat = $0.08/BF

slide-40
SLIDE 40

SPEED QUALITY EFFICIENCY

Integrated Moisture Meter :: Remote Control :: Automatic or Manual Mode :: EMS

slide-41
SLIDE 41

SPEED QUALITY EFFICIENCY

QUESTIONS?? www.vacutherm.com