Using LIHTC for Mixed-Use Property: A Case Study Speaker: Peter T. Beck, Forsyth Street Advisors LLC Using LIHTC for Mixed-Use Property: A Case Study 1. An Overview of Haven Plaza 2. Financing Structure 3. Grappling with Mixed-Use Components


slide-1
SLIDE 1

Using LIHTC for Mixed-Use Property: A Case Study

Speaker: Peter T. Beck, Forsyth Street Advisors LLC

slide-2
SLIDE 2

Using LIHTC for Mixed-Use Property: A Case Study

  • 1. An Overview of Haven Plaza
  • 2. Financing Structure
  • 3. Grappling with Mixed-Use Components
  • 4. Addressing Unexpected Challenges
  • 5. Lessons Learned
slide-3
SLIDE 3

An Overview of Haven Plaza

  • 460,000 s.f., mixed-

use, mixed income complex:

– 371 units at various income levels – 9,000 s.f. retail & medical office – 185-car garage

  • 501c3-owned
  • Built in late 1960s
slide-4
SLIDE 4

An Overview of Haven Plaza

Before: April 2009

slide-5
SLIDE 5

An Overview of Haven Plaza

Before: April 2009

slide-6
SLIDE 6

An Overview of Haven Plaza

  • Rehabilitation was phased over three years
  • Phase One:

– Façade/masonry repair – Elevator modernization – Roof replacements

  • Phase Two

– Complete new kitchens & baths – Upgrades to interior common areas and mechanicals – Structural repairs to parking garage – Landscaping and plaza improvements – Asbestos abatement

slide-7
SLIDE 7

An Overview of Haven Plaza

  • A complex regulatory

structure created additional difficulty

  • 136 units under Section 8

HAP Contract

  • 191 units renovated with

HOME funds and restricted to lower income tenants

  • Approximately 60% of

tenants met LIHTC income limits

slide-8
SLIDE 8

An Overview of Haven Plaza

Development and Financing Team Developer: New York Institute for Human Development (Affiliate of the Archdiocese of New York) Contractor: MDG Design and Construction LLC Architect: Cutsogeorge Tooman & Allen Architects, PC Financial Advisor: Forsyth Street Advisors, LLC Management: Wavecrest Management Team Ltd. Counsel: Nixon Peabody / Comerford & Dougherty LLP Equity Syndicator: Richman Housing Resources Lender: Citibank

slide-9
SLIDE 9

Financing Structure

  • Phase One:

– $9.7mm subordinate loan from NYC Department

  • f Housing Preservation and Development (HPD)
  • Phase Two:

– $34.45mm in tax-exempt bonds issued by NYC Housing Development Corp. (HDC) – $12.6mm equity investment from Richman Housing Resources – $12.5mm seller note

slide-10
SLIDE 10

Financing Structure

Development Costs Acquisition Cost $ 12,500,000 Construction Cost 38,312,890 Soft Cost 11,848,247 Reserves/Working Capital 746,513 Developer's Fee 8,768,000 Total Development Costs $ 72,175,650 Permanent Sources HDC Tax-Exempt Bonds/First Mortgage 30,000,000 HPD HOME Loan/Second Mortgage 9,712,890 Seller Note 12,500,000 Equity Investment 12,600,000 Construction Period Cash Flow 4,044,760 Deferred Developer's Fee 3,318,000 Total Permanent Sources $ 72,175,650 Construction/Rehab Sources HDC Tax-Exempt Bonds/First Mortgage 34,450,000 HPD HOME Loan/Second Mortgage 9,712,890 Seller Note 12,500,000 Equity Investment 4,000,000 Deferred Developer's Fee 8,268,000 Construction Period Cash Flow 3,244,760 Total Construction/Rehab Sources $ 72,175,650

slide-11
SLIDE 11

Grappling with Mixed-Use Components

  • Parking garage

– Charges to tenants – Contributed significant revenue to project underwriting

  • Retail and medical
  • ffice space

– Small physical area – Also important revenue generators

slide-12
SLIDE 12

Grappling with Mixed-Use Components

  • Parking garage

integrated as part of residential structure

Residential Rooftop Plaza Two-Level Parking Garage Attached Residential Buildings

slide-13
SLIDE 13

Addressing Unexpected Challenges

  • Superstorm Sandy struck
  • ne day before completion
  • Over $2 million in damages,

incurring additional renovation expense and time

  • Substantial flooding in

ground floor areas, damaging electrical system, elevators, lobbies parking garage, commercial space

  • Residents without power for

days

slide-14
SLIDE 14

Lessons Learned

  • Underwriting assumptions should be

conservative on mixed-use deals

  • Use caution in underwriting commercial income

in LIHTC projects

  • Don’t take shortcuts in financial modeling
  • Coordinate with your accountant from day one
  • Leave a cushion in case things go wrong
slide-15
SLIDE 15

The Finished Product

Garage Roof Under Construction 2012 Completed Rooftop Plaza 2013

slide-16
SLIDE 16

The Finished Product

After Rehab - 2013

Courtyard Typical Lobby