Welcome to the public meeting for US Route 4 Traffic and Pedestrian Improvement Project March 13, 2019 Introduction Project Team Town of North Greenbush, Tony Germano, Town Comptroller Lou Desso, Town Supervisor Creighton
Introduction
- Project Team
- Town of North Greenbush,
- Tony Germano, Town Comptroller
- Lou Desso, Town Supervisor
- Creighton Manning Engineering
- Don Adams P.E., Josh Wilsey P.E., Matt Reluzco
- Laberge Group
- Rich Laberge P.E.
- Rensselaer County
- NYSDOT
Background
- Planning Studies
- 2007 – Route 4 and I-90
Connector Study
- 2016 – Town of North
Greenbush Route 4 Design Guidelines
- Funding
- Locally Administered Federal
Aid (LAFA) Project
- Total Funding - $9.83M;
Construction Funding – $8.26M
- 80% Federal/20% Local Match
US Route 4
Agenda
- Existing Conditions
- Project Objectives
- Proposed Improvements
- The ROW Process
- Project Schedule
- Public Input
Project Process
Project Initiation Data Collection Develop Feasible Improvements Public Review Assemble Draft Design Approval Documents Review Assess Agency/Public Comments Recommend Preferred Alternative Final Design Approval Document Design Approval Detailed Design/ ROW Acquisition Construction
Background Effort
- Ground Survey and Highway Boundary
- Environmental Screenings (ESA, SHPO, NYSDEC)
- Crash Data - Collected/Analyzed
- Traffic Data
- Recorded Existing
- Developed Future Volumes (Year 2039)
- Recorded Existing Vehicle Speeds
Project Limits
…to City of Troy Border From NY Route 43….
2.8 miles
Existing Conditions US 4: Bloomingrove Drive to Valley View Blvd
US Route 4
Partridge Hill Apartments Oak Hill Apartments Van Rensselaer Shopping Center
1 2 3 4
Existing Conditions Bloomingrove to Valley View
US 4 facing South, Existing parking for businesses Valley View Intersection facing North Bloomingrove Drive Intersection facing West US 4 and Bloomingrove facing Northeast
Existing Conditions US Route 4 and Winter Street Ext.
US Route 4
Alexis Diner
1 2 3
Existing Conditions Winter Street Ext.
Winter Street Ext. facing East Ravine adjacent to US 4 US 4 & Winter Street Ext. facing North
Existing Conditions US Route 4 and Williams/Glenmore Road
WS Auto Sales Stewarts Shop La Salle Institute
1 2 3
Existing Conditions Williams/Glenmore Road
US 4 facing North, Existing Sidewalk Limits Williams & US 4 Intersection facing East Bloomingrove Drive and Williams Road
Progress Since June 2018
- Preliminary Design
- Drainage Design/Requirements
- Right of Way Evaluation
- Assessment of Environmental Impacts
Proposed Improvements
How are project objectives developed?
Engineering Design Standards Previous Studies Stakeholder Input Public Comment
Project Objectives
Minimize Impacts Improve Safety and Mobility Meet the Project Schedule and Budget Reduce Traffic Congestion and Improve Capacity
Proposed Improvements
- Bloomingrove Drive and US Route 4 Intersection
- US Route 4 Widening
- Winter Street Ext. Traffic Signal
- US Route 4 and Williams/Glenmore Intersection
- Additional Sidewalk Locations
Proposed Improvements Bloomingrove Drive
Realigned Intersection with New Traffic Signal Widening for Turn Lane and curbed median on Bloomingrove Widening for Turn Lanes on US 4
1 2 3 4 4 4 5 3 6
Proposed Sidewalks Western Leg for Commercial Development Realign Bloomingrove West
1 2 3 4 5 6
Proposed Improvements Widening Bloomingrove to Valley View
Proposed Road Widening Two-Stage Left-Turns Minimized Changes to Parking at Commercial Businesses Proposed Sidewalk Proposed Road Widening Two-Stage Left-Turns Minimized Changes to Parking at Commercial Businesses Proposed Sidewalk
1 1 1 2 3 4 4 1 2 3 4
Proposed Improvements Winter Street Ext. Traffic Signal
Winter Street Ext. Realignment Coordinate Signal with Jordan Road Proposed Sidewalk 1 2 3 3 1 2 3
Proposed Alternative Williams Road Roundabout
Roundabout
- 2 lanes SB and WB
- Traffic Calming
- Gateway to NG
Realign Bloomingrove Driveway Access Control Sidewalks 1 2 4 4 4 3 1 2 3 4
Roundabouts – Why?
- FHWA Proven Safety Countermeasure
- 78-82% Reduction in Severe Crashes
- Improve safety for all users, including pedestrians
and bicycles
- Applicable for both urban and rural locations
- Traffic Calming (24/7/365)
Roundabouts – Vehicle Safety
Source: FHWA Roundabout Guide, 2nd Edition, Exhibits 5-1, 5-2
Roundabouts in our Community
Couse Corner Roundabout Opened May 2012
Two separate traffic studies have shown that accidents with injuries have been reduced from 13 to 1
Proposed Alternative: Williams Road Roundabout
Proposed Improvements: Sidewalks – Jordan Road to Williams Road
Proposed Sidewalk
- 5500’ along West side of Route 4 from Jordan Rd to
Glenmore/Williams Rd Intersection
- Minimal property impacts (Temporary Easement and/or
grading release)
Proposed Improvements: Construction Estimate
PROPOSED IMPROVEMENTS COST ESTIMATE
Bloomingrove to Valley View Improvements $ 3.86 M Roundabout at Williams Glenmore Intersection $ 2.96 M Winter Street Ext. $ 0.98 M Sidewalk Improvements* $ 1.83 M Total Cost - $ $ 7.79 M - $ 9.61 M Maximum Budget $ 8.26 M
* Sidewalk Improvements from Jordan Road to Williams Road will be included in the project as a bid alternate
Project Schedule
- Detailed Design/Property Acquisition
Winter/Spring 2019
- Project Out to Bid
Fall 2019
- Public Preconstruction Meeting
Winter 2020
- Construction Begins
Winter 2019/2020
- Construction Substantially Complete
Fall 2020
Public Comments/Questions
Town Procedure for comments:
- Oral Comments – Persons may make statements, and/or
submit documents concerning the proposed project tonight.
- Written Comments – emailed to the Town’s Comptroller
- r Creighton Manning.
- Electronic Comments – submitted through project
website, https://route4corridorng.com/contact/
- A copy of this presentation and display boards will be
made available on the project website
We Appreciate Your Input!
www.route4corridorng.com
Tony Germano Town Comptroller (518)-283-3525 agermano@northgreenbush.org
- Or-
Josh Wilsey Creighton Manning Engineering, LLP (518) 446-0396 jwilsey@cmellp.com Please submit comments within the next 14 days (March 27th). THANK YOU!!!!