US 83 IN ZAPATA COUNTY PUBLIC MEETING OCTOBER 10, 2019 5:00 P.M. 7:00 P.M. Zapata County Community Center 605 US Highway 83 Zapata, TX 78076 US 83 Public Meeting ELE LECTED & & PU PUBLI BLIC OFFI OFFICIALS DISTRI


slide-1
SLIDE 1

US 83 – Public Meeting

US 83

IN ZAPATA COUNTY

PUBLIC MEETING OCTOBER 10, 2019 5:00 P.M. – 7:00 P.M.

Zapata County Community Center 605 US Highway 83 Zapata, TX 78076

slide-2
SLIDE 2

US 83 – Public Meeting

2

ELE LECTED & & PU PUBLI BLIC OFFI OFFICIALS DISTRI TRICT & T & A AGENCY STAFF CONSU SULTANTS TS

slide-3
SLIDE 3

US 83 – Public Meeting

3

slide-4
SLIDE 4

US 83 – Public Meeting

#EndTheStreakTX

4

slide-5
SLIDE 5

US 83 – Public Meeting

#EndTheStreakTX

5

slide-6
SLIDE 6

US 83 – Public Meeting

Public Meeting Agenda

6

  • Welcome and Introductions

Octavio Saenz – TxDOT

  • Project Overview & Description

Craig Stong – Consultant Project Manager (TEDSI)

  • Next Steps in Project Development

Octavio Saenz – TxDOT

  • Public Comments Period
  • Adjournment
slide-7
SLIDE 7

US 83 – Public Meeting

Public Meeting Purpose

7

  • Encourage and maintain effective communication with the

public

  • Provide project information
  • Follow an important step in environmental process
  • Receive and record public input and comments
slide-8
SLIDE 8

US 83 – Public Meeting

Project Location Map

8

1 2 3

slide-9
SLIDE 9

US 83 – Public Meeting

Public Comment Opportunities

9

  • Sign up to speak and verbally give your comments tonight.
  • Fill out a comment card at the comment table.
  • Mail or drop off comments:

US 8 83 Pr Proje ject ct c/o c/o Robin in Gel Gelston TxDO xDOT Phar arr Dis District ict 600 West In Inter erstat ate 2 Phar arr, T , Texas xas 78577

  • Fax comments to 956-702-6110
  • Email comments to: Rob
  • bin.Ge

in.Gelston@txdot.gov

Deadline For Comments: Frid iday, October 25, 2019

For more information, visit txdot.gov and search “US 83 from FM 3169”

slide-10
SLIDE 10

US 83 – Public Meeting

Project Need and Purpose

  • Project Need:
  • Lacks capacity needed for future growth
  • Lacks controlled access
  • Does not meet Texas Trunk System requirements
  • Project Purpose:
  • Add capacity
  • Improve mobility
  • Upgrade to Texas Trunk System requirements

10

slide-11
SLIDE 11

US 83 – Public Meeting

Project History – Previous Activities

  • Previous Public Involvement Activities:

– Public Meetings (in Zapata)

  • March 30, 1999
  • April 9, 2000

– Open House and Public Workshops (in Zapata)

  • May 24, 2004
  • June 8, 2004
  • 2007 Environmental Assessment and FONSI
  • 2010-2013 Construction of three “Super 2” improvement projects

11

slide-12
SLIDE 12

US 83 – Public Meeting

Project Scope and Description

  • The US 83 project limits are from 3.67 miles south of FM

3169 to 0.255 miles north of Zapata/Starr County line, a distance of 22 miles

  • Expand US 83 from 2 lanes to 4 lanes.
  • Additional improvements include:
  • 10’ outside shoulders, 4’ inside shoulders
  • 12’ shoulders for hurricane evacuation on northbound roadway
  • Crossover roadways throughout project area
  • Undivided sections with 16’ center turn lane, 10’ shoulders

12

slide-13
SLIDE 13

US 83 – Public Meeting

Traffic Trend (All vehicles) – US 83

13

AVERAGE A ANNUAL DAILY T TRAFFIC ( (AADT) YEAR YEAR

81 % 1 % INCREA EASE BY 2048 2048 5, 5,500 500 5, 5,36 361 4, 4,798 798 5,849 49 8, 8,69 691

  • 1,

1,000 000 2, 2,000 000 3, 3,000 000 4, 4,000 000 5, 5,000 000 6, 6,000 000 7, 7,000 000 8, 8,000 000 9, 9,000 000 10, 10,000 000 2011 2011 2015 2015 2018 2018 2028 2028 2048 2048 PROJECTED ACTUAL

DATA SOURCE: TRANSPORTATION PLANNING AND PROGRAMMNIG

slide-14
SLIDE 14

US 83 – Public Meeting

Traffic Trend (Trucks) – US 83

14

AVERAGE A ANNUAL DAILY T TRAFFIC ( (AADT) YEAR YEAR

129 % 129 % INCREA EASE BY 2048 2048 682 682 665 665 785 785 1,21 211 1,800 800

  • 200

200 400 400 600 600 800 800 1, 1,000 000 1, 1,200 200 1, 1,400 400 1, 1,600 600 1, 1,800 800 2, 2,000 000 2011 2011 2015 2015 2018 2018 2028 2028 2048 2048 PROJECTED ACTUAL

DATA SOURCE: TRANSPORTATION PLANNING AND PROGRAMMNIG

slide-15
SLIDE 15

US 83 – Public Meeting

US 83 Ex Exis isting Typic ypical Sec ectio ion (T (Two-Lane ne segme ment)

15

  • 100’

00’-130 30’ E ’ Existi sting ng R ROW

  • 50’ overall width of existing roadway typical sections
  • two-11’ outside shoulder
  • two-12’ vehicle travel lane
  • 4’buffer
slide-16
SLIDE 16

US 83 – Public Meeting

US US 83 Existi ting Typical Secti ction (Fi Five - La Lane segm segment)

16

  • 100’

00’-160’ E 0’ Existi ting ng R ROW

  • 80’ overall width of existing roadway typical sections
  • two-8’ outside shoulder
  • four-12’ vehicle travel lane
  • 16’continous left turn lane
slide-17
SLIDE 17

US 83 – Public Meeting

US US 83 Pro roposed Typical Secti ction (Urba rban 4-Lane with Turn Lane)

17

slide-18
SLIDE 18

US 83 – Public Meeting

US 83 Proposed

  • posed Typi

ypical Sec ectio ion (R (Rural 4 4-La Lane e Div Divided) ided)

18

slide-19
SLIDE 19

US 83 – Public Meeting

Proposed Improvements – Transition Areas

  • Sample Segment – North of FM 2687 to South of Lasso Lane
  • Tables show Roll Plots of entire project

19

NO-BUIL ILD

BUIL ILD

North th North th North th

slide-20
SLIDE 20

US 83 – Public Meeting

Preliminary Environmental Findings:

Environmental Considerations

20

  • ROW impacts to 163 parcels of land
  • 393 +/- acres of new ROW needed from both sides of US 83
  • Anticipate 6 residential and 6 commercial displacements
  • 3 existing wildlife corridors at major bridges
  • 3 active oil and gas wells within proposed ROW
slide-21
SLIDE 21

US 83 – Public Meeting

Preliminary Environmental Findings (continued):

Environmental Considerations

21

  • USACE permits are required for work crossing waterways:
  • Arroyo Tigre Grande
  • Arroyo Tigre Chiquito
  • Arroyo Burro
  • Potential impacts to rare and endangered plants
  • Traffic noise study being conducted to evaluate project

impacts

  • Coordination pending with
  • Texas Parks & Wildlife Department
  • US Fish and Wildlife Service
  • Texas Historical Commission
slide-22
SLIDE 22

US 83 – Public Meeting

Project Development Schedule

22

Begin Project Public ic Meetin ing

Review Public Comments Environmental Document

Final Design

Construction

SCHE SCHEDULE I IS PRE S PRELIMINARY AN AND SUB SUBJECT T TO CHA CHANGE

20 2019 9 – 2020 2020 2023 2023 – 2030 2030 Summ mmer 201 018 TODAY 2020 2020 – 202 2021

slide-23
SLIDE 23

US 83 – Public Meeting

Public Comment Period

23

  • Step up t

up to the the mic microp

  • pho

hone ne stand tand

  • Stat

ate your ur ful full name name

  • Giv

Give y your c

  • ur comme
  • mments

nts on

  • n the

the proje

  • ject. Limit

Limit stat tateme ment t nt to 3

  • 3

minutes. es.

slide-24
SLIDE 24

US 83 – Public Meeting

Public Comment Period (3 minute timer)

End of 3 Minutes

slide-25
SLIDE 25

US 83 – Public Meeting

Public Comment Opportunities

25

  • Fill out a comment card at the comment table.
  • Mail or drop off comments:

US 8 83 Pr Proje ject ct c/o c/o Robin in Gel Gelston TxDO xDOT Phar arr Dis District ict 600 West In Inter erstat ate 2 Phar arr, T , Texas xas 78577

  • Fax comments to 956-702-6110
  • Email comments to: Rob
  • bin.Ge

in.Gelston@txdot.gov

Deadline For Comments: Frid iday, October 25, 2019

For more information, visit txdot.gov and search “US 83 from FM 3169”

Tha hank you

  • u for
  • r you
  • ur a

attendance!

slide-26
SLIDE 26

US 83 – Public Meeting

26

NEX NEXT S T STEPS TEPS

  • Compile and consider community input

from tonight’s public meeting and comment period

  • Finalize project design details
  • Prepare and finalize environmental

documentation

slide-27
SLIDE 27

US 83 – Public Meeting

27

Dora Robles, P.E. TxDOT Project Manager Office: 956-702-6348 Email: Dora.Robles@txdot.gov Thank You f for Your P Partic icip ipatio ion!