us 83
play

US 83 IN ZAPATA COUNTY PUBLIC MEETING OCTOBER 10, 2019 5:00 P.M. - PowerPoint PPT Presentation

US 83 IN ZAPATA COUNTY PUBLIC MEETING OCTOBER 10, 2019 5:00 P.M. 7:00 P.M. Zapata County Community Center 605 US Highway 83 Zapata, TX 78076 US 83 Public Meeting ELE LECTED & & PU PUBLI BLIC OFFI OFFICIALS DISTRI


  1. US 83 IN ZAPATA COUNTY PUBLIC MEETING OCTOBER 10, 2019 5:00 P.M. – 7:00 P.M. Zapata County Community Center 605 US Highway 83 Zapata, TX 78076 US 83 – Public Meeting

  2. ELE LECTED & & PU PUBLI BLIC OFFI OFFICIALS DISTRI TRICT & T & A AGENCY STAFF CONSU SULTANTS TS US 83 – Public Meeting 2

  3. US 83 – Public Meeting 3

  4. #EndTheStreakTX US 83 – Public Meeting 4

  5. #EndTheStreakTX US 83 – Public Meeting 5

  6. Public Meeting Agenda  Welcome and Introductions Octavio Saenz – TxDOT  Project Overview & Description Craig Stong – Consultant Project Manager (TEDSI)  Next Steps in Project Development Octavio Saenz – TxDOT  Public Comments Period  Adjournment US 83 – Public Meeting 6

  7. Public Meeting Purpose  Encourage and maintain effective communication with the public  Provide project information  Follow an important step in environmental process  Receive and record public input and comments US 83 – Public Meeting 7

  8. Project Location Map 1 2 3 US 83 – Public Meeting 8

  9. Public Comment Opportunities Sign up to speak and verbally give your comments tonight. • Fill out a comment card at the comment table. • Mail or drop off comments: • US 8 83 Pr Proje ject ct c/o c/o Robin in Gel Gelston TxDO xDOT Phar arr Dis District ict 600 West In Inter erstat ate 2 Phar arr, T , Texas xas 78577 Fax comments to 956-702-6110 • Email comments to: Rob obin.Ge in.Gelston@txdot.gov • Deadline For Comments: Frid iday, October 25, 2019 For more information, visit txdot.gov and search “US 83 from FM 3169” US 83 – Public Meeting 9

  10. Project Need and Purpose  Project Need: • Lacks capacity needed for future growth • Lacks controlled access • Does not meet Texas Trunk System requirements  Project Purpose: • Add capacity • Improve mobility • Upgrade to Texas Trunk System requirements US 83 – Public Meeting 10

  11. Project History – Previous Activities  Previous Public Involvement Activities: – Public Meetings (in Zapata) • March 30, 1999 • April 9, 2000 – Open House and Public Workshops (in Zapata) • May 24, 2004 • June 8, 2004  2007 Environmental Assessment and FONSI  2010-2013 Construction of three “Super 2” improvement projects US 83 – Public Meeting 11

  12. Project Scope and Description  The US 83 project limits are from 3.67 miles south of FM 3169 to 0.255 miles north of Zapata/Starr County line, a distance of 22 miles  Expand US 83 from 2 lanes to 4 lanes.  Additional improvements include: • 10’ outside shoulders, 4’ inside shoulders • 12’ shoulders for hurricane evacuation on northbound roadway • Crossover roadways throughout project area • Undivided sections with 16’ center turn lane, 10’ shoulders US 83 – Public Meeting 12

  13. Traffic Trend (All vehicles) – US 83 81 % 1 % INCREA EASE BY 2048 2048 10, 10,000 000 (AADT) 8,69 8, 691 ACTUAL PROJECTED 9, 9,000 000 TRAFFIC ( 8,000 8, 000 7,000 7, 000 5,849 49 ANNUAL DAILY T 6, 6,000 000 5,500 5, 500 5, 5,36 361 4, 4,798 798 5, 5,000 000 4, 4,000 000 AVERAGE A 3, 3,000 000 2,000 2, 000 1, 1,000 000 - - 2011 2011 2015 2015 2018 2018 2028 2028 2048 2048 YEAR YEAR DATA SOURCE: TRANSPORTATION PLANNING AND PROGRAMMNIG US 83 – Public Meeting 13

  14. Traffic Trend (Trucks) – US 83 129 % INCREA 129 % EASE BY 2048 2048 2,000 2, 000 (AADT) 1,800 800 ACTUAL PROJECTED 1, 1,800 800 TRAFFIC ( 1,600 1, 600 1, 1,400 400 1,21 211 ANNUAL DAILY T 1, 1,200 200 1, 1,000 000 785 785 665 665 682 682 800 800 AVERAGE A 600 600 400 400 200 200 - - 2011 2011 2015 2015 2018 2018 2028 2028 2048 2048 YEAR YEAR DATA SOURCE: TRANSPORTATION PLANNING AND PROGRAMMNIG US 83 – Public Meeting 14

  15. US 83 Ex Exis isting Typic ypical Sec ectio ion (T (Two-Lane ne segme ment)  100’ 00’-130 30’ E ’ Existi sting ng R ROW • 50’ overall width of existing roadway typical sections  two-11’ outside shoulder  two-12’ vehicle travel lane  4’buffer US 83 – Public Meeting 15

  16. US 83 Existi US ting Typical Secti ction (Fi Five - La Lane segm segment)  100’ 00’-160’ E 0’ Existi ting ng R ROW • 80’ overall width of existing roadway typical sections  two-8’ outside shoulder  four-12’ vehicle travel lane  16’continous left turn lane US 83 – Public Meeting 16

  17. US US 83 Pro roposed Typical Secti ction (Urba rban 4-Lane with Turn Lane) US 83 – Public Meeting 17

  18. US 83 Proposed oposed Typi ypical Sec ectio ion (R (Rural 4 4-La Lane e Div Divided) ided) US 83 – Public Meeting 18

  19. Proposed Improvements – Transition Areas  Sample Segment – North of FM 2687 to South of Lasso Lane  Tables show Roll Plots of entire project North th North th ILD NO-BUIL North th ILD BUIL US 83 – Public Meeting 19

  20. Environmental Considerations Preliminary Environmental Findings:  ROW impacts to 163 parcels of land  393 +/- acres of new ROW needed from both sides of US 83  Anticipate 6 residential and 6 commercial displacements  3 existing wildlife corridors at major bridges  3 active oil and gas wells within proposed ROW US 83 – Public Meeting 20

  21. Environmental Considerations Preliminary Environmental Findings (continued):  USACE permits are required for work crossing waterways: Arroyo Tigre Grande • Arroyo Tigre Chiquito • Arroyo Burro •  Potential impacts to rare and endangered plants  Traffic noise study being conducted to evaluate project impacts  Coordination pending with o Texas Parks & Wildlife Department o US Fish and Wildlife Service o Texas Historical Commission US 83 – Public Meeting 21

  22. Project Development Schedule Final Begin Public ic Review Public Comments Construction Design Meetin ing Project Environmental Document 2020 2020 2023 2023 Summ mmer – TODAY 20 2019 9 – 2020 2020 – 201 018 2021 202 2030 2030 SCHEDULE I SCHE IS PRE S PRELIMINARY AN AND SUB SUBJECT T TO CHA CHANGE US 83 – Public Meeting 22

  23. Public Comment Period • Step up t up to the the mic microp opho hone ne stand tand • Stat ate your ur ful full name name • Giv Give y your c our comme omments nts on on the the proje oject. Limit Limit stat tateme ment t nt to 3 o 3 minutes. es. US 83 – Public Meeting 23

  24. Public Comment Period (3 minute timer) End of 3 Minutes US 83 – Public Meeting

  25. Public Comment Opportunities Fill out a comment card at the comment table. • Mail or drop off comments: • US 8 83 Pr Proje ject ct c/o c/o Robin in Gel Gelston TxDO xDOT Phar arr Dis District ict 600 West In Inter erstat ate 2 Phar arr, T , Texas xas 78577 Fax comments to 956-702-6110 • Email comments to: Rob obin.Ge in.Gelston@txdot.gov • Deadline For Comments: Frid iday, October 25, 2019 For more information, visit txdot.gov and search “US 83 from FM 3169” Tha hank you ou for or you our a attendance! US 83 – Public Meeting 25

  26. NEX NEXT S T STEPS TEPS • Compile and consider community input from tonight’s public meeting and comment period • Finalize project design details • Prepare and finalize environmental documentation US 83 – Public Meeting 26

  27. Dora Robles, P.E. TxDOT Project Manager Office: 956-702-6348 Email: Dora.Robles@txdot.gov Thank You f for Your P Partic icip ipatio ion! US 83 – Public Meeting 27

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.