US 192 Feasibility Study Hollywood Blvd. Wickham Rd. Space Coast Transportation Planning Organization TAC / CAC October 6, 2014 TPO Board October 9, 2014 1 1 Agenda US 192 Feasibility Study Wickham Rd. Concept Development Hollywood


  1. US 192 Feasibility Study Hollywood Blvd. Wickham Rd. Space Coast Transportation Planning Organization TAC / CAC October 6, 2014 TPO Board October 9, 2014 1 1

  2. Agenda • US 192 Feasibility Study • Wickham Rd. Concept Development • Hollywood Blvd. Concept Development 2

  3. US 192 Feasibility Study • Feasibility of 4 to 6 lane widening from I ‐ 95 to Babcock Street • Recommendations from study o Focus funding on Ellis Road improvements o Intersection improvements at Wickham Rd. and Hollywood Blvd. o Re ‐ assess traffic patterns along US 192 after Ellis Road improvements are complete 3

  4. US 192 Background US 192 Feasibility Study (November 2011 to October 2012) Wickham Rd. and Hollywood Blvd. Intersection Improvements (June 2013 to Present) Funded for FY 18 TBD * Figure excerpt taken from FDOT D5 Multi ‐ Modal Corridor Planning Guidebook 4

  5. Concept Development Coordination • Coordination with the FDOT for intersection improvement concepts o Traffic Ops and Design Office o ROW Office o Long Range Estimate Office o Systems Development Office • Meetings held throughout project to review concept development with the FDOT and City of West Melbourne 5

  6. Wickham Rd. Concept Development 6

  7. Wickham Rd. Intersection Needs • Total entering volume of 55,700 – 4th highest in County • Wickham Road volume of 26,500 contributing to delays along mainline US 192 • EB and SB approaches do not have exclusive right turn lanes • NB and SB approaches do not have dual left turn lanes Existing Lane Configuration 7

  8. Wickham Rd. Intersection Constraints Utility and ROW • No ROW available on the north leg for improvements Walgreens Parking • Utility poles located along west side of Wickham Rd. • In order to add lanes on the north leg: Impacts include the utilities/ROW o No ROW on west side or Impacts to Walgreens parking on o east side 8

  9. Wickham Rd. Concepts Concept 2 Concept 1 Concepts 3, 4, and 5 9

  10. Wickham Rd. Preferred Alternative • 3 concepts dropped due to low benefit/cost ratio High cost from ROW impacts on north leg o • Concept 1 and Concept 2 comparable operational benefits • Concept 2 preferred alternative Can construct both turn lane additions within the ROW o Concept 2 Concept 1 Concepts 3, 4, and 5 10

  11. Wickham Rd. Preferred Alternative 11

  12. Hollywood Blvd. Concept Development 12

  13. Hollywood Blvd. Intersection Needs • Total entering volume of 49,000 – 14th highest in County • Lack of adequate lanes on Hollywood Blvd. contributing to delays along mainline US 192 • The SB approach right turn volume is over 600 in the PM peak hour Existing Lane Configuration 13

  14. Hollywood Blvd. Intersection Constraints • No ROW available on the south leg for improvements • In order to add lanes and Barnes & Noble Parking sidewalk on the south leg: Impacts to SW corner parcels, o and TGI Friday’s on west side Formerly or Coeye Impacts to Barnes & Noble on o east side Farm Store No ROW 14

  15. Hollywood Blvd. Concepts Concept 1 Concepts 2, 3 and 4 15

  16. Hollywood Blvd. Preferred Alternative • South leg of intersection planned to be widened from 2 to 4 lanes, including sidewalk on both sides Concepts 1 and 2 do not coincide with plan o • Concepts 3 and 4 are consistent with 4 laning plans  Concept 3 impacts the Barnes & Noble parking with unknown drainage impact/cost • Concept 4 is preferred alternative due to unknown drainage impacts for Concept 3  Full parcel acquisitions of the two properties on SW corner needed 16

  17. Hollywood Blvd. Preferred Alternative 17

  18. Cost Estimates Intersection Design (FY 18) ROW Construction Total Cost Wickham Rd. $720,000 $0 $990,000 $1,710,000 Hollywood Blvd. $630,000 $5,760,000 $3,610,000 $10,000,000 18

  19. Next Steps and Questions Revising design scopes and cost estimates with FDOT Funded for FY 18 Final report and design scopes expected TBD November 2014 * Figure excerpt taken from FDOT D5 Multi ‐ Modal Corridor Planning Guidebook 19

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.