US 192 Feasibility Study Hollywood Blvd. Wickham Rd. Space Coast Transportation Planning Organization TAC / CAC October 6, 2014 TPO Board October 9, 2014 1 1 Agenda US 192 Feasibility Study Wickham Rd. Concept Development Hollywood


slide-1
SLIDE 1

1

Space Coast Transportation Planning Organization

1

US 192 Feasibility Study

TAC / CAC October 6, 2014 TPO Board October 9, 2014

Wickham Rd. Hollywood Blvd.

slide-2
SLIDE 2
  • US 192 Feasibility Study
  • Wickham Rd. Concept Development
  • Hollywood Blvd. Concept Development

Agenda

2

slide-3
SLIDE 3
  • Feasibility of 4 to 6 lane widening from I‐95 to Babcock

Street

  • Recommendations from study
  • Focus funding on Ellis Road improvements
  • Intersection improvements at Wickham Rd. and Hollywood

Blvd.

  • Re‐assess traffic patterns along US 192 after Ellis Road

improvements are complete

US 192 Feasibility Study

3

slide-4
SLIDE 4

US 192 Background

4

US 192 Feasibility Study

(November 2011 to October 2012)

Wickham Rd. and Hollywood

  • Blvd. Intersection Improvements

(June 2013 to Present)

Funded for FY 18 TBD

* Figure excerpt taken from FDOT D5 Multi‐Modal Corridor Planning Guidebook

slide-5
SLIDE 5
  • Coordination with the FDOT for intersection

improvement concepts

  • Traffic Ops and Design Office
  • ROW Office
  • Long Range Estimate Office
  • Systems Development Office
  • Meetings held throughout project to review concept

development with the FDOT and City of West Melbourne

Concept Development Coordination

5

slide-6
SLIDE 6

Wickham Rd. Concept Development

6

slide-7
SLIDE 7

Wickham Rd. Intersection Needs

7

  • Total entering volume of 55,700 – 4th highest in County
  • Wickham Road volume of 26,500 contributing to delays

along mainline US 192

  • EB and SB approaches do not have exclusive right turn

lanes

  • NB and SB approaches do not have dual left turn lanes

Existing Lane Configuration

slide-8
SLIDE 8

Wickham Rd. Intersection Constraints

8

  • No ROW available on the north

leg for improvements

  • Utility poles located along west

side of Wickham Rd.

  • In order to add lanes on the

north leg:

  • Impacts include the utilities/ROW
  • n west side or
  • Impacts to Walgreens parking on

east side

No ROW Walgreens Parking Utility and ROW

slide-9
SLIDE 9

Wickham Rd. Concepts

9

Concept 1 Concept 2 Concepts 3, 4, and 5

slide-10
SLIDE 10

Wickham Rd. Preferred Alternative

10

  • 3 concepts dropped due to low benefit/cost ratio
  • High cost from ROW impacts on north leg
  • Concept 1 and Concept 2 comparable operational

benefits

  • Concept 2 preferred alternative
  • Can construct both turn lane additions within the ROW

Concept 1 Concept 2 Concepts 3, 4, and 5

slide-11
SLIDE 11

Wickham Rd. Preferred Alternative

11

slide-12
SLIDE 12

Hollywood Blvd. Concept Development

12

slide-13
SLIDE 13

Hollywood Blvd. Intersection Needs

13

  • Total entering volume of

49,000 – 14th highest in County

  • Lack of adequate lanes
  • n Hollywood Blvd.

contributing to delays along mainline US 192

  • The SB approach right

turn volume is over 600 in the PM peak hour

Existing Lane Configuration

slide-14
SLIDE 14

Hollywood Blvd. Intersection Constraints

14

  • No ROW available on the

south leg for improvements

  • In order to add lanes and

sidewalk on the south leg:

  • Impacts to SW corner parcels,

and TGI Friday’s on west side

  • r
  • Impacts to Barnes & Noble on

east side

No ROW Barnes & Noble Parking Formerly Coeye Farm Store

slide-15
SLIDE 15

Hollywood Blvd. Concepts

15

Concept 1 Concepts 2, 3 and 4

slide-16
SLIDE 16

Hollywood Blvd. Preferred Alternative

16

  • South leg of intersection planned to be widened from 2

to 4 lanes, including sidewalk on both sides

  • Concepts 1 and 2 do not coincide with plan
  • Concepts 3 and 4 are consistent with 4 laning plans
  • Concept 3 impacts the Barnes & Noble parking with unknown

drainage impact/cost

  • Concept 4 is preferred alternative due to unknown

drainage impacts for Concept 3

  • Full parcel acquisitions of the two properties on SW corner needed
slide-17
SLIDE 17

Hollywood Blvd. Preferred Alternative

17

slide-18
SLIDE 18

Cost Estimates

18

Intersection Design (FY 18) ROW Construction Total Cost Wickham Rd. $720,000 $0 $990,000 $1,710,000 Hollywood Blvd. $630,000 $5,760,000 $3,610,000 $10,000,000

slide-19
SLIDE 19

Next Steps and Questions

19

Funded for FY 18 TBD

* Figure excerpt taken from FDOT D5 Multi‐Modal Corridor Planning Guidebook

Revising design scopes and cost estimates with FDOT Final report and design scopes expected November 2014