1
Space Coast Transportation Planning Organization
1
US 192 Feasibility Study
TAC / CAC October 6, 2014 TPO Board October 9, 2014
Wickham Rd. Hollywood Blvd.
US 192 Feasibility Study Hollywood Blvd. Wickham Rd. Space Coast - - PowerPoint PPT Presentation
US 192 Feasibility Study Hollywood Blvd. Wickham Rd. Space Coast Transportation Planning Organization TAC / CAC October 6, 2014 TPO Board October 9, 2014 1 1 Agenda US 192 Feasibility Study Wickham Rd. Concept Development Hollywood
1
Space Coast Transportation Planning Organization
1
TAC / CAC October 6, 2014 TPO Board October 9, 2014
Wickham Rd. Hollywood Blvd.
2
Blvd.
improvements are complete
3
4
US 192 Feasibility Study
(November 2011 to October 2012)
Wickham Rd. and Hollywood
(June 2013 to Present)
Funded for FY 18 TBD
* Figure excerpt taken from FDOT D5 Multi‐Modal Corridor Planning Guidebook
5
6
7
Existing Lane Configuration
8
east side
No ROW Walgreens Parking Utility and ROW
9
Concept 1 Concept 2 Concepts 3, 4, and 5
10
Concept 1 Concept 2 Concepts 3, 4, and 5
11
12
13
Existing Lane Configuration
14
and TGI Friday’s on west side
east side
No ROW Barnes & Noble Parking Formerly Coeye Farm Store
15
Concept 1 Concepts 2, 3 and 4
16
drainage impact/cost
17
18
Intersection Design (FY 18) ROW Construction Total Cost Wickham Rd. $720,000 $0 $990,000 $1,710,000 Hollywood Blvd. $630,000 $5,760,000 $3,610,000 $10,000,000
19
Funded for FY 18 TBD
* Figure excerpt taken from FDOT D5 Multi‐Modal Corridor Planning Guidebook
Revising design scopes and cost estimates with FDOT Final report and design scopes expected November 2014