update report
play

Update Report October 25 th , 2018 Raymond Design Associates - PowerPoint PPT Presentation

Elbridge Gerry Building Committee Meeting Schematic Design Update Report October 25 th , 2018 Raymond Design Associates Security Working Group Mtg Review Items ALICE Protocol Zoning Off Various Wings Emergency Access to


  1. Elbridge Gerry Building Committee Meeting Schematic Design Update Report October 25 th , 2018 Raymond Design Associates

  2. Security Working Group Mtg Review Items • • ALICE Protocol Zoning Off Various Wings • • Emergency Access to Building / Site Exterior Classroom Doors • • Site Barriers / Gates Passage Doors Between Classrooms • • Various Entry / Egress Sequences Open Cubbies v. Lockers • • Administrative Suite Location / Oversight Extended Learning Spaces • • Mullion Screens v. Ballistic Film Shelter for Cafetorium / Gymnasium • – or – Two-Sided Stage • Ballistic-Resistant Glass Hardware • Electronic Systems

  3. Bollards Bollards Raised Planting Bed Sitting Wall Vehicular Site Security Recommendations

  4. Annotated Ground Floor Plan

  5. Annotated Second Floor Plan

  6. Site Plan Options --- Potential Cost Savings

  7. Grading Utilities Retaining Wall Sports Netting Maintain Walkway at Jane Road Option #1 – Site Revisions

  8. Grading Utilities Retaining Wall Sports Netting Eliminate Walkway at Jane Road Option #2 – Site Revisions

  9. Questions & Comments

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.

Recommend


More recommend