Unleashing the potential of CBM using MIMOSA standards Pak Wong PdMA Corporation MIMOSA Open Meeting Houston, TX Dec 4th, 2019 What do we do? Motor diagnostics and monitoring in different phases of Asset Life Cycle Diagnostics


slide-1
SLIDE 1

Unleashing the potential of CBM using MIMOSA standards

Pak Wong PdMA Corporation

MIMOSA Open Meeting Houston, TX Dec 4th, 2019

slide-2
SLIDE 2

What do we do?

  • Diagnostics and Monitoring (online and offline)
  • Quality control
  • Repair and Overhaul

Motor diagnostics and monitoring in different phases of Asset Life Cycle

slide-3
SLIDE 3

Industries we serve

slide-4
SLIDE 4

What is Condition Based Monitoring?

slide-5
SLIDE 5

F P

Condition Cost to Repair P-F Interval Time

PF Curve

Potential Failure Functional Failure Condition Based Monitoring moves point P to the earliest time possible, maximizing the P-F Interval

slide-6
SLIDE 6

OGI Pilot Demo

Condition Based Maintenance

slide-7
SLIDE 7

ws-ISBM adaptor

OGI Pilot: Condition Based Maintenance

CCOM Messages Vendor neutral Restful Interfaces to an enterprise service bus (ESB) MIMOSA Web Service Information Service Bus Model MIMOSA CCOM (Common Conceptual Object Model) Information model to facilitate standards-based interoperability between systems

Transport Payload

slide-8
SLIDE 8

Condition Based Maintenance and IIoT

Inter-Enterprise via ISBM

Automated System Bus Operational Risk Management System

Device Manufacturer Supplying Remote Diagnostic/Prognostic/Advisory Support Owner/Operator

Intra-Enterprise ISBM

IIoT Device IIoT Device

Automation and Control HSE and Operation Monitoring Prognostic & Health Management Sensor/ Transducer Device Device

HSE and Operation Monitoring Prognostic & Health Management Maintenance Management System

IIoT Device

SDAIR

ERP

slide-9
SLIDE 9

ws-ISBM adaptor

OGI Pilot: Condition Based Maintenance

CCOM Messages Vendor neutral Restful Interfaces to an enterprise service bus (ESB) MIMOSA Web Service Information Service Bus Model MIMOSA CCOM (Common Conceptual Object Model) Information model to facilitate standards-based interoperability between systems

Transport Payload

slide-10
SLIDE 10

The object model defined for Health Assessment by CCOM

slide-11
SLIDE 11

Enterprise Service Bus

ws-ISBM adaptor ws-ISBM adaptor Universal Consumer Client Provider Application Temp. Sensor Flow Meter

OGI Pilot: Condition Based Maintenance

SimpleISBM

slide-12
SLIDE 12

Enterprise Service Bus

ws-ISBM adaptor ws-ISBM adaptor Universal Consumer Client Provider Application Temp. Sensor Motor Data CCOM Messages Subscribe Publish

OGI Pilot: Condition Based Maintenance

SimpleISBM

slide-13
SLIDE 13

Provider

slide-14
SLIDE 14

Provider

slide-15
SLIDE 15

Provider

slide-16
SLIDE 16

Provider

slide-17
SLIDE 17

Provider

slide-18
SLIDE 18

Provider

slide-19
SLIDE 19

Consumer

slide-20
SLIDE 20

Consumer

slide-21
SLIDE 21

Consumer

slide-22
SLIDE 22

Consumer

slide-23
SLIDE 23

OGI Pilot: Condition Based Maintenance

  • Measurement
  • HealthAssessment
  • Advisory
  • RequestForWork

CCOM objects used in OGI Pilot

slide-24
SLIDE 24

Internet Engineering Field Service Tech Ops Customer/Operator Data Analytics/Monitoring PdMA Information Services PdMA equipment Data Asset Health Assessments and Advisories PdMA Cloud Servers Third Party Systems EAM, CMMS, Operations, etc CCOM Messages

PdMA Equipment Data CCOM Messages

slide-25
SLIDE 25

CCOM Work in Process

slide-26
SLIDE 26

747-200

3 man crew

slide-27
SLIDE 27

747-400

2 man crew

slide-28
SLIDE 28

Generator #4 Generator #3 Engine #4 Engine #3 Engine #2 propulsion Generator #2 Engine #1 Electric Power Generator #1 Primary Auxiliary Backup APU Generator Battery

Dashboard Example

slide-29
SLIDE 29

Dashboard

Input Layer Hidden/Visible Layer 1 Hidden/Visible Layer 2 Output Layer Measurements Conditions/Recommendations

Dashboard

General Mapping of Decision Process

Dashboard Dashboard Dashboard

slide-30
SLIDE 30

Dashboard Example

Motor in Poor Health State

slide-31
SLIDE 31

Dashboard DashboardType DashboardAssociation

Dashboard Proposal to CCOM

slide-32
SLIDE 32

Dashboard

Input Layer Hidden/Visible Layer 1 Hidden/Visible Layer 2 Output Layer Measurements Conditions/Recommendations

Dashboard

General Mapping of Decision Process

Dashboard Dashboard Dashboard

DashboardAssociation

slide-33
SLIDE 33

Dashboard

Dashboard Proposal to CCOM

Asset HealthAssessment MeasuermentLocation

slide-34
SLIDE 34

Dashboard Example

Motor in Poor Health State

slide-35
SLIDE 35
slide-36
SLIDE 36

Dashboard Example

Motor in Poor Health State

slide-37
SLIDE 37
slide-38
SLIDE 38

Dashboard Example

Motor in Poor Health State

slide-39
SLIDE 39
slide-40
SLIDE 40

Conclusion

  • CCOM has huge potential and the possibility is

endless

  • It seems complicated but there are good

reasons

  • It brings reliability engineers and IT

professionals together

  • CCOM has great pattern, easy to code and

adding new capabilities

  • Don’t reinvent the bicycle