TSOs com pliance w ith transparency requirem ents from Regulation ( EC)
- No. 7 1 5 / 2 0 0 9
Focus on North-W est region
Juan de Miguel ACER
1 0 th Stakeholder Group m eeting of GRI NW
2 3 Novem ber 2 0 1 2
TSOs com pliance w ith transparency requirem ents from Regulation ( - - PowerPoint PPT Presentation
TSOs com pliance w ith transparency requirem ents from Regulation ( EC) No. 7 1 5 / 2 0 0 9 Focus on North-W est region Juan de Miguel ACER 1 0 th Stakeholder Group m eeting of GRI NW 2 3 Novem ber 2 0 1 2 Monitoring of transparency com
TSOs com pliance w ith transparency requirem ents from Regulation ( EC)
Focus on North-W est region
Juan de Miguel ACER
1 0 th Stakeholder Group m eeting of GRI NW
2 3 Novem ber 2 0 1 2
10th SG meeting of GRI NW – 23 November 2012
Outline
Monitoring of transparency com pliance
Regulation ( EC) No. 7 1 5 / 2 0 0 9 - Focus on NW region
10th SG meeting of GRI NW – 23 November 2012
Background
pre-requisite for a level playing field for all network users and market actors
desirable in order to achieve the following goals:
allows them to perform their activities
supervisory authorities
procedures (nomination, capacity booking, contracting services, balancing, etc.)
im plem entation of transparency rules pursuant to Chapter 3, Annex I of Regulation 715/ 2009
Monitoring of transparency com pliance
Regulation ( EC) No. 7 1 5 / 2 0 0 9 - Focus on NW region
10th SG meeting of GRI NW – 23 November 2012
Scope of ACER analysis
Decision of 1 0 Novem ber 2 0 1 0 , applicable since 3 March 2 0 1 1 :
XXI Madrid Forum in March 2012 and the final results in the XXI I Madrid Forum in October 2012
recent update of compliance by German TSOs
this analysis. NRAs, TSOs and other stakeholders have contributed decisively to it
Monitoring of transparency com pliance
Regulation ( EC) No. 7 1 5 / 2 0 0 9 - Focus on NW region
10th SG meeting of GRI NW – 23 November 2012
NW region – Results per requirem ent ( 1 )
Monitoring of transparency com pliance
Regulation ( EC) No. 7 1 5 / 2 0 0 9 - Focus on NW region
Notes:
3 6 9 12 15 18 21 (a) Website publicly accessible, free
without registration (b) On a regular/rolling basis (c) In a user- friendly manner (d) Clear, quantifiable, easily accessible and non- discriminatory (e) In downloadable format allowing for quantitative analyses (f) In consistent units, in particular kWh for energy and m3 for volume (g) In the national language (g) In English Info on actual changes to information in a timely manner
Number of compliant TSOs
Section 3.1.1 - Form of publication
Yes Partially No Not applicable, forthcoming or exemption pending No data
10th SG meeting of GRI NW – 23 November 2012
NW region – Results per requirem ent ( 2 )
Monitoring of transparency com pliance
Regulation ( EC) No. 7 1 5 / 2 0 0 9 - Focus on NW region
3 6 9 12 15 18 21a) Description of services a) Charges b) Types of transportation contracts c) Network code and/or standard conditions
d) Harmonised procedures in the transmission system e).1. Capacity allocation e).2. Congestion management e).3. Anti-hoarding e).4. Reutilisation procedures f) Rules of secondary market g) Rules on balancing and calculation of imbalance charges h) Flexibility and tolerance levels included h) any flexibility additionally offered and charges i) Detailed description of gas system and relevant IPs i) Names of operators of interconnected systems j) Rules for connection to the system k) Information on emergency mechanisms l) Procedures agreed by TSOs at IPs l) Agreed procedures on nomination and matching l) Other agreed procedures (gas flow allocation and balancing) m) Description of methodology and process for capacity calculation Number of compliantTSOs
Section 3.1.2 - Content of publication
Yes Partially No Not applicable, forthcoming or exemption pending No data
10th SG meeting of GRI NW – 23 November 2012
NW region – Results per requirem ent ( 3 )
Monitoring of transparency com pliance
Regulation ( EC) No. 7 1 5 / 2 0 0 9 - Focus on NW region
3 6 9 12 15 18 21 (a) Technical capacity Is it published on a numerical basis? Is it in hourly or daily periods (smallest reference period)? Is it published and updated as soon as available to TSO (“near real time”)? Is it published for at least 18 months ahead? Do you publish historical information for the past five years? Aggregated information for single final customers and production facilities (b) Total contracted firm and interruptible capacity Is it published on a numerical basis? Is it in hourly or daily periods (smallest reference period)? Is it published and updated as soon as available to TSO (“near real time”)? Is it published for at least 18 months ahead? Do you publish historical information for the past five years? (c) Nominations and re-nominations Is it published on a numerical basis? Is it in hourly or daily periods (smallest reference period)? Is it published and updated as soon as available to TSO (“near real time”)? Do you publish historical information for the past five years? (d) Available firm and interruptible capacity Is it published on a numerical basis? Is it in hourly or daily periods (smallest reference period)? Is it published and updated as soon as available to TSO (“near real time”)? Is it published for at least 18 months ahead? Do you publish historical information for the past five years? (e) Actual physical flows Is it published on a numerical basis? Is it in hourly or daily periods (smallest reference period)? Is it published and updated as soon as available to TSO (“near real time”)? Do you publish historical information for the past five years? (f) Planned and actual interruption of interruptible capacity Is it published on a numerical basis? Is it in hourly or daily periods (smallest reference period)? Is it published and updated as soon as available to TSO (“near real time”)? Do you publish historical information for the past five years? (g) Planned and unplanned interruptions to firm services Are planned interruptions published at least 42 days in advance? Is it published as soon as available to you (“near real time”)? Do you publish historical information for the past five years?Number of compliantTSOs
Section 3.3 - Information at all relevant points
Yes Partially No Not applicable, forthcoming or exemption pending No data10th SG meeting of GRI NW – 23 November 2012
NW region – Results per requirem ent ( 4 )
Monitoring of transparency com pliance
Regulation ( EC) No. 7 1 5 / 2 0 0 9 - Focus on NW region
3 6 9 12 15 18 21 Secondary market: (a) interconnection point where capacity is sold Secondary market: (b) Type of capacity (entry, exit, firm, interruptible) Secondary market: (c) Quantity and duration of capacity rights Secondary market: (d) Type of sale (transfer or assignment) Secondary market: (e) Total number of trades/transfers Secondary market: (f) Any other conditions known to the TSO Secondary market: (a) Description of standardised productsNumber of compliant TSOs
Section 3.4 - Information regarding the transmission system
Yes Partially No Not applicable, forthcoming or exemption pending No data10th SG meeting of GRI NW – 23 November 2012
NW region – Results per requirem ent ( and 5 )
Monitoring of transparency com pliance
Regulation ( EC) No. 7 1 5 / 2 0 0 9 - Focus on NW region
3 6 9 12 15 18 21 Amount of gas in the system at the start of each gas day Forecast of amount of gas in the system at the end of each gas day Amount of gas in the system on an hourly basis Hourly updates of forecast amount of gas for the end of the gas day Alternatively, aggregate imbalance position of users at the start of each balancing period Forecast of the aggregated imbalance position of all users at the end of gas day User-friendly instruments for calculating tariffs
Number of compliant TSOs
Section 3.4 - Information on the transmission system 3.4.5. & 3.4.6. Information per balancing zone and tariff calculation tool
Yes Partially No Not applicable, forthcoming or exemption pending No data
10th SG meeting of GRI NW – 23 November 2012
NW region – Results per country and TSO
Monitoring of transparency com pliance
Regulation ( EC) No. 7 1 5 / 2 0 0 9 - Focus on NW region
Notes:
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100% Fluxys Energinet.DK GRTgaz Bayernets Gastransport Nord Gasunie Deutschland GRTgaz Deutschland Jordgas Nowega ONTRAS OGE Terranets BW Thyssengas National Grid Interconnector (UK) limited Gaslink BBL (Interconnector) GTS BGE (UK) Mutual Energy Swedagas & Svenska Kraftnät… AVERAGE
% of requirements met
Transparency monitoring (Annex I.3 of Reg. 715/2009) North-West region
Yes N/A, forthcoming or exemption request pending No No data
10th SG meeting of GRI NW – 23 November 2012
NW region – Main findings
(EC) No 715/ 2009, in particular in the case of information on:
Description of transmission system and services Network code – contracts, pressure requirements, interruption procedure Provisions on CAM, CMP anti-hoarding and reutilisation Nomination and matching procedures Balancing rules and imbalance charges Rules for connection to TSOs’ facilities General information on technical/ booked-available/ firm-interruptible capacity User-friendly instruments for calculating tariffs Form of publication (easy access, user-friendliness, frequency of data, etc.)
Monitoring of transparency com pliance
Regulation ( EC) No. 7 1 5 / 2 0 0 9 - Focus on NW region
10th SG meeting of GRI NW – 23 November 2012
x Aggregate information on capacities for end customers and production facilities x Historical information on capacities, nominations, interruptions, physical flows x Amount of gas at the beginning of the day and forecast for the end of the day x Imbalance position of users at the start and end of the day
concerned TSOs and NRAs
NW region – Main findings
Monitoring of transparency com pliance
Regulation ( EC) No. 7 1 5 / 2 0 0 9 - Focus on NW region
10th SG meeting of GRI NW – 23 November 2012
Some issues identified when assessing compliance:
published close to real time or as soon as becomes available to the TSO)
relevant or yet available (e.g. information on secondary market, daily capacity data when only monthly allocation is offered, etc.)
Monitoring of transparency com pliance
Regulation ( EC) No. 7 1 5 / 2 0 0 9 - Focus on NW region
Some examples of good practice:
1 of Regulation 715/ 2009 in a section called “Transparency” in the TSO website
manager) a direct link is provided in the TSO website
I ssues identified and exam ples of good practice
10th SG meeting of GRI NW – 23 November 2012
NW region – Stakeholders feedback ( 1 )
Monitoring of transparency com pliance
Regulation ( EC) No. 7 1 5 / 2 0 0 9 - Focus on NW region
General com m ents »
Remarkable efforts have been made by TSOs. There has been significant progress
»
However, there is room for improvement. Stakeholders don’t share the overall “green picture”
»
Compliance is not just a “tick-list” exercise, issues are beyond the quantitative analysis
»
TSOs await for specific guidance from NRAs to implement the requirements
Quality, consistency, frequency and availability of the inform ation » Despite overall compliance, large variety in the quality of information » Multiplicity of sources and websites make it hard to find and process information » Quality standards and a single transparency platform supported by many stakeholders
10th SG meeting of GRI NW – 23 November 2012
NW region – Stakeholders feedback ( and 2 )
Monitoring of transparency com pliance
Regulation ( EC) No. 7 1 5 / 2 0 0 9 - Focus on NW region Accuracy of TSOs’ responses »
The questionnaires broadly reflect the information available, but not always its quality
»
Implicit degree of subjectivity and interpretation concerning some requirements
»
Compliance with some requirements is directly related to market design
User-friendliness of inform ation and free access »
The degree of user-friendliness of the websites and platforms differs
»
Standardisation of formats would improve ease of access
»
Information is free of charge, but registration is necessary in some cases
Availability close to real tim e »
Requirement difficult to assess, but in view of many users only a few TSOs publish data close to real time
»
Information on actual gas flows seems to be a major issue
»
Insufficient frequency of data publication in some TSO websites compared to others
10th SG meeting of GRI NW – 23 November 2012
Main conclusions
the transparency requirements in Section 3, Annex 1 of Regulation 715/ 2009
about the system, services provided, system procedures and general data of technical and available/ booked capacities
areas, such as information near real time, flexibility and tolerances, planned and actual interruptions, amounts of gas at start and end
near real tim e or as soon as available to the TSO (e.g. gas flows) and quality of information in some cases Monitoring of transparency com pliance
Regulation ( EC) No. 7 1 5 / 2 0 0 9 - Focus on NW region
10th SG meeting of GRI NW – 23 November 2012
W ay forw ard
Work on these upcoming requirements has started already or will soon do it
Monitoring of transparency com pliance
Regulation ( EC) No. 7 1 5 / 2 0 0 9 - Focus on NW region
together with TSOs
action is necessary to achieve full compliance
amendments to Annex I of Regulation 715/ 2009, introducing new guidelines on CMP as well as some further transparency obligations:
harmonised format that allows for quantitative analyses
by ENTSOG on a cost-efficient basis
10th SG meeting of GRI NW – 23 November 2012
For any feedback or further com m ent:
TransparencyGas@acer.europa.eu
Monitoring of transparency com pliance
Regulation ( EC) No. 7 1 5 / 2 0 0 9 - Focus on NW region
10th SG meeting of GRI NW – 23 November 2012
Disclaim er
speaker and do not necessarily reflect the views of the Agency for the Cooperation of Energy Regulators, or of any of its Boards.
guarantee the accuracy of all data and information included in this presentation and accepts no responsibility for any consequence of their use.
Monitoring of transparency com pliance
Regulation ( EC) No. 7 1 5 / 2 0 0 9 - Focus on NW region
Thank you for your attention!
w w w .acer.europa.eu
10th SG meeting of GRI NW – 23 November 2012
Annex Detailed results from the analysis
Colour tables in the NW region
Code key:
Transparency m onitoring
Com pliance w ith Chapter 3 , Annex I of Reg. 7 1 5 / 2 0 0 9
Yes Yes P Partially No No NA Not applicable, forthcoming or exemption request pending B No data
10th SG meeting of GRI NW – 23 November 2012
Detailed results – NW region
Transparency m onitoring
Com pliance w ith Chapter 3 , Annex I of Reg. 7 1 5 / 2 0 0 9
Countr y Code BE DK FR GB I E NL SE GB/ NL GB/ B Do you publish the inform ation referred to under paragraph 3.1.2. in the following m anner: (a) on a website accessible to the public, free of charge and without any need to register or otherwise sign on with the transm ission system operator; Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes (b) on a regular/ rolling basis; the frequency shall be according to the changes that take place and the duration of the service; Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes (c) in a user-friendly m anner; Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes (d) in a clear, quantifiable, easily accessible way and on a non- discrim inatory basis; Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes (e) in downloadable form at that allows for quantitative analyses; Yes Yes Yes Yes Yes Yes No No Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes (f) in consistent units, in particular kWh (with a com bustion reference tem perature of 298,15 K) shall be the unit for energy content and m 3 (at 273,15 K and 1,01325 bar) shall be the unit for volum e. The constant conversion factor to energy content shall be provided. I n addition to the form at above, publication in other units is also possible; Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes No Yes Yes Yes Yes (g) in the official languages of the m em ber State and Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes No Yes Yes Yes Yes No Yes (g) in English Yes Yes Yes Yes Yes Yes No No Yes Yes No Yes Yes Yes Yes Yes Yes Yes No Yes Yes 3.1.1.2. Do you provide details on actual changes to all inform ation referred to under paragraph 3.1.2 in a tim ely m anner as soon as available to you? Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes AV their charges? Yes Yes Yes Yes Yes Yes B Yes Yes Yes Yes Yes Yes Yes B Yes Yes Yes B Yes Yes Yes Yes DE NI Ar ticle of Anne x 1 cha pte r 3 of Ga s Re gula tion 7 1 5 / 2 0 0 9 Tr a nspa r e ncy r e quir e m e nt Yes Yes Yes Yes Yes Yes Yes Yes BBL Com pany I nterconnector UK 3 .1 .1 . For m of publica tion: 3.1.1.1. 3 .1 .2 Conte nt of publica tion 3.1.2 a) Do you publish a detailed and com prehensive description of the different services offered and Sw edagas & Svenska Kraftnat Gaslink BGE ( UK) Mutual Energy GTS GRTgaz National Grid ONTRAS GRTgaz Deutschland OGE Terranets BW Thyssengas Jordgas Now ega Fluxys Energinet.DK Yes 3.1.2 b) Do you publish the different types of transportation contracts available for these services? Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes No Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Gastransport Nord Gasunie Deutschland Bayernets10th SG meeting of GRI NW – 23 November 2012
Detailed results – NW region
Transparency m onitoring
Com pliance w ith Chapter 3 , Annex I of Reg. 7 1 5 / 2 0 0 9
Countr y Code BE DK FR GB I E NL SE GB/ NL GB/ B10th SG meeting of GRI NW – 23 November 2012
Detailed results – NW region
Transparency m onitoring
Com pliance w ith Chapter 3 , Annex I of Reg. 7 1 5 / 2 0 0 9
Countr y Code BE DK FR GB I E NL SE GB/ NL GB/ B I f applicable, do you publish the flexibility and tolerance levels included in transportation and other services without separate charge, as well as Yes Yes Yes Yes Yes Yes B Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes NA NA NA Yes any flexibility offered in addition to this and the corresponding charges Yes Yes Yes Yes Yes Yes B Yes Yes Yes No Yes Yes NA Yes Yes Yes Yes NA NA Yes Do you publish a detailed description of the gas system of the transm ission system10th SG meeting of GRI NW – 23 November 2012
Detailed results – NW region
Transparency m onitoring
Com pliance w ith Chapter 3 , Annex I of Reg. 7 1 5 / 2 0 0 9
Countr y Code BE DK FR GB I E NL SE GB/ NL GB/ B 3 .3 I nfor m a tion to be publishe d a t a ll r e le v a nt points a nd the tim e sche dule a ccor ding to which this infor m a tion should be publishe d AV Do you publish at all relevant points the following inform ation for all services and ancillary services provided: (a) the technical capacity for flows in both directions; Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes I s this inform ation published on a num erical basis? Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes I s this inform ation in hourly or daily periods, equal to the sm allest reference period? Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes I s this inform ation and updates published as soon as available to you (“near real tim e”)? Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes No Yes Yes I s this inform ation published for a period of at least 18 m onths ahead? Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Do you publish historical inform ation on the technical capacity for flows in both directions for the past five years on a rolling basis? Yes Yes Yes No Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes No Yes Yes Yes Yes I s inform ation for single final custom ers and for production facilities, that is excluded from the definition of relevant points as described under 3.2 (1)(a) published in aggregate form at at least per balancing10th SG meeting of GRI NW – 23 November 2012
Detailed results – NW region
Transparency m onitoring
Com pliance w ith Chapter 3 , Annex I of Reg. 7 1 5 / 2 0 0 9
Countr y Code BE DK FR GB I E NL SE GB/ NL GB/ B 3 .3 I nfor m a tion to be publishe d a t a ll r e le v a nt points a nd the tim e sche dule a ccor ding to which this infor m a tion should be publishe d AV (c) the nom inations and re-nom inations in both directions; Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes No Yes Yes Yes Yes I s this inform ation published on a num erical basis? Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes No Yes Yes Yes Yes I s this inform ation in hourly or daily periods, equal to the sm allest reference period? Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes NA Yes Yes Yes Yes I s this inform ation and updates published as soon as available to you (“near real tim e”)? Yes Yes Yes Yes Yes Yes B Yes Yes Yes Yes Yes Yes Yes Yes Yes NA Yes Yes Yes Yes Do you publish historical inform ation on the nom inations and re- nom inations in both directions for the past five years on a rolling basis? Yes Yes Yes No Yes Yes B Yes Yes Yes Yes Yes Yes Yes Yes Yes No Yes Yes No Yes (d) the available firm and interruptible capacity in both directions; Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes B Yes Yes Yes B Yes Yes I s this inform ation published on a num erical basis? Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes No Yes Yes I s this inform ation in hourly or daily periods, equal to the sm allest reference period? Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes B Yes No I s this inform ation and updates published as soon as available to you (“near real tim e”)? Yes Yes Yes Yes Yes Yes B Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes B Yes No I s this inform ation published for a period of at least 18 m onths ahead? Yes Yes Yes Yes Yes Yes B Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Do you publish historical inform ation on the available firm and interruptible capacity in both directions for the past five years on a rolling basis? Yes Yes Yes No Yes Yes B Yes Yes Yes Yes Yes Yes Yes Yes Yes No Yes Yes Yes Yes (e) actual physical flows; Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes B Yes Yes Yes Yes Yes Yes I s this inform ation published on a num erical basis? Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes No Yes NA Yes Yes I s this inform ation in hourly or daily periods, equal to the sm allest reference period? Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes I s this inform ation and updates published as soon as available to you (“near real tim e”)? Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes No Yes Yes Do you publish historical inform ation on actual physical flows for the past five years on a rolling basis? Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes No Yes Yes Yes Yes 3.3.1., 3.3.2. and 3.3.3. DE NI Ar ticle of Anne x 1 cha pte r 3 of Ga s Re gula tion 7 1 5 / 2 0 0 9 Tr a nspa r e ncy r e quir e m e nt BBL Com pany I nterconnector UK Sw edagas & Svenska Kraftnat Gaslink BGE ( UK) Mutual Energy GTS GRTgaz National Grid ONTRAS GRTgaz Deutschland OGE Terranets BW Thyssengas Jordgas Now ega Fluxys Energinet.DK Gastransport Nord Gasunie Deutschland Bayernets10th SG meeting of GRI NW – 23 November 2012
Detailed results – NW region
Transparency m onitoring
Com pliance w ith Chapter 3 , Annex I of Reg. 7 1 5 / 2 0 0 9
Countr y Code BE DK FR GB I E NL SE GB/ NL GB/ B 3 .3 I nfor m a tion to be publishe d a t a ll r e le v a nt points a nd the tim e sche dule a ccor ding to which this infor m a tion should be publishe d AV (f) planned and actual interruption of interruptible capacity; Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes B Yes B Yes B Yes Yes I s this inform ation published on a num erical basis? Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes NA Yes NA Yes Yes I s this inform ation in hourly or daily periods, equal to the sm allest reference period? Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes NA Yes NA Yes Yes I s this inform ation and updates published as soon as available to you (“near real tim e”)? Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes NA Yes NA Yes Yes Do you publish historical inform ation on planned and actual interruptions of interruptible capacity for the past five years on a rolling basis? Yes Yes Yes No Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes NA NA NA Yes NA Yes Yes (g) planned and unplanned interruptions to firm services as well as the inform ation on restoration of the firm services (in particular, m aintenance of the system and the likely duration of any interruption due to m aintenance). Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes B NA NA Yes Yes Yes Yes Do you publish planned interruptions at least 42 days in advance? Yes Yes Yes No Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes NA NA NA Yes Yes Yes Yes I s this inform ation and updates published as soon as available to you (“near real tim e”)? Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes NA NA NA Yes Yes Yes Yes Do you publish historical inform ation on planned and unplanned interruptions for the past five years on a rolling basis? Yes Yes Yes No Yes Yes NA Yes Yes Yes Yes Yes Yes Yes NA NA NA P No No Yes Do you publish m easured values of the gross calorific value or the Wobbe index at all relevant points, on a daily basis? Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes No Yes NA Yes Yes Do you publish prelim inary figures at the latest 3 days following the respective gas day? Yes Yes Yes Yes Yes Yes Yes No Yes Yes Yes Yes Yes Yes Yes Yes No Yes No Yes Yes Do you publish final figures within 3 m onths after the end of the respective m onth? Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes No Yes Yes Yes Yes 3.3.1., 3.3.2. and 3.3.3. DE NI Ar ticle of Anne x 1 cha pte r 3 of Ga s Re gula tion 7 1 5 / 2 0 0 9 Tr a nspa r e ncy r e quir e m e nt BBL Com pany I nterconnector UK Sw edagas & Svenska Kraftnat Gaslink BGE ( UK) Mutual Energy GTS GRTgaz National Grid ONTRAS GRTgaz Deutschland OGE Terranets BW Thyssengas Jordgas Now ega Fluxys Energinet.DK Gastransport Nord Gasunie Deutschland 3.3.4. Bayernets10th SG meeting of GRI NW – 23 November 2012
Detailed results – NW region
Transparency m onitoring
Com pliance w ith Chapter 3 , Annex I of Reg. 7 1 5 / 2 0 0 9
Countr y Code BE DK FR GB I E NL SE GB/ NL GB/ B 3 .3 I nfor m a tion to be publishe d a t a ll r e le v a nt points a nd the tim e sche dule a ccor ding to which this infor m a tion should be publishe d AV Do you publish for all relevant points, available capacities, booked and technical capacities, on an annual basis Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes10th SG meeting of GRI NW – 23 November 2012
Detailed results – NW region
Transparency m onitoring
Com pliance w ith Chapter 3 , Annex I of Reg. 7 1 5 / 2 0 0 9
Countr y Code BE DK FR GB I E NL SE GB/ NL GB/ B 3 .4 I nfor m a tion to be publishe d r e ga r ding the tr a nsm ission sy ste m a nd the tim e sche dule a ccor ding to which this infor m a tion should be publishe d Do you publish on a daily basis and updated every day the following specifications re. the aggregated am ounts of capacities offered, and contracted on the secondary m arket (i.e. sold from one network user to another network user), where the inform ation is available to you: (a) interconnection point where the capacity is sold; Yes No NA Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes NA Yes NA NA Yes (b) type of capacity, i.e. entry, exit, firm , interruptible; Yes No NA Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes NA Yes NA NA Yes (c) quantity and duration of the capacity usage rights; Yes No NA Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes NA Yes NA NA Yes (d) type of sale, e.g. transfer or assignm ent; Yes No NA Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes NA Yes NA NA Yes (e) the total num ber of trades/ transfers; Yes No NA Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes NA Yes NA NA Yes (f) any other conditions known to the transm ission system operator as m entioned in 3.3. NA No NA Yes Yes Yes Yes Yes Yes Yes Yes Yes NA NA Yes Yes NA NA NA NA Yes I s this inform ation provided by a third party? Do you publish the following specifications re. harm onised conditions under which capacity transactions (e.g. transfers and assignm ents) will be accepted: (a) a description of standardised products which can be sold on the secondary m arket; Yes Yes NA Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes NA Yes NA Yes Yes (b) lead tim e for the im plem entation/ acceptation/ registration of secondary trades. I n case of delays the reasons have to be published; Yes Yes NA Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes NA Yes NA Yes Yes (c) the notification to the transm ission system operator by the seller10th SG meeting of GRI NW – 23 November 2012
Detailed results – NW region
Transparency m onitoring
Com pliance w ith Chapter 3 , Annex I of Reg. 7 1 5 / 2 0 0 9
Countr y Code BE DK FR GB I E NL SE GB/ NL GB/ B 3 .4 I nfor m a tion to be publishe d r e ga r ding the tr a nsm ission sy ste m a nd the tim e sche dule a ccor ding to which this infor m a tion should be publishe d Regarding the balancing service of your system , do you provide to each network user, for each balancing period, its specific prelim inary im balance volum es and cost data per individual network user, at the latest 1 m onth after the end of the balancing period? Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes NA Do you provide final data of custom ers supplied according to standardised load profiles within 14 m onths later? Yes Yes NA NA Yes NA B Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes NA Yes NA NA Do you respect confidentiality of com m ercially sensitive inform ation while providing this inform ation? Yes Yes NA Yes Yes Yes B Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes NA NA I s this inform ation provided by a third party? Do you offer flexibility services, other than tolerances, for third party access? Yes Yes Yes No Yes Yes Yes Yes NA Yes No Yes Yes NA Yes Yes Yes Yes No No NA I f you do, do you publish daily forecasts on a day-ahead basis of the m axim um am ount of flexibility, the booked level of flexibility and the availability of flexibility for the m arket for the next gas day? Yes NA Yes No Yes Yes B Yes NA Yes No Yes NA NA Yes Yes No NA Yes NA NA Do you also publish ex-post inform ation on the aggregate utilisation