Trends & Demands from TSOs Driving New Investment in High Voltage Laboratories Dan Windmar Background Some TSOs have put as a requirement that type testing of a specific product should be done in one laboratory or under the


  1. Trends & Demands from TSOs Driving New Investment in High Voltage Laboratories Dan Windmar

  2. Background • Some TSOs have put as a requirement that type testing of a specific product should be done in one laboratory or under the surveillance of one laboratory. • Another factor is that the requirements in the standards today are not stringent enough compared to the experience from service. • Also some TSOs want to qualify products thus performing the tests either together with the suppliers or without them

  3. Investments based on increased requirements • Ca 10 years ago an investment was made in a site for long term testing of equipment for UHV • 2011 a new high voltage test hall was inaugurated which primarily function is type testing of HV AC and DC cables • In 2015 further investments were made in more test facilities, also primarily for testing of HV cables

  4. Prequalification testing of DC Cable systems • Testing for four German TSOs • 525 kV DC cable tested at 761 kV DC for one year • Cable should see similar stress as in service • Switching impulses superimposed on DC should be performed on the complete cable system 4

  5. Increased need for cable testing • The test hall is fully equipped in order to be able to test high voltage equipment with system voltages up to 500 kV. The investment consisted of a high voltage hall, 600 kV resonance transformer and a 2 MV, 200 kJ, impulse generator. 5

  6. Requirements on testing in one laboratory • Bending test on cable • Material testing 6

  7. New test site for PQ testing of AC cables • The increased need for cables in the transmission systems pushes the need for further investments in PQ testing 7

  8. Requirements on testing of bushings • Cantilever tests • Increased need for higher and higher AC and DC currents in temperature rise tests 8

  9. Summary • Changing market pushes the need for investments and other measures • It is clear that the development on the market will continue to push further development and investments in new test equipment, test labs and test methods 9

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.