SLIDE 1
Work Completed
- Performed elevation survey of key components of the
WWTP equipment in order to study the hydraulic profile
- f the plant.
- Performed calculations for the sizing of various units and
pipe sizing per flow requirements and loading parameters.
- Reviewed previous permitting and design documents as
well as past and existing permits.
- Conducted meetings with Jennifer McKnight and Karl
Schlielig in order to assess how the plant is currently being operated and what problems they observe from
- perations and managements spectrums.