TROPHY CLUB MUNICIPAL UTILITY DISTRICT WASTEWATER TREATMENT PLANT PROBLEMS & POSSIBLE SOLUTIONS Presented by: 1825 Market Center Blvd Dallas, Texas 75207 Work Completed Performed elevation survey of key components of the WWTP


slide-1
SLIDE 1

TROPHY CLUB MUNICIPAL UTILITY DISTRICT WASTEWATER TREATMENT PLANT PROBLEMS & POSSIBLE SOLUTIONS Presented by: 1825 Market Center Blvd Dallas, Texas 75207

slide-2
SLIDE 2

Work Completed

  • Performed elevation survey of key components of the

WWTP equipment in order to study the hydraulic profile

  • f the plant.
  • Performed calculations for the sizing of various units and

pipe sizing per flow requirements and loading parameters.

  • Reviewed previous permitting and design documents as

well as past and existing permits.

  • Conducted meetings with Jennifer McKnight and Karl

Schlielig in order to assess how the plant is currently being operated and what problems they observe from

  • perations and managements spectrums.
slide-3
SLIDE 3

TCMUD WWTP Original Design vs Current Conditions

Original Design

  • Population* – 10,000
  • BOD – 10mg/l
  • TSS – 15mg/l
  • Raw – 180mg/l
  • Q = 1.75 MGD

Current Conditions

  • Population* – 13,000 -14,000
  • BOD – 5 mg/l
  • TSS – 10mg/l
  • Raw – 200-240mg/l
  • Q = 1.90 MGD

*Town of Trophy Club Only

slide-4
SLIDE 4

Aeration Basins

Aeration Basins Issues

  • Limited Capacity & Number
  • Wall Elevations Too Low
  • Splitter Box Too High
slide-5
SLIDE 5

Tertiary Filters

Filter Issues

  • Limited Hydraulically
  • No Redundancy
slide-6
SLIDE 6

RAS/WAS Pump Station

Pump Issues

  • RAS and WAS Pump Limitations
  • Capacity and Operating Flexibility
slide-7
SLIDE 7

Effluent Lift Station

Effluent Lift Station Issues

  • Insufficient Pump Capacity
  • UV Channel/Weirs Surcharging
slide-8
SLIDE 8

Recommendations

  • Complete detailed Preliminary Engineering

Report (PER) to consider options, sizes, locations and cost estimates:

– Detailed Unit Process Assessment – Submit PER to TCEQ – Construct Third Treatment Basin & Modify Existing Basins – Construct Third Tertiary Filter Basin – Upgrade Pump Stations – RAS/WAS and Effluent – Biosolids/Sludge Operations Enhancements

  • Investigate Funding Options
slide-9
SLIDE 9

Funding Options

TYPE DURATION RATE Open Market 3 months 3.75 – 4.25% TWDBD Development Fund 8 months 4.1% TWDBD Clean Water Supply Revolving Fund 2 years 3.1%

slide-10
SLIDE 10

Questions?