Transportation Policy into the Future CSG Transportation & - - PowerPoint PPT Presentation
Transportation Policy into the Future CSG Transportation & - - PowerPoint PPT Presentation
Nevada Drives Transportation Policy into the Future CSG Transportation & Infrastructure Public Policy Committee Rudy Malfabon, Nevada DOT Nevada Dept. of Transportation 1,827 employees Centralized DOT with 3 Districts
Nevada Dept. of Transportation
- 1,827 employees
- Centralized DOT with 3 Districts
- $955M in expenditures in SFY 2017
- $367M in federal funds in FY 17
- We work with 4 Metropolitan
Planning Organizations (RTC Southern Nevada, Washoe County RTC, Carson Area MPO, and Tahoe MPO
Nevada Firsts
Nevada Success is a Team Effort
- STATE AGENCIES
- REGIONAL AGENCIES
- LOCAL AGENCIES
- PRIVATE INDUSTRY
PARTNERS
Partnerships – Las Vegas TMC
- NDOT facility
- RTC SN maintains Intelligent
Transportation System (ITS) devices and traffic signals through FAST (Freeway and Arterial System of Transportation)
- FAST is co-located with state patrol
(NHP)
- FAST is jointly funded by NDOT, RTC
SN, Clark County and the local cities in southern Nevada
Waycare and FAST
- Early incident identification through this system
was 12 minutes faster on average than the current mode of incident identification
- 90% of incidents have less than 30 minute
response time
- Waycare identified 11% of crashes through in-
vehicle data sources
- RTC incident reporting doubled in October 2017
compared to last year
- Injuries citywide have gone down 7%
- Public outreach grew by 160% with total
engagement of over 1.3 million people in October 2017
I-15 Multi-State Corridor Operations and Management (MCOM)
- Dynamic Mobility Project funded
through a Federal grant
- Caltrans, NDOT, ADOT, UDOT
partnership
- Share real-time corridor information
between states
- Focus on outreach to the freight
community to improve operations of long-haul freight on the I-15 corridor
- Outcome: web-based tool that links up
the traffic operation centers of 4 states
City of Las Vegas Innovation District
City of Las Vegas Innovation District
Navya & Keolis Driverless Shuttle
Genivi
Electric Highway
- NDOT has identified our alternate fuel corridors to FHWA
- Assisting the Governor’s Office of Energy and NV Energy to fill in the
gaps along US 95 Electric Highway
- GOE and NDOT are working with a partner to deploy portable solar-
powered charging stations
Integrated Mobile Observation Project
- Outfit snowplows with GPS,
LiDAR, FLIR and DSRC/5G radios
- Integrate sensors with our
Roadway Weather Information System (RWIS)
- Broadcast locations (AV displays,
NDOT website and travel apps)
- HUD in NDOT snowplow
- Integrate with AV/CV collision
avoidance
Fiber Deployment
- NDOT is installing conduit for future fiber
- ptic
- Used Utah legislation as a model for
Nevada legislation for leasing spare conduit to fiber company
- Working with a company on the USA
Parkway corridor
- USA Parkway serves the Tahoe-Reno
Industrial Center (TRIC)
Tahoe-Reno Industrial Center
- 264 square miles
- More than 140 tenants
including the Tesla Gigafactory, Switch, eBay, Walmart and Zulily.
- Google recently
purchased 1,200 acres.