township of o hara
play

Township of OHara o Second level Third level Stormwater Management - PowerPoint PPT Presentation

C LICK TO EDIT M ASTER TITLE STYLE Click to edit Master text styles Township of OHara o Second level Third level Stormwater Management Fee o Fourth level Council Informational Meeting M ARCH 10, 2020 C LICK TO EDIT M ASTER TITLE STYLE


  1. C LICK TO EDIT M ASTER TITLE STYLE ● Click to edit Master text styles Township of O’Hara o Second level ● Third level Stormwater Management Fee o Fourth level Council Informational Meeting M ARCH 10, 2020

  2. C LICK TO EDIT M ASTER TITLE STYLE S TORMWATER U TILITY U SER F EE ● Click to edit Master text styles ● Background – Why consider a fee? o Second level o Funds for managing the storm water system General Fund based on tax revenue ● Third level o Tax funding no longer financially feasible given the severity of storm o Fourth level water issues and the need to comply with unfunded state and federal permitting mandates o All properties with impervious property benefit from the Township’s stormwater infrastructure with properties that have the most impervious area having the largest impact o The Township is required to maintain stormwater infrastructure which includes compliance with state/federal regulations 2

  3. C LICK TO EDIT M ASTER TITLE STYLE W HAT INITIATED THE NEED FOR THIS USER FEE ? ● Click to edit Master text styles ● The Township is the Permittee (MS4) of the Township Stormwater System, the 2018 MS4 o Second level permit includes provisions which has increased ● Third level annual expenses including but not limited to: o Fourth level o Provisions requiring that the Township reduces the amount of pollutants during storm events and this includes construction of stormwater management facilities during this 5 year cycle (2018-2023) with new requirements anticipated in the next 5 year permit. o Significant anticipated capital costs for PRP implementation required by 2023 o Future permits are anticipated to continue pollutant reduction requirements 3

  4. C LICK TO EDIT M ASTER TITLE STYLE F EE VS T AX ● Click to edit Master text styles ● Establish a Dedicated Stormwater Fund instead of a General Fund o Second level ● A fee is directly relatable to the demands placed on the system. ● Third level o Fourth level A stormwater fee, like other utility fees such as water and sanitary sewer, is based on the impact a user places upon the system ● All property owners who generate stormwater runoff from impervious surfaces pay a fee. This includes tax exempt properties. ● Fee creates equitable assessment for residential and non- residential uses. 4

  5. C LICK TO EDIT M ASTER TITLE STYLE T YPES OF P ROPERTIES ● Click to edit Master text styles ● Single Family Residential o Second level o Parcels with a single individual dwelling unit o Less than one acre in lot area ● Third level o Fourth level ● Large Single Family Residential o Parcels with a single individual dwelling o One acre or greater in size ● Non-Single Family Residential o All developed properties that do not fit Single Family Residential criteria o Commercial, multifamily, industrial, institutional properties ● Vacant Land o Properties with 400 square feet or less of impervious area 5

  6. C LICK TO EDIT M ASTER TITLE STYLE D ETERMINATION OF ERU V ALUE ● Click to edit Master text styles ● ERU – Equivalent Residential Unit o Second level o Measure of impervious ground cover for a typical Single Family Residential Property within the Township ● Third level o Used as fee basis for assessing Non-Single Family Residential o Fourth level Properties o Determined based on measurements of a 100 lot random sample of single family residential lots throughout the Township o Based on analysis of O’Hara Township Parcels – 3,200 sf ERU is recommended 6

  7. C LICK TO EDIT M ASTER TITLE STYLE S UMMARY OF T OWNSHIP P ROPERTIES ● Basis of Fee Assessment ● Click to edit Master text styles o Single Family Residential Properties – 1 ERU o Second level o Large Single Family Residential Properties – Based on actual impervious area, ● Third level rounded to the nearest 0.5 ERU o Fourth level o Non-Single Family Residential Properties – Based on actual impervious area, rounded to the nearest 0.5 ERU Parcel Type Number of Properties Number of ERUs Non Single Family 265 5,884.5 Single Family Residential 3,023 3,023 Large Single Family Residential 294 665 TOTALS 3,582 9,572.5 7

  8. C LICK TO EDIT M ASTER TITLE STYLE E VALUATION OF T OWNSHIP S TORMWATER E XPENSES ● Township expenses were categorized for evaluation, ● Click to edit Master text styles though significant overlap exists between categories. o Second level Each category addresses different aspects of overall MS4 ● Third level Permit Compliance: o Fourth level o Administration o Capital Improvements o Annual O&M o MS4 Permit Compliance ● Administration o Generally includes administrative salary and overhead costs associated with stormwater management. 8

  9. C LICK TO EDIT M ASTER TITLE STYLE E VALUATION OF T OWNSHIP S TORMWATER E XPENSES ● Click to edit Master text styles ● Annual Operation and Maintenance o Second level o Generally includes anticipated costs to improve/replace existing Township infrastructure over its anticipated lifecycle ● Third level ● Capital Improvements o Fourth level o Generally includes anticipated costs associated with capital projects to improve collection, conveyance, detention and/or treatment of stormwater runoff o Funding for projects to address areas which experience flooding during rainfall events ● MS4 Permit Compliance o Generally includes additional required permit compliance tasks not included in previous expense categories: ● SWMP Implementation ● PRP Plan Implementation 9

  10. C LICK TO EDIT M ASTER TITLE STYLE E VALUATION OF T OWNSHIP S TORMWATER E XPENSES ● Township expenses were categorized for evaluation, though ● Click to edit Master text styles significant overlap exists between categories. Each category o Second level addresses different aspects of overall MS4 Permit Compliance : ● Third level o Administration o Capital Improvements o Fourth level o Annual O&M o MS4 Permit Compliance ● Summary of Anticipated Expenses Expense Category Anticipated Annual Expenses Administration $164,554 Annual O&M $254,263 Capital Improvements $320,000 MS4 Permit Compliance $125,000 TOTAL $862,817 10

  11. C LICK TO EDIT M ASTER TITLE STYLE F EE C REDITS ● Click to edit Master text styles ● Properties with functioning PCSM BMPs should receive a credit for reduction of required fees: o Second level o BMPs must have been designed to address on site impervious area. ● Third level Credit should be prorated based on the portion of the site addressed by o Fourth level the BMP o BMPs must be properly maintained such that they continue to operate in accordance with their original design. o Sites with functioning, eligible BMPs may receive up to 50% credit 11

  12. C LICK TO EDIT M ASTER TITLE STYLE D ETERMINATION OF ERU F EE A MOUNT ● Click to edit Master text styles ● Intent of study is to equitably distribute stormwater utility costs among users. o Second level ● Anticipated annual expenditures were calculated based on the ● Third level o Fourth level presence of existing PCSM BMPs and as such determination of the per ERU fee should account for anticipated credits ● Calculations account for properties with known PCSM BMPs that will be eligible for credit ● Accounting for eligible credits the fee should be based on 8,987 ERUs ● $862,817/8,987 ERUs = $96.01/ERU / 12 months = $8.00/ERU/month ● For Implementation: $8.00/ERU/month 12

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.

Recommend


More recommend