SLIDE 1
Three seas initiative 06/06/2019 Szabolcs I. Ferencz 5800 km - - PowerPoint PPT Presentation
Three seas initiative 06/06/2019 Szabolcs I. Ferencz 5800 km - - PowerPoint PPT Presentation
Regional perspectives of the Romanian-Hungarian interconnector Three seas initiative 06/06/2019 Szabolcs I. Ferencz 5800 km pipeline The current network ROHU phase I: 0.75 bcma capacity from 2019.10.01. 1.75 bcma capacity from the
SLIDE 2
SLIDE 3
ROHU phase I:
- 0.75 bcma capacity from 2019.10.01.
- 1.75 bcma capacity from the beginning of 2020
ROHU phase II:
- Open Season deadline prolonged until 2019.10.01.
- 4.4 bcm from 2022.10.01.
SLIDE 4
SLIDE 5
SLIDE 6
SLIDE 7
Świnoujście LNG terminal Black Sea gas project KRK LNG terminal
SLIDE 8
Świnoujście LNG terminal Black Sea gas project KRK LNG terminal
SLIDE 9
Świnoujście LNG terminal Black Sea gas project KRK LNG terminal
SLIDE 10