Three seas initiative 06/06/2019 Szabolcs I. Ferencz 5800 km - PowerPoint PPT Presentation

Regional perspectives of the Romanian-Hungarian interconnector Three seas initiative 06/06/2019 Szabolcs I. Ferencz 5800 km pipeline The current network ROHU phase I: 0.75 bcma capacity from 2019.10.01. 1.75 bcma capacity from the


  1. Regional perspectives of the Romanian-Hungarian interconnector Three seas initiative 06/06/2019 Szabolcs I. Ferencz

  2. 5800 km pipeline The current network

  3. ROHU phase I: • 0.75 bcma capacity from 2019.10.01. • 1.75 bcma capacity from the beginning of 2020 ROHU phase II: • Open Season deadline prolonged until 2019.10.01. • 4.4 bcm from 2022.10.01.

  4. Świnoujście LNG terminal KRK LNG terminal Black Sea gas project

  5. Świnoujście LNG terminal KRK LNG terminal Black Sea gas project

  6. Świnoujście LNG terminal KRK LNG terminal Black Sea gas project

  7. What do we need? Three Seas & new sources! Thank you for your attention! fgsz.hu

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.