Regional perspectives of the Romanian-Hungarian interconnector Three seas initiative 06/06/2019 Szabolcs I. Ferencz 5800 km pipeline The current network ROHU phase I: 0.75 bcma capacity from 2019.10.01. 1.75 bcma capacity from the


slide-1
SLIDE 1

Regional perspectives of the Romanian-Hungarian interconnector

Three seas initiative

06/06/2019 Szabolcs I. Ferencz

slide-2
SLIDE 2

5800 km pipeline

The current network

slide-3
SLIDE 3

ROHU phase I:

  • 0.75 bcma capacity from 2019.10.01.
  • 1.75 bcma capacity from the beginning of 2020

ROHU phase II:

  • Open Season deadline prolonged until 2019.10.01.
  • 4.4 bcm from 2022.10.01.
slide-4
SLIDE 4
slide-5
SLIDE 5
slide-6
SLIDE 6
slide-7
SLIDE 7

Świnoujście LNG terminal Black Sea gas project KRK LNG terminal

slide-8
SLIDE 8

Świnoujście LNG terminal Black Sea gas project KRK LNG terminal

slide-9
SLIDE 9

Świnoujście LNG terminal Black Sea gas project KRK LNG terminal

slide-10
SLIDE 10

fgsz.hu

What do we need?

Three Seas & new sources!

Thank you for your attention!