THEOS DATA TRANSFER VIA TEIN3 : U d Update Report & - - PowerPoint PPT Presentation

theos data transfer via tein3 u d update report
SMART_READER_LITE
LIVE PREVIEW

THEOS DATA TRANSFER VIA TEIN3 : U d Update Report & - - PowerPoint PPT Presentation

THEOS DATA TRANSFER VIA TEIN3 : U d Update Report & Implementation Plan R & I l i Pl Damrongrit Niammuad d.niammuad@eoc.gistda.or.th @ g THEOS Satellite Operation Center, GISTDA Outlines Outlines Background Background


slide-1
SLIDE 1

THEOS DATA TRANSFER VIA TEIN3 : U d R & I l i Pl Update Report & Implementation Plan

Damrongrit Niammuad

d.niammuad@eoc.gistda.or.th @ g THEOS Satellite Operation Center, GISTDA

slide-2
SLIDE 2

Outlines Outlines

Background Background

  • THEOS Polar Station
  • Network Topology

Update Report

  • Open Loop Test Result

I l t ti Pl Implementation Plan

  • Network Connection Plan
  • Close Loop Test Plan
  • Close Loop Test Plan

2 31th Asia-Pacific Advanced Network Meeting, 20-25 February 2011, Hongkong

slide-3
SLIDE 3

Background Background

MOU between GISTDA and DANTE (June,2009) THEOS presentation & cooperation planning (July,2009)

(28th APAN Meeting, Malaysia) ( g y )

Domestic Network Design & Planning with UniNet (2009) MOU between GISTTDA and UniNet (March 2010)

( )

THEOS 1st Year Operation session in 30th APAN meeting &

Test Planning (August, 2010)

Open Loop Test (short distance): Thailand – Malaysia

(October,2010)

Open Loop Test (Long Distance): Thailand – USA

(December,2010)

slide-4
SLIDE 4

THEOS Polar station THEOS Polar station

THEOS

Image Telemetry

Raw Data Storage S-Band Station (SiRacha) X-Band Station (Bangkok) X-Band PolarStation (Kiruna) (SiRacha) Production Programming 20 Mbps 155 Mbps Central Archiving Catalogue Server

Quick Delivery Media/FTP

Service

Ordering/Quotation Order Tracking

155 Mbps

Order Tracking Product Delivery Invoice/Billing Request Consultation

DANTE: TEIN3/GEANT2

User

4

International User (R&D/Universities)

31th Asia-Pacific Advanced Network Meeting, 20-25 February 2011, Hongkong

TEIN3/GEANT2

slide-5
SLIDE 5

Polar Station Data Transfer Polar Station Data Transfer

All Data are transferred for

Acquisition in Sweden

All Data are transferred for

further processing in Thailand.

The polar station is connected The polar station is connected

with SUNET.

GISTDA’s station is connected

Network

GISTDA’s station is connected

with UniNet.

The data volume is around 690

MB to 30 GB image data per one

Replay Production in Thailand

  • rbits (~ 2 orbits/day)

in Thailand

31th Asia-Pacific Advanced Network Meeting, 20-25 February 2011, Hongkong

slide-6
SLIDE 6

THEOS Standard Products: Level 1A: provide 2 meter resolution and 8 bits information depth. Level 2A: provide 15 meter resolution and 8 bits information depth. All 4 bands are delivered as one file (red, green blue, near IR). All 4 bands are delivered as one file (red, green blue, near IR). PAN sharpening: The fusion of image PAN &MS

PAN Level 1A PAN Level 2A PAN sharpening

31th Asia-Pacific Advanced Network Meeting, 20-25 February 2011, Hongkong

slide-7
SLIDE 7

Network Topology: Overall Network Topology: Overall

Thai SSC Kiruna Thai REN

ThaiSarn

SSC Network *Kiruna-Stockholm *Own Investment *Own Investment

SUNET TEIN3

UniNet

NORDUnet Geant2 GISTDA

7 31th Asia-Pacific Advanced Network Meeting, 20-25 February 2011, Hongkong

slide-8
SLIDE 8

Existing Connection from TEIN 3 g

31th Asia-Pacific Advanced Network Meeting, 20-25 February 2011, Hongkong

slide-9
SLIDE 9

Update Report Update Report

Open Loop Test: Short Distance

p p

Bangkok (UniNet) - Kuala Lumpur (Universiti Putra Malaysia)

  • No connection from GISTDA to UniNet available
  • Tested files (THEOS images) was uploaded via internet

( g ) p connection

  • 3 Image files (199 MB, 189 MB, 748MB) = 1.5 GB
  • Using TEIN3 Route with UniNet server
  • Topology: ThaiREN Node – TEIN3 – Singapore Node
slide-10
SLIDE 10

Update Report Update Report

Open Loop Test Report

p p p

Bangkok (UniNet) - Kuala Lumpur (Universiti Putra Malaysia)

  • Destination via TEIN3:

server groupbox.upm.my / ip:202.28.194.8 g p p y / p

  • Time: 13.00 -14.00 Local Time
  • Bandwidth: 20 Mbps

p

  • Upload Time for 1.5 GB data: 4.52 min

(748 MB data using 2-3 min)

slide-11
SLIDE 11

Update Report Update Report

Open Loop Test Report

B k k K l L Bangkok (UniNet) - Kuala Lumpur (Universiti Putra Malaysia)

At l di i d At uploading period to MY server

slide-12
SLIDE 12

Implementation Plan: Implementation Plan:

THEOS Data Transfer

Thailand Shortest distance of each site connection

Ladkrabang to KMITL

(King Mongkut Institute of Technology Ladkrabang) Siracha to KU_SRC campus (Kasetsart university Siracha campus) (Kasetsart university Siracha campus)

Changwattana to KU

(Kasetsart University main campus)

Sweden

N R h d Ed ti N t k No Research and Education Network

from Kiruna Station to the Universities in Kiruna

Solution: Contract 20 Mbps

SSC Network to SSC Data Center, Stockholm SSC Data Center to SUNET

slide-13
SLIDE 13

Changwattana

1 Communication Center Ministry of Interior Development Affair Division

GISTDA

ThaiSarn (NECTEC) KU

Changwattana

1 G THAILAND MONITORING CENTER 1G 1G 1G p Ministry of Defence 1G 1 G CAT MetroLAN MOST phase1 (NECTEC) Internet2 APAN

Ladkrabang

1 G 1 G

Project Information Technology Network Connection for

1G MetroLAN 8 M MOST phase1 RENX 10G Uninet RENX KMITL

Sriracha

KU TEIN3 6 2 2 M GEANT2 2.5G

Co ect o

  • Education

1G BU 1G phase1 Phase 2 SRC

Phase 1: Peer-to-Peer Fiber Optic 20 Mbps leased from CAT Telecom Phase 1: Fiber Optic Connection leased from CAT Telecom ready to be used by Mid of 2011 Phase 2: Fiber Optic Connection invested by GISTDS ready to be used by End of 2011 invested by GISTDS ready to be used by Mid of 2011 ready to be used by End of 2011

slide-14
SLIDE 14

Implementation Plan: Implementation Plan: Data Acquisition Service Contract

between GISTDA & SSC: signed by Feb. 2011 Discussion g y

Sweden Node Testing: March – April ,2011

SSC Network to SSC Data Center Stockholm

In line with Network Installation Testing Procedure

SSC Network to SSC Data Center, Stockholm SSC Data Center to SUNET

  • i

l d i il

Contact Person

Continental Node Testing: April – May,2011 Sweden :SUNET-GEANT2-TEIN3-UniNet:Thailand

Testing Procedure TEIN3 Contact Person Network Availability

Thailand Node Testing: July ,2011

slide-15
SLIDE 15

THEOS I mage Processing Facility @ Ladkrabang :

KMITL NIDA KU KMITNB MUA TU MU_SLY CU SWU RU KMITNB KMUTT

slide-16
SLIDE 16

THEOS Control Station Si Racha : THEOS Control Station Si-Racha :