Outlines Outlines
Background Background
- THEOS Polar Station
- Network Topology
Update Report
- Open Loop Test Result
I l t ti Pl Implementation Plan
- Network Connection Plan
- Close Loop Test Plan
- Close Loop Test Plan
2 31th Asia-Pacific Advanced Network Meeting, 20-25 February 2011, Hongkong
Background Background
MOU between GISTDA and DANTE (June,2009) THEOS presentation & cooperation planning (July,2009)
(28th APAN Meeting, Malaysia) ( g y )
Domestic Network Design & Planning with UniNet (2009) MOU between GISTTDA and UniNet (March 2010)
( )
THEOS 1st Year Operation session in 30th APAN meeting &
Test Planning (August, 2010)
Open Loop Test (short distance): Thailand – Malaysia
(October,2010)
Open Loop Test (Long Distance): Thailand – USA
(December,2010)
THEOS Polar station THEOS Polar station
THEOS
Image Telemetry
Raw Data Storage S-Band Station (SiRacha) X-Band Station (Bangkok) X-Band PolarStation (Kiruna) (SiRacha) Production Programming 20 Mbps 155 Mbps Central Archiving Catalogue Server
Quick Delivery Media/FTP
Service
Ordering/Quotation Order Tracking
155 Mbps
Order Tracking Product Delivery Invoice/Billing Request Consultation
DANTE: TEIN3/GEANT2
User
4
International User (R&D/Universities)
31th Asia-Pacific Advanced Network Meeting, 20-25 February 2011, Hongkong
TEIN3/GEANT2
Polar Station Data Transfer Polar Station Data Transfer
All Data are transferred for
Acquisition in Sweden
All Data are transferred for
further processing in Thailand.
The polar station is connected The polar station is connected
with SUNET.
GISTDA’s station is connected
Network
GISTDA’s station is connected
with UniNet.
The data volume is around 690
MB to 30 GB image data per one
Replay Production in Thailand
- rbits (~ 2 orbits/day)
in Thailand
31th Asia-Pacific Advanced Network Meeting, 20-25 February 2011, Hongkong
THEOS Standard Products: Level 1A: provide 2 meter resolution and 8 bits information depth. Level 2A: provide 15 meter resolution and 8 bits information depth. All 4 bands are delivered as one file (red, green blue, near IR). All 4 bands are delivered as one file (red, green blue, near IR). PAN sharpening: The fusion of image PAN &MS
PAN Level 1A PAN Level 2A PAN sharpening
31th Asia-Pacific Advanced Network Meeting, 20-25 February 2011, Hongkong
Network Topology: Overall Network Topology: Overall
Thai SSC Kiruna Thai REN
ThaiSarn
SSC Network *Kiruna-Stockholm *Own Investment *Own Investment
SUNET TEIN3
UniNet
NORDUnet Geant2 GISTDA
7 31th Asia-Pacific Advanced Network Meeting, 20-25 February 2011, Hongkong
Existing Connection from TEIN 3 g
31th Asia-Pacific Advanced Network Meeting, 20-25 February 2011, Hongkong
Update Report Update Report
Open Loop Test: Short Distance
p p
Bangkok (UniNet) - Kuala Lumpur (Universiti Putra Malaysia)
- No connection from GISTDA to UniNet available
- Tested files (THEOS images) was uploaded via internet
( g ) p connection
- 3 Image files (199 MB, 189 MB, 748MB) = 1.5 GB
- Using TEIN3 Route with UniNet server
- Topology: ThaiREN Node – TEIN3 – Singapore Node
Update Report Update Report
Open Loop Test Report
p p p
Bangkok (UniNet) - Kuala Lumpur (Universiti Putra Malaysia)
- Destination via TEIN3:
server groupbox.upm.my / ip:202.28.194.8 g p p y / p
- Time: 13.00 -14.00 Local Time
- Bandwidth: 20 Mbps
p
- Upload Time for 1.5 GB data: 4.52 min
(748 MB data using 2-3 min)
Update Report Update Report
Open Loop Test Report
B k k K l L Bangkok (UniNet) - Kuala Lumpur (Universiti Putra Malaysia)
At l di i d At uploading period to MY server
Implementation Plan: Implementation Plan:
THEOS Data Transfer
Thailand Shortest distance of each site connection
Ladkrabang to KMITL
(King Mongkut Institute of Technology Ladkrabang) Siracha to KU_SRC campus (Kasetsart university Siracha campus) (Kasetsart university Siracha campus)
Changwattana to KU
(Kasetsart University main campus)
Sweden
N R h d Ed ti N t k No Research and Education Network
from Kiruna Station to the Universities in Kiruna
Solution: Contract 20 Mbps
SSC Network to SSC Data Center, Stockholm SSC Data Center to SUNET
Changwattana
1 Communication Center Ministry of Interior Development Affair Division
GISTDA
ThaiSarn (NECTEC) KU
Changwattana
1 G THAILAND MONITORING CENTER 1G 1G 1G p Ministry of Defence 1G 1 G CAT MetroLAN MOST phase1 (NECTEC) Internet2 APAN
Ladkrabang
1 G 1 G
Project Information Technology Network Connection for
1G MetroLAN 8 M MOST phase1 RENX 10G Uninet RENX KMITL
Sriracha
KU TEIN3 6 2 2 M GEANT2 2.5G
Co ect o
- Education
1G BU 1G phase1 Phase 2 SRC
Phase 1: Peer-to-Peer Fiber Optic 20 Mbps leased from CAT Telecom Phase 1: Fiber Optic Connection leased from CAT Telecom ready to be used by Mid of 2011 Phase 2: Fiber Optic Connection invested by GISTDS ready to be used by End of 2011 invested by GISTDS ready to be used by Mid of 2011 ready to be used by End of 2011
Implementation Plan: Implementation Plan: Data Acquisition Service Contract
between GISTDA & SSC: signed by Feb. 2011 Discussion g y
Sweden Node Testing: March – April ,2011
SSC Network to SSC Data Center Stockholm
In line with Network Installation Testing Procedure
SSC Network to SSC Data Center, Stockholm SSC Data Center to SUNET
- i
l d i il
Contact Person
Continental Node Testing: April – May,2011 Sweden :SUNET-GEANT2-TEIN3-UniNet:Thailand
Testing Procedure TEIN3 Contact Person Network Availability
Thailand Node Testing: July ,2011
THEOS I mage Processing Facility @ Ladkrabang :
KMITL NIDA KU KMITNB MUA TU MU_SLY CU SWU RU KMITNB KMUTT
THEOS Control Station Si Racha : THEOS Control Station Si-Racha :