Relocation of Specialist Rehabilitation Services, Penarth Wellbeing Hub: Vale of Glamorgan Scrutiny Presentation 8th January 2019 THE VISION AND VALUES PENARTH The creation of a wellbeing hub adjacent to the Penarth Leisure Centre will
THE VISION AND VALUES PENARTH
- The creation of a wellbeing hub adjacent to the Penarth
Leisure Centre will support the delivery of health and wellbeing services to the residents within the Eastern Vale Cluster .
- Services will be delivered collaboratively across
- rganisations to promote a social model of care,
focusing on people’s physical, mental and social wellbeing. In terms of key values and principles that are considered essential to the design, development and governance of the site, the Wellbeing Hub@[Penarth] will:-
- Promote ‘prevention’ and ‘wellness’ rather than ‘illness’
- Integrate services with Leisure Centre for mutual
benefit by exposing people who wouldn't normally use leisure centre facilities to new services (Gym / Swimming / classes and community activities)
- Facilitate the delivery of services that are relevant to
the priority physical, mental and social wellbeing needs
- f residents who live within the Cluster
- Support the delivery of care to individuals ‘close to
their home’ , providing individuals and families with better access to health services that do not need to be delivered in a hospital setting
Support Zone Shared Main Entrance & Wellbeing Zone Team Zone Health Zone Redlands Health Zone Bookable Clinical Rooms Support spaces Admin Bookable Group Rooms Staff support Leisure Centre Entrance Facilities Leisure Centre Pool, Gym, Sports hall, Squash Health suite, Fitness studio Outside Space Sub Wait Main Waiting Wc's baby change Playing Fields Main Entrance info
GF FF GF FF Health Zone Support Zone Shared Main Entrance & Wellbeing Zone Team Zone Gross Areas Nett Areas (red dotted accomodated in Leisure centre)
471.32 Gross 795.17 Gross 118.41 Gross 385.00 Gross Consulting Rooms Treatment Rooms (incl Minor Ops) Phlebotomy Specimen Wc
Health Zone
Podiatry Clinic Staff Rest & kitchen Staff Changing Staff Wc's
Support Zone
Reception Office 2 Person
Shared Main Entrance & Wellbeing Zone
Male Wc Female Wc Dis.Wc Wheelchair Parking Adult changing Baby Ch Baby Feeding Seminar Room
Team Zone
Bookable Group Bookable Group Room Room Information Area 766.87 Gross 385.00 Gross 118.41 Gross Entrance & reception Waiting Area Redlands Waiting Area General Wellbeing Zone Store Redlands Admin Area Recourse Rooms Store: General Wc's Dis.Wc Cleaners room Disposal Hold Bookable Clinincal Rooms Support Spaces Consulting / examination Rooms Treatment Rooms Enhanced Treatment Interview Rooms Dis.Wc Store Clean Utility Dirty Utility Resus Bay Store : general Cleaner's Room Disposal Hold Office Redlands - Admin Office (5 Person) Staff Support Wc's Dis.Wc Central Fm Space IT Hub
FF FF
Cleaner's Disposal hold 471.32 total Gross 118.41 Gross 250.2 sub total Gross 297.8 sub total Gross 73.0 sub total Gross 161.6 sub total Gross 12.05 sub total Gross 385.00 Gross 471.32 total Gross
Block Areas & Schedule of Accommodation
Wellbeing Zone: Entrance & Reception Area
- Group/Community rooms
third sector social/activity groups
- Information Centre
Health Zone
- Clinical space for GP’s
(relocation of Redlands Surgery)
- Flexible bookable clinical
spaces, Podiatry & treatment T eam Zone
- Office accommodation
- Meeting rooms
- Seminar Rooms
- District nurse / health
visitor base
Park Area ) Cogan Nursery school Development site Car Park ) Cogan Train Station ) Supermarket To Town Centre Site Entrance
Site Context Aerial View
Health Zone Redlands Sub wait Clincal Bookable spaces support Courtyard Playing fields
Sports ports hall
Pool
Spa pa
field sports changing
Lift main plant nt wet et cha changing ng dry cha changing ng Squa uash h cour urts Dance nce Store tore Store tore
fire access Main Entrance to Leisure Centre Waiting
Male Wc Female Wc
Fe. Door fm plant Leisure centre reception
Adult Change dis wc Office Office ref Admin Office General Office Manager disposal
Block Plan - Ground Floor Plan
Railway Fe. stair Embankment
Staff
info existing bookable room
W ellbeing reception
Seating area Lobby interview (poss cafe)
Fe. stair Fe. stair
Baby ch Baby F first aid cleaner's
Block Plan - First Floor Plan
Spin n stu tudio Gp Gp Refer erral l gym ym main gym
Dance studio (bookable room) flat roof (possible location for new Pv's) sports hall below flat roof allow for future expansion (with Pv's) pool hall below Gp Referral
- ffice
Support Zone Main Core Courtyard Fe. stair Team Zone Fe. stair Group room Supp
Changing Room
33 m²
Changing Room
27 m²
Ground Person
11 m²
Plant room
19 m²
Referee
9 m²
Lift
5 m²
Lift motor
7 m²
Cleaner's Store
13 m²
Beauty
7 m²
Store
6 m²
Changing (Dry)
95 m²
Changing (W et)
96 m²
W ellbeing W aiting
39 m²
Admin Office
24 m²
General office
36 m²
First Aid
8 m² 6 m²
Cleaner's Cupboard Male W c
17 m²
Female W c
17 m²
Manager
10 m²
Leisure Centre reception
31 m²
Office
11 m²
Office
11 m²
W c independant W heelchair
5 m²
Leisure Centre Staff room
18 m²
Shower room
9 m²
Shower room
9 m²
Changing room
30 m²
Changing room
26 m²
W ellbeing Hub Reception
27 m²
display / retail area Seating Area
Possible Cafe / Retail area Automatic Sliding Doors Automatic Sliding Doors
Draught Lobby Disposal Hold
10 m²
Interview Room
8 m²
Baby Change
5 m²
Infant Feeding
7 m²
Adult Changing
12 m²
4001 3000
Stair and Lift Access New Lobby with automatic sliding doors New Combined Leisure & W ellbeing Centre Signage
2
Proposed Integrated Lobby - Ground Floor Plan
Flexible/multi- functional/ shared spaces
- Flexible and multi-
functional facilities which can change to meet different requirements, with future adaptability for re-designed service models.
- Flexible opening times
to support delivery
- f services, group
education, social activities
- etc. at times convenient
to service users. Security
- f staff, service users
and the building to be incorporated.
- Active waiting area,
where service users can find out about activities and classes on
- ffer or access health
and wellbeing advice, while waiting for their appointment.
Proposed Integrated Lobby - Ground Floor View
Waiting Room Lift Main Stair Field sports Changing Wellbeing Centre Staff room Leisure centre Reception Wellbeing Reception Wellbeing Offices Shared Sanitary General Offices Admin Offices First Aid
- Integration between
the outdoor and indoor spaces to encourage innovative use of space for healthy and social activities.
- Ability to facilitate
community/third sector groups, e.g. themed events, social prescribing, 1:1 advice etc.
- Plenty of equipment
storage to enable rooms to be adapted to support the delivery of services who regularly provide sessional clinics.
- Wellbeing co-ordinators/
social prescribing team to work across the integrated facility .
Pool Area Wellbeing Centre Health Zone Bookable Clinical Shared Shared Lobby Leisure Centre Reception Main Entrance Sports Hall Wellbeing Reception Health Zone Redlands
Promotes collaboration across organisation
- Facilitates integration and
collaborative working across the leisure centre and wellbeing hub, e.g. wellbeing co-ordinators/ social prescribing team to work across the integrated facility .
- Collaboration with Gp
referral Services in Leisure centre
Ground Floor Context - Axonometric
Team Zone Support
External Envelope Concept
- Brickwork plinth / lower
level to match existing
- Powder coated rainscreen
cladding system
- U Values: 30-40%
improvement over Building regulations
- Air Permeability of 3.0
- Low Maintenance
- Green Guide Rated A
Project Completion 07/06/2021
13/01/2020 10/02/2020 4w 10/02/2020 07/06/2021 70w 3/09/2018 18/02/2019 24w
Summary Programme
03/09/2018 07/06/2021
Project Start
03/09/2018 18/02/2019 01/04/2019 6w 01/04/2019 02/12/2019 35w 02/12/2019 13/01/2020 6w OBC Start Completion
Key Date Programme
OBC OBC FBC FBC Mobilisation Construction Development Approvals Development Approvals Duration
Construction & Site Set up
- The entrance to the Wellbeing
Hub will be via the existing Leisure centre, requiring the remodelling of the area to create waiting, reception and
- ffice areas, all during a live
environment.
- T
- preserve the smooth running
- f the centre, and mitigate any
disruption to their operations, BAM will formulate a plan and construction methodology that safely separates the construction activities from the
- public. This will be in the
format of solid hoarding lines, noise reduction measures (including out of hours working), and temporary MEP service provision.
- BAM will liaise closely with the
Centre to ensure the sequencing
- f the works are both effective