the forensic recovery of phr following 9 11 at wtc
play

The Forensic Recovery of PHR Following 9/ 11 at WTC July 2007 - PowerPoint PPT Presentation

OFFICE CHIEF MEDICAL EXAMINER THE CITY OF NEW YORK The Forensic Recovery of PHR Following 9/ 11 at WTC July 2007 Barbara A. Butcher MPH Director, Forensic Investigations PROPERTY OF OCME, NYC NO PART OF THIS PRESENTATION MAY BE REPRODUCED


  1. OFFICE CHIEF MEDICAL EXAMINER THE CITY OF NEW YORK The Forensic Recovery of PHR Following 9/ 11 at WTC July 2007 Barbara A. Butcher MPH Director, Forensic Investigations

  2. PROPERTY OF OCME, NYC NO PART OF THIS PRESENTATION MAY BE REPRODUCED WITHOUT EXPRESS PERMISSION OF THE AGENCY. WTC PHR Recovery OFFICE CHIEF MEDICAL EXAMINER THE CITY OF NEW YORK

  3. Background • Initial finds on rooftop at 130 Liberty St. (Deutsche Bank) in April 2006 • Remains were located on October 18, 2006 in an abandoned Con Edison manhole beneath the Haul Road. • The next day Mayor Bloomberg asked for recommendations on any other areas that needed to be searched. The Lower Manhattan Construction Command Center (LMCCC) and Department of Design and Construction (DDC) submitted a report on October 27. – The Report recommended a plan for a comprehensive search of areas within and in the vicinity of the WTC site. – That search is under way. We estimate that it will take years to complete. The current cost estimate is $32 million. WTC PHR Recovery OFFICE CHIEF MEDICAL EXAMINER THE CITY OF NEW YORK

  4. Search Area WTC PHR Recovery OFFICE CHIEF MEDICAL EXAMINER THE CITY OF NEW YORK

  5. A Three-Part Search Plan 1. Searches within the WTC Site • Subterranean Structures beneath the Haul Road • Excavation of the Haul Road • Excavation of the 140 Liberty Street Parcel (site of the St. Nicholas Greek Orthodox Church) • Excavation of portions of West St. 2. Searches of Subterranean Structures in the Vicinity of the WTC Site • Con Edison, Verizon and the NYC DEP will empty material from over 600 manholes for sifting by OCME 3. Searches of Building Interiors and Rooftops • 130 Liberty Street (Deutsche Bank) • Fiterman Hall • 130 Cedar Street • Rooftop of 55 Church Street (Millennium Hotel) • Rooftop of 1 Liberty Plaza WTC PHR Recovery OFFICE CHIEF MEDICAL EXAMINER THE CITY OF NEW YORK

  6. OCME TEAM • Medicolegal Investigators • Forensic Anthropologists • Medical Examiners • Forensic Biology • Contract Employees WTC PHR Recovery OFFICE CHIEF MEDICAL EXAMINER THE CITY OF NEW YORK

  7. Deutsche Bank • Location: 130 Liberty St • 40 stories tall • Built in 1974 • Previously owned by Bankers Trust • “Deutsche Bank” 1999-04 • 9/11 Insurance Settlement: $ 140 mil • Sold to LMDC for $ 90 mil • Deconstruction cost estimated at $220 mil WTC PHR Recovery OFFICE CHIEF MEDICAL EXAMINER THE CITY OF NEW YORK

  8. Liberty Street Parcel (B-Grids) • Exploratory Trench • Excavation (March 1, 2007-Present) WTC PHR Recovery OFFICE CHIEF MEDICAL EXAMINER THE CITY OF NEW YORK

  9. Sifting Operations at 11 Water Street, Brooklyn • Material collected from the WTC site and subterranean structures is sifted by hand at 11 Water Street. • At 11 Water Street, only trained specialists (forensic anthropologists, archeologists, and investigators) sift the material. • To date, the 11 Water Street facility has sifted approximately cubic yards of material. WTC PHR Recovery OFFICE CHIEF MEDICAL EXAMINER THE CITY OF NEW YORK

  10. AUGER AUGER 20 yd CONTAINERS NYPD Mechanical PPE FIT TEST Equipment Room CAGE CAGE A A CAGE U U G G E E R R Hopper BENCH Wire Shelf C Wire Shelf Wire Shelf O PAILS PAILS C BENCH BENCH N T H A C U I O Barrier Curtain N T Barrier Curtain Clear Plastic Clear Plastic E N Platform E BENCH RAMP R V E C O Eye Wash Y Shower Shower First Aid Station N E Metal Double Sink T Container R A I Construction Locker Room N Wire Shelf E BENCH R Clear Plastic Clear Plastic Barrier Curtain Barrier Curtain WTC PHR Recovery Loading Dock Garage Bay Hopper OFFICE CHIEF MEDICAL EXAMINER THE CITY OF NEW YORK Carole Meyers NYC OCME

  11. Subterranean Structures Search Area WTC PHR Recovery OFFICE CHIEF MEDICAL EXAMINER THE CITY OF NEW YORK

  12. WTC PHR Recovery THE CITY OF NEW YORK CONED Tracking System OFFICE CHIEF MEDICAL EXAMINER

  13. Hazm at Operation • Contaminants: WTC Dust? – Asbestos – Heavy Metals: Mercury, Cadmium – Mold spores • Personal Protective Equipment – Hard hat – Full face mask w/ PAPR – Full Tyvek Suit w. paper undergarment – Cooling vest – Rubber Boots & gloves – Requires full decon of equipment, personnel & PHR • Heat & Humidity – Medical team on site, strict rotation & safety rules WTC PHR Recovery OFFICE CHIEF MEDICAL EXAMINER THE CITY OF NEW YORK

  14. Regulators • EPA • NYS DEP • NYC DEP • NYS DOL • OSHA • PESH • NYCOSH WTC PHR Recovery OFFICE CHIEF MEDICAL EXAMINER THE CITY OF NEW YORK

  15. Sum m ary as of July 1st 20 0 7 • Material Excavated to Date: 13,312 cubic yards • Hand-sifted to Date: 4751 cubic yards • Total PHR recovered: 1,458 WTC PHR Recovery OFFICE CHIEF MEDICAL EXAMINER THE CITY OF NEW YORK

  16. RECOVERY and IDENTIFICATION: 9/ 11/ 0 1 To 7/ 1/ 0 7 • 21, 421 Human remains recovered • 10,976 remains identified • 2750 people reported missing • 1611 identified • The work will continue until all have been found WTC PHR Recovery OFFICE CHIEF MEDICAL EXAMINER THE CITY OF NEW YORK

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.

Recommend


More recommend