LCM-2 0 0 7 Task Sharing on Environmental Product Declaration Setup in Business to Business Relations Jens Buchgeister, Udo Jeske, Martina Klingele Karlsruhe Institute of Technology - Forschungszentrum Karlsruhe Department of Technology


  1. LCM-2 0 0 7 Task Sharing on Environmental Product Declaration Setup in Business to Business Relations Jens Buchgeister, Udo Jeske, Martina Klingele Karlsruhe Institute of Technology - Forschungszentrum Karlsruhe Department of Technology Induced Material Flows 2007-08-27/29 Zürich KIT –The Collaboration of 1 | Jens Buchgeister, Udo Jeske, Martina Klingele ITC-ZTS | B2B-EPD | 2007-08-27 Forschungszentrum Karlsruhe GmbH and University Karlsruhe (TU)

  2. Planners as designers of buildings KIT –The Collaboration of 2 | Jens Buchgeister, Udo Jeske, Martina Klingele ITC-ZTS | B2B-EPD | 2007-08-27 Forschungszentrum Karlsruhe GmbH and University Karlsruhe (TU)

  3. Planners as designers of buildings – buildings as products Designers • decide on use-cases and performances of products • select appropriate components and materials for that KIT –The Collaboration of 3 | Jens Buchgeister, Udo Jeske, Martina Klingele ITC-ZTS | B2B-EPD | 2007-08-27 Forschungszentrum Karlsruhe GmbH and University Karlsruhe (TU)

  4. Designer‘s Working Area Construction Processes Use Processes KIT –The Collaboration of 4 | Jens Buchgeister, Udo Jeske, Martina Klingele ITC-ZTS | B2B-EPD | 2007-08-27 Forschungszentrum Karlsruhe GmbH and University Karlsruhe (TU)

  5. Sophisticated Designer’s Additional Tasks Designers • decide on use-cases and performances of products • select appropiate components and materials for that Sophisticated Designers • would look to their design from a life cycle perspective • would transfer performances into functional units • would optimize environmental performances using LCA KIT –The Collaboration of 5 | Jens Buchgeister, Udo Jeske, Martina Klingele ITC-ZTS | B2B-EPD | 2007-08-27 Forschungszentrum Karlsruhe GmbH and University Karlsruhe (TU)

  6. Designer‘s LCA Competence designer‘s working area Construction Use EOL- Production Trade Processes Processes Processes Construction Phase Use Phase Maintenance and Modernisation Phase Demolition Phase Σ Construction Σ Trade Σ Production Total Processes Σ EOL- Σ Use LC-Inventory Processes Processes KIT –The Collaboration of 6 | Jens Buchgeister, Udo Jeske, Martina Klingele ITC-ZTS | B2B-EPD | 2007-08-27 Forschungszentrum Karlsruhe GmbH and University Karlsruhe (TU)

  7. Designer‘s LCA Competence designer‘s working area Process Construction Use Processes Processes Models T3: Transport T5: Transport+ T1: Production T2: Transport + + Installation Recycling/ of Material Storage of Material Disposal P1: Resources P5: Recycling Construction P4: Environmen Phase of P2 P3 A ir Pitched Roof P8: Pitched Roof W a te r S o il P9 T6 T7 T9 P8: Pitched Roof P19: Recy cl ing P7 Use Phase (e.g. Heating) T10 P6 P8: Pitched Roof P11 T12 T 13 T11 P20:Recycli ng Maintenance Phase (after pitched roof T15 P12 P13 lifetime) P15 T16 T17 T 18 P8: Pitched Roof P21:Recycling Final Building T19 Demolition Phase P16 P17 P18 KIT –The Collaboration of 7 | Jens Buchgeister, Udo Jeske, Martina Klingele ITC-ZTS | B2B-EPD | 2007-08-27 Forschungszentrum Karlsruhe GmbH and University Karlsruhe (TU)

  8. EPDs in Support of Designers Building Principle Imaging a Building service Principle provider who asks building for a planner „Building EPD“ KIT –The Collaboration of 8 | Jens Buchgeister, Udo Jeske, Martina Klingele ITC-ZTS | B2B-EPD | 2007-08-27 Forschungszentrum Karlsruhe GmbH and University Karlsruhe (TU)

  9. Example KIT –The Collaboration of 9 | Jens Buchgeister, Udo Jeske, Martina Klingele ITC-ZTS | B2B-EPD | 2007-08-27 Forschungszentrum Karlsruhe GmbH and University Karlsruhe (TU)

  10. Choice of Reference Scenario in an existing building Example: Additional insulation of a pitched roof Trade Pitched Roof Production End of Life construc tion process use process T3: Transport T5: Transport+ T1: Production T2: Transport + + Installation Recycling/ of Material Storage of Material Disposal P1: Resources P5: Recycling Construction P4: Environmen Phase of P2 P3 A ir Pitched Roof P8: Pitched Roof W a te r S o il P9 T6 T7 T9 P8: Pitched Roof P19: Recy cl ing P7 Use Phase (e.g. Heating) T10 P6 P8: Pitched Roof P11 T12 T 13 T11 P20:Recycli ng Maintenance Phase (after pitched roof T15 P12 P13 lifetime) P15 T16 T17 T 18 P8: Pitched Roof P21:Recycling Final Building T19 Demolition Phase P16 P17 P18 KIT –The Collaboration of 10 | Jens Buchgeister, Udo Jeske, Martina Klingele ITC-ZTS | B2B-EPD | 2007-08-27 Forschungszentrum Karlsruhe GmbH and University Karlsruhe (TU)

  11. Choice of Reference Scenario Example: Additional Insulation of a Pitched Roof in an existing building Indicators on demand of building principle • Cumulated Energy Demand (CED), Saved Energy • Global Warming Potential (GWP), Saved Climate Change Impact • Costs, Saved Costs KIT –The Collaboration of 11 | Jens Buchgeister, Udo Jeske, Martina Klingele ITC-ZTS | B2B-EPD | 2007-08-27 Forschungszentrum Karlsruhe GmbH and University Karlsruhe (TU)

  12. Choice of Reference Scenario Example: Additional Insulation of a Pitched Roof in an existing building Functional Unit is one m² of additionally insulated pitched roof area of • a building with a certain number of floors and loft and • a specific roof construction • specific thermal properties • with insulation installed between rafters, and no cuts of the inserted panels parallel to the rafters. KIT –The Collaboration of 12 | Jens Buchgeister, Udo Jeske, Martina Klingele ITC-ZTS | B2B-EPD | 2007-08-27 Forschungszentrum Karlsruhe GmbH and University Karlsruhe (TU)

  13. EPDs in Support of Designers EPD business manufacturer X trade manufacturer Y KIT –The Collaboration of 13 | Jens Buchgeister, Udo Jeske, Martina Klingele ITC-ZTS | B2B-EPD | 2007-08-27 Forschungszentrum Karlsruhe GmbH and University Karlsruhe (TU)

  14. Look to Designer‘s Support in Different Countries EPD – Programmes to Support Designers • France • Germany KIT –The Collaboration of 14 | Jens Buchgeister, Udo Jeske, Martina Klingele ITC-ZTS | B2B-EPD | 2007-08-27 Forschungszentrum Karlsruhe GmbH and University Karlsruhe (TU)

  15. Functional EPD Coverage Unit, Mineral Insulation [MJ/a*m²] Example: AFNOR-EPD, France p : Resources Construction Phase P5: Recycling P4: Environment P2 P3 A ir P8: Pitched Roof W a te r S o il P9 Use Phase T9 P8: Pitched Roof Maintenance and P15 Modernisation Phase T16 T17 T 18 P8: Pitched Roof P21:Recycling Demolition Phase T19 P16 P17 P18 Σ Construction Σ EOL- Σ Production LC-Inventory Processes Processes Σ Use Σ Transport Processes KIT –The Collaboration of 15 | Jens Buchgeister, Udo Jeske, Martina Klingele ITC-ZTS | B2B-EPD | 2007-08-27 Forschungszentrum Karlsruhe GmbH and University Karlsruhe (TU)

  16. EPD Coverage Declared Mineral Insulation Example: AUB-EPD, Germany Unit, [MJ/kg] : Resources Construction Phase Use Phase Maintenance and Modernisation Phase Demolition Phase Σ Construction Σ Trade Σ Production Total Processes Σ EOL- Σ Use LC-Inventory Processes Processes KIT –The Collaboration of 16 | Jens Buchgeister, Udo Jeske, Martina Klingele ITC-ZTS | B2B-EPD | 2007-08-27 Forschungszentrum Karlsruhe GmbH and University Karlsruhe (TU)

  17. Declared Unit Rockwool Germany 2003 (product without lamination) CED [MJ/kg] EPD-Value: CED = 13 MJ/kg rho [kg/m³] RW Klemmrock AUB-EPD: Pitched Roof, 040 d=[m] Germany Production Trade Installation Use EoL Total CED Insulation RW 72,80 6,66 1,27 - 0,21 80,94 [MJ/(m in ²)] Material per m in ² Klemmrock 126,0/120 CED Total Material in RW - - * - 84,99 Pitched Roof per m pr ² [MJ/(m pr ²)] Klemmrock RW Klemmrock and Lifetime 80,94 040 Germany Production Trade Installation Use EoL Total 3 m², d=0,2 m GWP Insulation RW [kg CO2- 6,50 7,06 0,46 0,09 - 0,02 28-37 kg/m³ ? Material per m in ² Klemmrock Eq./(m in ²)] 126,0/120 GWP Total Material in RW [kg CO2- 7,41 - - * - Pitched Roof per m pr ² bau-umwelt.com Klemmrock Eq./(m pr ²)] and Life Time 7,06 Germany Production Trade Installation Use EoL Total rho = 28 kg/m³ Additional Insulation RW [kg CO2- 10,00 13,87 - 0,83* - 3,04 Material Costs per m in ² Klemmrock Eq./(m in ²)] *only direct installation labour costs KIT –The Collaboration of 17 | Jens Buchgeister, Udo Jeske, Martina Klingele ITC-ZTS | B2B-EPD | 2007-08-27 Forschungszentrum Karlsruhe GmbH and University Karlsruhe (TU)

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.