Comfort Station 06/27/2016

Scale 1” = 40’ Existing Site Plan

BRONX RIVER STARLIGHT PARK T PA STARLIGHT PAR

N

Trees to be relocated Comfort Station Proposed Boundary Trees to be relocated

slide-2
SLIDE 2

STARLIGHT PARK

Comfort Station 06/27/2016

Scale 1/16” = 1’ Proposed Site Plan - Approved Preliminary Review N

Relocated tree

I-895

BRONX RIVER STARLIGHT PARK T PA STARLIGHT PAR

e

slide-3
SLIDE 3

STARLIGHT PARK

Comfort Station 06/27/2016

Scale 1” = 40’ Proposed Site Plan - Final Review

BRONX RIVER STARLIGHT PARK T PA STARLIGHT PAR

N

Relocated tree Revision L4- New Tree Revision L1-Path Reconfi guration Revision L3-Bicycle Rack Revision L2-Concrete Paved Area Limits of work on Asphalt Path

slide-4
SLIDE 4

STARLIGHT PARK

Comfort Station 06/27/2016

Ground Floor Plan - Approved Preliminary Plan Scale: 1/8” = 1’ N

1’ 5’ 10’ 20’

MECH UTILITY

GARAGE

METAL STORAGE SHELVING

3' - 6"

6' - 11"

4' - 6" 4' - 6"

ELECT GAS

R 2 '

  • 6

"

9' - 7" 9' - 7"

STORAGE AREA

OFFICE

25' - 0" 46' - 0"

WOMEN MEN

WH R 2

  • 6

" R 2

  • 6

" R 2

  • 6

" ' ' '

slide-5
SLIDE 5

STARLIGHT PARK

Comfort Station 06/27/2016

Ground Floor Plan-Final Review Scale: 1/8” = 1’ N

1’ 5’ 10’ 20’

Revision L3 - Bicycle Rack Revision L2 - Concrete Paving Revision B10 - Open Downspouts Revision B4 - Outswing Door Revision B5 - Perforated Screen Revision B3 - Flush Door Sidelights Revision B9 - Restroom Graphics

slide-6
SLIDE 6

STARLIGHT PARK

Comfort Station 06/27/2016

ZINC SCUPPER SKYLIGHT GLAZED BRICK VENEER ZINC SCUPPER ZINC TILE ROOFING

.

SKYLIGHT

9' - 6" 24' - 9" 10' - 9" 22' - 7"

GLAZED BRICK VENEER ZINC TILE ROOFING ELEV AT FIELD = 8’ ELEV AT CS = 12’ ELEV AT FIELD = 8’ ELEV AT CS = 12’

MEN m5 WOMEN wom5

INSULATED GARAGE DOOR

.

SKYLIGHT BULLETIN BOARD SKYLIGHT FIXED GLAZING W/ PERFORATED ZINC SCREEN

9' - 6" 22' - 7"

ZINC TILE ROOFING GLAZED BRICK VENEER GLAZED BRICK VENEER ZINC TILE ROOFING

SOUTH ELEVATION EAST ELEVATION NORTH ELEVATION WEST ELEVATION NOTE: MIN EAVE HEIGHT NOT BELOW 9’-0” TO PREVENT CLIMBING ON ROOF

Building Elevations - Approved Preliminary Elevations Scale: 1/8” = 1’

slide-7
SLIDE 7

STARLIGHT PARK

Comfort Station 06/27/2016

G ALVALUME T ILE RO O FING

Building Elevations - Final Review Scale: 1/8” = 1’

SOUTH ELEVATION EAST ELEVATION NORTH ELEVATION WEST ELEVATION NOTE: MIN EAVE HEIGHT NOT BELOW 9’-0” TO PREVENT CLIMBING ON ROOF

Revision B9 - Graphic Representation Revision B6-Zinc/Alum Alloy Roof Revision B8 - Display board Revision B2 - Mechanical Louver Revision B5 - Perforated Screen Revision B6-Zinc/Alum Alloy Roof Revision B11 - Brick Vents Revision B11-Brick Vents Revision B7 - Steel Scupper Revision B11-Brick Vents Revision B4- Door Swing Revision B8 - Display board Revision B3 - Flush Panels

slide-8
SLIDE 8

STARLIGHT PARK

Comfort Station 06/27/2016

Revision B2 - Mechanical Louver Revision B6 - Zinc/Alum Alloy Roof Revision B7 - Steel Scupper Revision B1 - Skylight Revision B8 - Display Board Revision L3 - Concrete Paving Revision L2 - Bike Rack