STARLIGHT PARK
Comfort Station 06/27/2016
Scale 1” = 40’ Existing Site Plan
BRONX RIVER STARLIGHT PARK T PA STARLIGHT PAR
N
Trees to be relocated Comfort Station Proposed Boundary Trees to be relocated
STARLIGHT PAR STARLIGHT PARK T PA BRONX RIVER STARLIGHT PARK - - PowerPoint PPT Presentation
Trees to be relocated Trees to be relocated Comfort Station Proposed Boundary STARLIGHT PAR STARLIGHT PARK T PA BRONX RIVER STARLIGHT PARK Scale 1 = 40 Existing Site Plan N Comfort Station 06/27/2016 STARLIGHT PAR STARLIGHT PARK
STARLIGHT PARK
Comfort Station 06/27/2016
Scale 1” = 40’ Existing Site Plan
BRONX RIVER STARLIGHT PARK T PA STARLIGHT PAR
N
Trees to be relocated Comfort Station Proposed Boundary Trees to be relocated
STARLIGHT PARK
Comfort Station 06/27/2016
Scale 1/16” = 1’ Proposed Site Plan - Approved Preliminary Review N
Relocated tree
BRONX RIVER STARLIGHT PARK T PA STARLIGHT PAR
e
STARLIGHT PARK
Comfort Station 06/27/2016
Scale 1” = 40’ Proposed Site Plan - Final Review
BRONX RIVER STARLIGHT PARK T PA STARLIGHT PAR
N
Relocated tree Revision L4- New Tree Revision L1-Path Reconfi guration Revision L3-Bicycle Rack Revision L2-Concrete Paved Area Limits of work on Asphalt Path
STARLIGHT PARK
Comfort Station 06/27/2016
Ground Floor Plan - Approved Preliminary Plan Scale: 1/8” = 1’ N
1’ 5’ 10’ 20’
MECH UTILITY
GARAGE
METAL STORAGE SHELVING3' - 6"
6' - 11"
4' - 6" 4' - 6"
ELECT GASR 2 '
"
9' - 7" 9' - 7"
STORAGE AREA
OFFICE
25' - 0" 46' - 0"
WOMEN MEN
WH R 2
" R 2
" R 2
" ' ' '
STARLIGHT PARK
Comfort Station 06/27/2016
Ground Floor Plan-Final Review Scale: 1/8” = 1’ N
1’ 5’ 10’ 20’
Revision L3 - Bicycle Rack Revision L2 - Concrete Paving Revision B10 - Open Downspouts Revision B4 - Outswing Door Revision B5 - Perforated Screen Revision B3 - Flush Door Sidelights Revision B9 - Restroom Graphics
STARLIGHT PARK
Comfort Station 06/27/2016
ZINC SCUPPER SKYLIGHT GLAZED BRICK VENEER ZINC SCUPPER ZINC TILE ROOFING
.
SKYLIGHT
9' - 6" 24' - 9" 10' - 9" 22' - 7"
GLAZED BRICK VENEER ZINC TILE ROOFING ELEV AT FIELD = 8’ ELEV AT CS = 12’ ELEV AT FIELD = 8’ ELEV AT CS = 12’
MEN m5 WOMEN wom5INSULATED GARAGE DOOR
.
SKYLIGHT BULLETIN BOARD SKYLIGHT FIXED GLAZING W/ PERFORATED ZINC SCREEN
9' - 6" 22' - 7"
ZINC TILE ROOFING GLAZED BRICK VENEER GLAZED BRICK VENEER ZINC TILE ROOFING
SOUTH ELEVATION EAST ELEVATION NORTH ELEVATION WEST ELEVATION NOTE: MIN EAVE HEIGHT NOT BELOW 9’-0” TO PREVENT CLIMBING ON ROOF
Building Elevations - Approved Preliminary Elevations Scale: 1/8” = 1’
STARLIGHT PARK
Comfort Station 06/27/2016
G ALVALUME T ILE RO O FINGBuilding Elevations - Final Review Scale: 1/8” = 1’
SOUTH ELEVATION EAST ELEVATION NORTH ELEVATION WEST ELEVATION NOTE: MIN EAVE HEIGHT NOT BELOW 9’-0” TO PREVENT CLIMBING ON ROOF
Revision B9 - Graphic Representation Revision B6-Zinc/Alum Alloy Roof Revision B8 - Display board Revision B2 - Mechanical Louver Revision B5 - Perforated Screen Revision B6-Zinc/Alum Alloy Roof Revision B11 - Brick Vents Revision B11-Brick Vents Revision B7 - Steel Scupper Revision B11-Brick Vents Revision B4- Door Swing Revision B8 - Display board Revision B3 - Flush Panels
STARLIGHT PARK
Comfort Station 06/27/2016
Revision B2 - Mechanical Louver Revision B6 - Zinc/Alum Alloy Roof Revision B7 - Steel Scupper Revision B1 - Skylight Revision B8 - Display Board Revision L3 - Concrete Paving Revision L2 - Bike Rack