South Gate Storm Drainage Project

Open House Agenda – April 25, 2006

Introduction Presentation Information Stations

Presented by: Presented by: Sponsored by: Sponsored by:

slide-2
SLIDE 2

General Questions and Concerns Submitted After 1st Public Meeting Sept 22, 2005:

Time frame of project Flooding associated with private systems Low spots along street Why project is necessary

Project Area

South Gate Boulevard from 35th Street to Highway 2

South Gate Blvd. Project

slide-3
SLIDE 3

Time Frame: Summer 2006 Reported Problem Areas

Blues Bike Shop Manzitto Construction/Day Care Parking lot at 33rd and Pioneers Low spot on South Gate between Daniel Road and Pioneers

Why Project is Necessary

South Gate Blvd. Project

slide-4
SLIDE 4

Proposed Project Elements:

New Storm Sewer New Inlets New Overland Flow Path

Options Considered

Sidewalk to Curb Area In-Street (selected)

South Gate Blvd. Project

slide-5
SLIDE 5

Proposed Project Elements:

New Storm Sewer provides additional capacity for runoff along South Gate and Pioneers

South Gate Blvd. Project

slide-6
SLIDE 6

Addition of Overland Flow Path

Overland Flow Path provides

  • utlet for extreme events that exceed

system capacity

South Gate Blvd. Project

slide-7
SLIDE 7

Project Phasing

South Gate Blvd. Project

slide-8
SLIDE 8

South Gate Blvd. Project

Project Phasing

300’ 300’ 300’

slide-9
SLIDE 9

Information Stations Questions and Comments

Written Comment Sheets

South Gate Blvd. Project

Storm Sewer System Outlet at Highway 2

(Taken April 2005)