South Fork Kings GSA GSP Update SFKGSA Workshop Lemoore, CA August 15, 2019 Topics GSP Update Chapter 6: Projects and Management Actions Schedule for Public Review Draft Implementation Update Monitoring Network ASR


slide-1
SLIDE 1

South Fork Kings GSA GSP Update

SFKGSA Workshop Lemoore, CA August 15, 2019

slide-2
SLIDE 2

Topics

  • GSP Update

– Chapter 6: Projects and Management Actions – Schedule for Public Review Draft

  • Implementation Update

– Monitoring Network – ASR Pilot Test – Data Management System

  • Summary of North Fork Kings Draft GSP
slide-3
SLIDE 3

GSP Chpt. 6 : Projects

  • Above-Ground Surface Storage

– Surface storage of flood flows

  • Intentional Recharge Basin

– Groundwater recharge of flood flows

  • On Farm Flooding

– Recharge on existing farm with flood flow

  • Aquifer Storage and Recovery

– ASR utilizing flood flow

  • Conveyance Facilities Modifications

– Divert or bank flood flows

slide-4
SLIDE 4

GSP Chpt. 6: Management Actions

  • Policies to Expedite Projects
  • Outreach and Education
  • Pumping Fees

– Exceedance pumping beyond allocation

  • Develop Groundwater Allocation

– Groundwater allocation per acre – Groundwater markets

  • New Development

– Prove sustainable water supply – New well construction

slide-5
SLIDE 5

GSP Chpt. 6: Management Actions

  • Monitoring and Reporting

– Report extraction, water level and water quality – Well meters – Flood flows

slide-6
SLIDE 6
  • Chpt. 6: Proposed SFK Projects
  • Supply Enhancement – 22,000 AF/yr

– ASR Wells – 13,000 AF/yr – Surface Storage – 2,000 AF/yr – Mid-Kings Recharge Basin – 7,000 AF/yr

  • Demand Reduction – 23,000 AF/yr

– GW Measurement and Reporting – 1,500 AF/yr – SW Delivery Improvements – 5,000 AF/yr – On-Farm Efficiencies – 2,500 AF/yr – Conservation/Reuse – 1,000 AF/yr – Fallowing Program – 13,000 AF/yr

slide-7
SLIDE 7

GSP Public Review Schedule

  • 90-day notice of public hearing 9/3
  • Public workshop and outreach
  • Public hearing 12/3
  • 1+ months to address comments
  • SFK Board approval 1/16
  • DWR is required to establish a GSP public

comment period of no less than 60 days

  • A GSP that is determined to be incomplete may be

revised and resubmitted to DWR within 180 days from the date DWR issues the assessment

slide-8
SLIDE 8

Implementation Update

  • SFKGSA Plan Implementation

– Monitoring Network – ASR Pilot Test – Data Management System

slide-9
SLIDE 9

Monitoring Network

  • Identified APNs and landowners
  • Some cases need separate agreements with

landowner and well owner

  • Utilize Board & TAG members to reach out to

landowners

  • Bring each agreement to Board for approval
slide-10
SLIDE 10

ASR Pilot Test

  • Identified test location &

surrounding wells

  • Met with Regulatory agencies
  • n requirements
  • Submitted USEPA Injection

well permit

  • Preparing Workplan for

approval and CEQA exemption

– Will include a pumping test & water quality data

AST Pilot Test Well Location (B-Zone) Lemoore Canal

  • S. Fork Kings

Halls Corner Hwy 41

slide-11
SLIDE 11

Data Management System - SFK

  • Entered updated data
  • On-going discussions

– Where is data stored – What data will be stored – Coordinate between SFK and Tulare Lake Subasin