SNGC Presentation SPANISH ELECTRICAL SYSTEM BREAKDOWN OF TOTAL - - PowerPoint PPT Presentation
SNGC Presentation SPANISH ELECTRICAL SYSTEM BREAKDOWN OF TOTAL - - PowerPoint PPT Presentation
SNGC Presentation SPANISH ELECTRICAL SYSTEM BREAKDOWN OF TOTAL ELECTRICITY GENERATION IN SPAIN (%) NUCLEAR SOLAR WIND COMBINED CYCLE COAL HYDRO OTHERS COGENERATION, BIOMASS, 2 SPANISH ELECTRICAL SYSTEM NUCLEAR ENERGY FIGURES IN
BREAKDOWN OF TOTAL ELECTRICITY GENERATION IN SPAIN (%)
NUCLEAR WIND COAL HYDRO OTHERS COGENERATION, BIOMASS, … COMBINED CYCLE SOLAR
SPANISH ELECTRICAL SYSTEM
2
NUCLEAR ENERGY FIGURES IN SPAIN
NUCLEAR POWER PLANTS ELECTRICITY GENERATION SPANISH TOTAL ELECTRICITY GENERATION NUCLEAR CAPACITY VS TOTAL CAPACITY SPANISH TOTAL ELECTRICITY CAPACITY NUCLEAR POWER PLANTS ELECTRICITY CAPACITY NUCLEAR GENERATION VS TOTAL GENERATION (%) OPERATION FACTOR LOAD FACTOR
SPANISH ELECTRICAL SYSTEM
3
22 %
SPANISH NUCLEAR INDUSTRY
4
SPANISH NUCLEAR POWER PLANTS
“Different technology origin and reactors type”
Plant name Supplier Output (MWe) Operation since Phase
- J. Cabrera
PWR-W 160 1968 1st
- Sta. Mª Garoña
BWR-GE 466 1971 1st Vandellós 1 GCR 400 1972 1st Almaraz 1 PWR-W 981 1981 2nd Almaraz 2 PWR-W 988 1983 2nd Ascó I PWR-W 1032 1983 2nd Cofrentes BWR-GE 1092 1984 2nd Ascó II PWR-W 1027 1985 2nd Vandellós 2 PWR-W 1087 1987 3rd Trillo PWR-KW 1067 1988 3rd
Trillo Asco I & II Vandellós 2
PORTUGAL
Vandellós 1
FRANCE
Almaraz 1 & 2 Cofrentes Santa Mª de Garoña
- J. Cabrera
Trillo
The Spanish nuclear program started in 1960. First plant in
- peration was in 1968
5
SPANISH NUCLEAR INDUSTRY DEVELOPMENT
First Stage: Decade of the 1960´s
- Construction of:
- José Cabrera NPP
- Santa María de Garoña NPP
- Vandellós I NPP
- “Turn-key” construction projects with participation of Spanish engineering,
construction and assembly companies, and electrical equipment manufacturers
- High level qualification employment created
- Technological development for the general industrial improvement
6
Second Stage: Decade of the 1970´s
- Construction of:
- Almaraz NPP
- Ascó NPP
- Cofrentes NPP
- Contracting by components with participation
- f Spanish engineering and equipment suppliers.
SPANISH NUCLEAR INDUSTRY DEVELOPMENT
7
Third Stage: decade of the 1980´s
- Construction of:
- Vandellós II NPP
- Trillo I NPP
- Spanish nuclear industry consolidation
- Total supply of:
- Major components
- Nuclear fuel
- Specialized services: training and in-service inspection
SPANISH NUCLEAR INDUSTRY DEVELOPMENT
8
1st PHASE 2nd PHASE 3rd PHASE Date
Late 60´s 3 reactors Mid 70´s 5 reactors Early 80´s 2 reactors
Localization Content
45% 75% 85%
Main Equipment
25% 50% 90%
Engineering
70% 80% 90%
Construction
75% 100% 100%
Spanish suppliers reached technical maturity back in the 80’s
LOCALIZATION OF SPANISH NPPS AT CONSTRUCTION
9
TECHNOLOGY EVOLUTION
- 1st. STAGE
- 2nd. STAGE
- 3rd. STAGE
Since the early 90’s
10
Turn key projects Local construction & detailed design Main components manufactured abroad NSSS Basic design from the OEM Local design for basic and detailed engineering NPPs design & manufacturing in Spain ENSA, ENUSA, Ringo and Tecnatom heavily involved SNGC companies are strong competitors in the international nuclear market with projects in more than 35 countries worldwide. Services and equipment supplier
SNGC
www.sngc.es
11
SNGC MEMBER LOCATIONS
Juzbado (ENUSA) Madrid (TECNATOM) Zaragoza (RINGO) Maliaño (ENSA) 12
SNGC HISTORY
- 2006, Alliance between
- ENSA
- ENUSA
- TECNATOM
- March 2008, RINGO VÁLVULAS joins the team
- July 2008. Consortium Kick-off. JV set up, focusing on Chinese market/companies
- May 2010. Extension to other countries, (Spanish Nuclear Group for
Cooperation) mainly:
- India
- Latin America
- South Africa
- MENA (Middle east North Africa)
- Turkey
13
SNGC MAIN ACTIVITIES
- Commercial promotion of members
- Marketing and coordination efforts
- Participation in exhibitions and congresses
- Specific seminar coordination: fuel; new build, …
- Development of alliances and MOUs
- New Market research and development
- Early detection of opportunities
- Intergovernmental coordination
- Press releases and newsletter editions
- Research of financing and governmental export credits
14
Institutional Framework On Nuclear Energy in Spain
SNGC COMPANIES PLAY A LEADING ROLE IN THE SPANISH NUCLEAR INDUSTRY”
Nuclear Safety Council Nuclear Safety Council
GOVERNMENT GOVERNMENT PARLIAMENT PARLIAMENT
ENUSA ENUSA ENSA ENSA
UTILITIES UTILITIES
TECNATOM TECNATOM RINGO RINGO
INDUSTRY INDUSTRY
15
ENSA ENUSA TECNATOM RINGO
- Large primary components
(Reactor pressure vessel, steam generators, internals)
- Spent fuel casks; fuel
racks; auxiliary equipment; heat exchangers, etc…
- Site and fuel services
including maintenance, casks & racks activities / management
- Dismantling and
decommissioning projects
- Licensing and V&V of new
reactors
- Training and development of
centralized training schools
- Supply and licensing of
Control Rooms
- Development of ISI
equipment and testing systems
- Support Center for
- peration, emergencies,
severe accidents and maintenance
- Valve manufacturer, leader
in the Nuclear market, designing and manufacturing Control, Gate, Globe Check, Butterfly Diaphragm and ball valves, in all Nuclear classes.
- Ringo is qualified according
to all the international standards with special mention to ASME III qualification N and NPT stamp holder and RCC-M certification.
- Supply of enriched
uranium
- Fabrication of nuclear fuel
reloads and first cores.
- Fuel design, Core design
and operation monitoring
- Reload licensing and
safety analysis
- Fuel inspection and repair
equipment and services
- Spent fuel management.
- Logistic of nuclear and
radioactive transport.
SNGC MEMBERS
16
TECHNOLOGY TRANSFER & LOCALIZATION CAPABILITIES
TECNATOM
- Pre-service & In-service inspection and testing engineering
- Qualification and Dedication Engineering of Safety Class components
- Development and supply of control rooms and simulators
- Training Management of Licensed personnel & non licensed/ plant staff
- Plant life Management and Plant life Extension programs
ENUSA
- Advanced fuel design and manufacturing
- Fuel manufacturing and inspection technology and equipment
- On-site fuel handling, inspection and repair
ENSA
- Steam Generators, Reactor Pressure Vessels and Internals manufacturing
- Spent Fuel Racks and Casks and Fresh Fuel Casks manufacturing
- NPP repair and maintenance services and procedures
- NPP waste management equipment supply and techniques and procedures
- Design, manufacturing, supply and installation of heat exchangers
RINGO VALVULAS
- Nuclear Safety related Valves manufacturing
- Spare parts and valves services
17
ENSA ENUSA TECNATOM RINGO
- Design engineering
√ √ √ √
- NSSS components, spent fuel casks and racks
√ √
- Licensing
√ √ √ √
- Construction and start-up
√ √
- Nuclear fuel cycle
√
- Pre-Service and In-Service inspection and testing
√ √
- Control room and simulator
√
- NPP operation support
√ √ √
- Outage services
√ √ √
- NPP Maintenance
√ √ √ √
- Valves components
√
- Spare part management
√ √
- Nuclear waste and decommissioning
√ √
- New reactors
√ √ √ √
SNGC MEMBERS COMBINED CAPABILITIES
“We offer a wide range of products and services”
18
SNGC MAIN NUCLEAR PROJECTS
EXPORT TO 35 COUNTRIES: USA, China, France, Finland, Germany, Sweden, South Africa, Mexico, Brazil, Argentina, Russia, etc. MAIN: PROJECTS: Steam Generators replacement in Spain: Engineering, Fabrication, Erection Power uprate at Laguna Verde NPP (Mexico) Reactor Vessel head replacement at Angra (Brazil) More than 100 Steams Generators deliveries to USA, France, China, Spain Control Rooms and Simulators supply in China, Argentina, Brazil, Mexico Joint venture company in China for Inspection Services Supply of Nuclear Fuel to France, Belgium, Germany, Sweden, Finland, etc.. Spent fuel transport and storage casks for Spain, USA, China, etc. Life extension in several countries. Valve supply to different NPPs: Argentina, Mexico, Spain, China, Russia, etc.
19
NUCLEAR CONTRACTS AWARDED IN CHINA TO SNGC COMPANIES
TECNATOM Joint Venture CITEC: PSI/ISI CN Ling Ao, Ningde, Hongyanghe, Yangjiang, Fangchesnggan, Taishan Control rooms for CN Fuqing, Fangjianshan and Hainan - CNNC NPIC Electric penetrations for European NPPs Control room Back-up panels for Yanjiang 5&6 - CGN Training of plan operator and supervisors of Sanmen and Haiyang – CNNC and SPIC Back up panels for Fuqing 5&6 - CNNC ENSA Steam Generators - Qinshan II 1-4 NPP - CNNC Design, licensing and manufacturing of Spent fuel racks - Ling Ao 3&4 NPP - CGN Spent fuel transport cask - Daya Bay NPP - CGN Steam generators - Hainan NPP - CNNC Heat exchangers - Taishan NPP - CGN Steam generators - Sanmen NPP-CNNC Spent fuel transport cask - URC-CGN Boric Acid Columns - Taishan NPP -CGN Auxiliary equipment for casks Steam Generators electro polishing RINGO Different valves - Qinshan 1&2 - CNNC Spare parts for valves - CNEIC-CNNC ENUSA Fuel rods ultrasonic inspection equipment - CJNF-CNNC (Yibin factory) SICOM-COR fuel inspection equipment – SNPI-CGN Eddy current fuel inspection equipment – CJNF-CNNC (Yibin factory) 20
COMBINED WORKFORCE
More than 2,000 nuclear professionals
100 200 300 400 500 ENUSA ENSA TECNATOM RINGO
University Degree Specialists Administrative Personnel
100 200 300 400 500 ENUSA ENSA TECNATOM RINGO
University Degree Specialists Administrative Personnel
21
WORLDWIDE EXPERIENCE & NPPs DIVERSITY
- References in more than 35 countries
- Covering all current reactor technologies BWR, CANDU, PWR, VVER, …
- Proven participation on design and construction of parts for new reactors ABWR,
EPR, AP-1000, HTR, etc… with qualified staff and according to different national standards
- Equipment & Component as well as services supplier
22
NEW REACTORS (IN RED) WHERE SNGC MEMBERS ARE PARTICIPATING
CHINA & OTHER ASIAN COUNTRIES
CPR: 20 under construction + 14 under development CNP600: 2 under construction AP1000: 4 under construction EPR: 2 under construction
MIDDLE EAST & SOUTH AFRICA
APWR: 2 under construction. APWR: 2 under development VVER: 4 under development. ATMEA: 1 under development
BRAZIL
PWR: 1 under construction New reactors: 4 under development
ARGENTINA
PHWR: 1 under construction PWR: 1 under development CANDU 1: under DEVELOPMENT CAREM: 1 under construction USA & CENTRAL AMERICA
AP1000 : 4 under construction + 6 under development ESBWR: 4 under development ABWR: 2 under development OTROS: 1 under construction and 1 under development
EUROPE
EPR : 2 under construction & 4 under development VVER: 10 under construction CANDU: 2 under development ABWR: 6 under development ITER & JHR: 2 under construction
WORLDWIDE PRESENCE OF SNGC MEMBERS AT NEW NUCLEAR PROJECTS
23
KEY ARGUMENTS TO COLLABORATE WITH SNGC
Long experience and wide range of combined capabilities with Products & services covering:
- NSSS
- Fuel
- Main Components
Independence from main Original Equipment Manufacturers Innovative technologies and modern facilities Quality and continuous improvement approach International focus with knowledge of standards and culture of many countries Customer oriented and flexible case by case approach Capable/oriented for technology transfer Synergies through integration of products and services
24
Thank you for your attention ! For any further information:
www.sngc.es
- Eduardo Aymerich, Managing Director
eduardo@sngc.es
- Amy Hu, Marketing Manager
amyhu@sngc.es
25