Silver Lake Reservoir Complex Master Plan Discussion of Consultant - - PDF document

silver lake reservoir complex master plan
SMART_READER_LITE
LIVE PREVIEW

Silver Lake Reservoir Complex Master Plan Discussion of Consultant - - PDF document

Welcome bureau of engineering City of Los Angeles 5/2/2018 Silver Lake Reservoir Complex Master Plan Discussion of Consultant Hiring Process COMMUNITY OPEN HOUSE FRIENDSHIP AUDITORIUM 3201 RIVERSIDE DRIVE MAY 1, 2018 Page 1 Council


slide-1
SLIDE 1

5/2/2018 1

bureau of engineering

City of Los Angeles

Silver Lake Reservoir Complex Master Plan

Discussion of Consultant Hiring Process

MAY 1, 2018 COMMUNITY OPEN HOUSE FRIENDSHIP AUDITORIUM 3201 RIVERSIDE DRIVE Page 1

Welcome

  • Council District 4

David E. Ryu (Councilmember) Rachel Fox Nikki Ezhari

  • Council District 13

Mitch O’Farrell (Councilmember) Christine Peters Mary Rodriguez

Page 2

slide-2
SLIDE 2

5/2/2018 2

Project Team Bureau of Engineering (BOE)

  • Deborah Weintraub, AIA, LEEDAP

Chief Deputy City Engineer

  • Cyril Charles, P.E.

Project Manager

  • Armen Dermenjian
  • Asst. Project Manager
  • Mary Nemick

Director of Communications

In coordination with Los Angeles Dept. of Water and Power (LADWP)

Page 3

Agenda

  • Background
  • Process for Hiring Consultant

for Master Plan

  • Project Overview
  • Project Schedule

Page 4

slide-3
SLIDE 3

5/2/2018 3

Background

  • Memorandum of Agreement

(MOA) was approved by LADWP Board in January 2018

  • MOA was approved by Board of

Public Works in March 2018

  • MOA was approved by City

Council on March 27, 2018 Council File (CF No. 08-3420-S1)

Page 5

Project Introduction

  • Introduction
  • Objectives
  • LADWP Facilities
  • LADWP Scheduled and Planned

Projects

  • Project Description

Page 6

slide-4
SLIDE 4

5/2/2018 4

Introduction

  • Silver Lake and Ivanhoe Reservoirs
  • Engineered by William Mulholland

and completed in 1908

  • Located on an approximately 127

acre site

  • Both reservoirs are decommissioned

and replaced with a new covered water storage facility north of Griffith Park

Page 7

Project Objectives

  • Update from Year 2000 Master Plan
  • Guide Future Public Uses and Future

Physical and Operational Changes

  • Stakeholder and Community Input
  • Maintain LADWP Access

Page 8

slide-5
SLIDE 5

5/2/2018 5

Page 9

LADWP Facilities and Scheduled Projects LADWP Facilities

  • Approximately 81 acres of

reservoir surface (64%) and 46 acres of land area (36%)

  • Approximately 13 acres of the

land space is restricted for LADWP facilities and infrastructure

Page 10

slide-6
SLIDE 6

5/2/2018 6

LADWP Facilities and Scheduled Projects

LADWP Scheduled and Planned Projects

  • Pollock Well #3 Groundwater Supply

Project

  • Gate Well Modifications
  • Silver Lake Stormwater Capture Project
  • Aeration and Recirculation Systems Project

Page 11

LADWP Facilities and Scheduled Projects

LADWP Scheduled and Planned Projects

  • Modular Offices for LADWP
  • Reservoir Re-characterization Permit with

the Los Angeles Regional Water Quality Control Board

  • Silver Lake Reservoir Walkway

(COMPLETED Spring 2018)

  • Ivanhoe Reservoir Walkway

Page 12

slide-7
SLIDE 7

5/2/2018 7

Project Description

  • Current Publicly Accessible Areas
  • Areas to Be Considered for Expanded

Public Access and New Uses

  • Natural Resources
  • Water Level in Reservoirs

Page 13

Project Description

  • Water Sources
  • Reservoir Edge Condition
  • Potential Support Facilities
  • Public Activities on the SLRC Site
  • Envision Guidelines

Page 14

slide-8
SLIDE 8

5/2/2018 8

Project Schedule

2018 2019 2020

Task Start Date End Date

J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D

Memorandum of Agreement Approved Mar-18 Mar-18 Develop Project Description and Scope of Work Mar-18 May-18 Select Master Plan Consultant Jun-18 Oct-18 Issue Notice to Proceed to Selected Consultant Oct-18 Oct-18 Draft Master Plan Oct-18 Oct-19 Prepare and Submit Final Master Plan Oct-19 May-20 Master Plan Approval May-20 Nov-20 Page 15

Master Plan Consultant Selection Process

  • Prepare and Issue Request for

Proposals

  • Interview and Short-List Firms
  • Short-Listed Firms to Present to

the Community (Fall 2018)

  • Select Highest Rated Firm
  • Award Contract
  • Start Master Plan Design Process

Page 16

slide-9
SLIDE 9

5/2/2018 9

http://eng.lacity.org/silverlake_reservoirs

Page 17

Comment Cards

Page 18

slide-10
SLIDE 10

5/2/2018 10

Comment Cards

Page 19

moving forward

  • Project Description Available for

comments on May 2, 2018

  • Project Description Available at:

eng.lacity.org/silverlake_reservoirs

  • Comment Period Closes on May 22,

2018

  • City Council MOA approval (CF No. 08-3420-S1) available at:

https://cityclerk.lacity.org/lacityclerkconnect/index.cfm

Page 20

slide-11
SLIDE 11

5/2/2018 11

THANK YOU!

Page 21