SLIDE 11 11
Jason Jason McFad McFadden en
University Park
Cons nstru tructio tion Manag Management
Pennsylvania
$22 $22,700 ,700 Tota Total $8,900
Material
$13,800
Labor Total Description
De Designe signed S System Co stem Cost Su st Summar mmary
$22 $22,700 ,700 Tota Total $8,900
Material
$13,800
Labor Total Description
De Designe signed S System Co stem Cost Su st Summar mmary
$13 $13,900 ,900 Tota Total $11,500
Material
$2,400
Labor Total Description
Alternati ernative System C ve System Cost Summ st Summary ary
$13 $13,900 ,900 Tota Total $11,500
Material
$2,400
Labor Total Description
Alternati ernative System C ve System Cost Summ st Summary ary
Designed System vs. Pr Designed System vs. Prop
Designed S signed System stem Cost Summary Cost Summary
($8,800) ($8,800)
Jason Jason McFad McFadden en
University Park
Cons nstru tructio tion Manag Management
Pennsylvania
Designed System vs. Pr Designed System vs. Prop
Designed S signed System stem Pr Project Impacts
Decrease in coordination with other trades for electrical branch conduits installed through main concourse per original design. Ease of electrical system maintenance during
Decrease in amount of conduit and wire needed (labor savings). Less voltage drop experienced on branch circuits. Ease of expansion. Cost savings of $8,800. Disadvantages Advantages
Pro Propos
ed Alte ternati rnative Sys e System em Des Design gn
Decrease in coordination with other trades for electrical branch conduits installed through main concourse per original design. Ease of electrical system maintenance during
Decrease in amount of conduit and wire needed (labor savings). Less voltage drop experienced on branch circuits. Ease of expansion. Cost savings of $8,800. Disadvantages Advantages
Pro Propos
ed Alte ternati rnative Sys e System em Des Design gn