School Board Presentation 2013/2014
School Board Presentation 2013/2014 2012/2013 School Year 1,059,252 - - PowerPoint PPT Presentation
School Board Presentation 2013/2014 2012/2013 School Year 1,059,252 - - PowerPoint PPT Presentation
School Board Presentation 2013/2014 2012/2013 School Year 1,059,252 miles traveled for the year 5852 Miles traveled each day Here to Anchorage, AK 4,308 miles Here to Key West, FL 1,312 miles X 4 and back to Myrtle Beach Bus
2012/2013 School Year 1,059,252 miles traveled for the year 5852 Miles traveled each day
▪ Here to Anchorage, AK 4,308 miles ▪ Here to Key West, FL 1,312 miles X 4 and back to Myrtle Beach
Bus stops: 648,704 per year 3,584 per day 40 different schools transported to 7 district 17 non‐public 11 special needs 5 Amish 63 total drivers 47 Contracted 15 District
Field trips
196
Sports trips
282
Transported students
every day Monday thru Friday except for 15 days
Diesel Fuel
106,316 Gallons $307,253
Gasoline
36,157 Gallons $92,562
162,000.00 164,000.00 166,000.00 168,000.00 170,000.00 172,000.00 174,000.00 176,000.00 178,000.00 2008‐09 2009‐10 2010‐11 2011‐12 2012‐13
Total Gallons Transportation
Expenditures $2,924,406 Revenue (State Transportation Reimbursement) $1,475,936 Board Share $1,448,471 Total number of students transported 4185 Net cost per student $346.11 Net cost per student per mile $2.02
1,000,000 1,500,000 2,000,000 2,500,000 3,000,000 3,500,000 8/9 9/10 10/11 11/12 12/13
Total Student Transportation Services Total Reimbursement from State Board Share for Transportation
52.6% 44.4% 49.1% 48.7% 49.5%
40.0% 42.0% 44.0% 46.0% 48.0% 50.0% 52.0% 54.0%
8/9 9/10 10/11 11/12 12/13
Board Share for Transportation %
353.72 287.12 328.36 328.18 346.11
200.00 220.00 240.00 260.00 280.00 300.00 320.00 340.00 360.00 380.00
8/9 9/10 10/11 11/12 12/13
Board Net share: Transportation cost per student
What information is needed to generate revenue from
state reimbursement
LEA owned and contracted service
▪ Age of vehicle ▪ Number of miles with students and number of miles without students on the bus ▪ Number of students riding the bus ▪ Number of days a bus transports
Contracted service with parent Number of public students transported Number of n0n‐public students transported Number of students transported because of hazardous
walking conditions
Enrollment 12‐13 Transporation Expense Exp Per Student Rank Cost per Student Transporation Revenue Revenue Per ADM Net Cost Per Student Rank Net Cost Sq Miles Cost per Student per Sq mile Rank cost p/s per sq mile Students "per Sq mile" Rev as % of Expenditure Rank Rev as % of Exp NL 2351 1,841,825.32 783.42 2 1,219,108.58 518.55 264.87 15 143.6 1.84 22 16 66.2% 1
SOL 3738 2,924,406.09 782.35 3 1,558,498.12 416.93 365.41 4 180.7 2.02 21 21 53.3% 4
PM 5194 2,870,346.57 552.63 12 1,267,023.29 243.94 308.69 9 110 2.81 20 47 44.1% 15 ELANCO 3162 2,311,116.34 730.90 6 1,239,449.60 391.98 338.92 7 95 3.57 19 33 53.6% 3 C‐L 4624 2,578,731.07 557.68 11 1,350,856.38 292.14 265.54 14 70 3.79 18 66 52.4% 7 ELCO 2429 1,655,633.90 681.61 7 903,762.70 372.07 309.54 8 75 4.13 17 32 54.6% 2 PAL 3375 1,195,600.16 354.25 20 584,659.14 173.23 181.02 21 40 4.53 16 84 48.9% 11 ETOWN 3914 2,198,146.79 561.61 10 1,101,169.38 281.34 280.27 12 61 4.59 15 64 50.1% 10 MC 2879 2,119,559.90 736.21 5 902,942.70 313.63 422.58 3 77.8 5.43 14 37 42.6% 18 EPHR 4184 1,923,693.56 459.77 16 839,028.24 200.53 259.24 16 45 5.76 13 93 43.6% 17 PV 1674 1,853,983.98 1,107.52 1 986,528.85 589.32 518.19 2 88 5.89 12 19 53.2% 5 WAR 4486 1,963,275.76 437.65 17 862,063.37 192.17 245.48 17 41 5.99 11 109 43.9% 16 CV 4281 2,139,684.29 499.81 14 654,616.63 152.91 346.90 5 56.8 6.11 10 75 30.6% 21 COC 3238 2,078,092.16 641.78 8 1,087,003.14 335.70 306.08 10 50 6.12 9 65 52.3% 8 L‐S 3133 1,325,747.48 423.16 18 605,793.82 193.36 229.80 19 36.2 6.35 8 87 45.7% 12 A‐C 1486 729,517.92 490.93 15 333,333.82 224.32 266.61 13 39.5 6.75 7 38 45.7% 13 DON 2876 1,710,197.51 594.64 9 897,982.18 312.23 282.41 11 35 8.07 6 82 52.5% 6 HEMP 6800 5,186,444.14 762.71 4 1,638,323.20 240.93 521.78 1 44 11.86 5 155 31.6% 20 MT 5854 3,145,407.62 537.31 13 1,133,370.49 193.61 343.70 6 23.4 14.69 4 250 36.0% 19 S D OF LANC 11200 4,094,606.32 365.59 19 1,829,201.90 163.32 202.27 20 11 18.39 3 1018 44.7% 14 LEB 4600 1,110,013.69 241.31 21 558,941.46 121.51 119.80 22 5 23.96 2 920 50.4% 9 COL 1474 354,105.84 240.23 22 11,564.65 7.85 232.39 18 2.4 96.83 1 614 3.3% 22 IU AVERAGE 3952 2,150,460.75 544.09 980,237.35 248.01 296.08
“GPS” on district owned buses Replaces
▪ Mileage sheets ▪ Time sheets
Tracks
▪ Speed ▪ Location ▪ Route
Improves safety
Non Public Transportation Shared Savings Plan
2012/2013 school year
▪ 56/102 families participating
2013/2014 school year
▪ 54/106 families participating
▪ 30 families returned ▪ 24 new families
Building a culture
Solanco School District Transportation Policy 810 The bus route will be designed TO PASS AT OR WITHIN
ONE MILE of each house. This distance will be determined from the point where the private drive or walkway joins a public road.
Bus stops will NOT be established inside residential
developments.
Buses will be expected to travel along those roads most