Sarpy County EDC 1 st Quarter Meeting March 8 th , 2016 Project - - PowerPoint PPT Presentation

Sarpy County EDC 1 st Quarter Meeting March 8 th , 2016 Project Purpose Project Purpose To analyze transportation and land use options for the corridor. Determine Platteviews function as a major east west corridor given new


slide-1
SLIDE 1

Sarpy County EDC 1st Quarter Meeting

March 8th, 2016

slide-2
SLIDE 2

Project Purpose

Project Purpose

  • To analyze transportation and land

use options for the corridor.

  • Determine Platteview’s function as

a major east‐west corridor given new Missouri River bridge crossing

Project Goals

  • Improve traffic safety
  • Provide for system linkage
  • Travel time reduction
  • Support future development
slide-3
SLIDE 3

Existing Conditions – Traffic Volumes

Traffic Volumes

  • 2012 MAPA Traffic Count

Map show volumes of 4,200 east of 84th Street, between 2,700 to 3,800 between N-50 and 84th Street, and less than 2,000 between N-50 and N- 31.

Impacts of US 34 Bridge Opening

  • 2014 MAPA traffic counts show that

daily traffic volumes increased to 4,400 vehicles per day east of 84th Street after the opening of the new bridge.

Source: Iowa Department of Transportation

slide-4
SLIDE 4

Short Term Improvements

108th Street Interim Project

  • Design of the interim project is

complete.

  • Right‐of‐Way plans are currently under

review.

  • Acquisition of Right‐of‐Way is tentatively

scheduled for 2017 but will depend on budget availability. 84th Street Interim Project

  • Detailed design of this project has not

begun.

  • This project will occur after the

completion of the 108th Street improvements

  • Future phases are subject to budget

availability.

slide-5
SLIDE 5

Cross Section Alternatives

  • Arterial. Primary function is to

carry longer‐distance flows Arterials can be either urban with curb and gutter or rural with travel shoulders.

  • Expressway. Construct a new

expressway, which is a divided arterial highway for through traffic with full or partial control

  • f access and with grade

separations provided at major intersections.

Typical 4‐Lane Arterial Cross Section Typical 4‐Lane Expressway Cross Section

slide-6
SLIDE 6

Scenarios

Expressway Alternative (Buildout Land Use) Arterial Alternative (Heartland 2040 Land Use) Blended Scenario:

Heartland 2040 with 15% population reassignment around Platteview Road.

Buildout Scenario:

Population location based upon historical buildout projected to 2040.

Heartland 2040:

Compact development principles limiting residential expansion into South Sarpy County.

slide-7
SLIDE 7

Public Involvement

February 10, 2012, Kick‐Off and Agency Coordination Meeting

  • Public meeting to introduce the project

and project team.

  • Attended by 175 people.

May 29, 2014, Open House

  • The values and opinions that were

expressed at this meeting included:

– Concern about additional traffic on this route—including truck traffic – Keeping the corridor safe for all users – Concern about and plan for growth

Web Site http://platteviewroad.com/

provided information on project and

  • pportunity to review report and comment.

August 31, 2015, Open House

  • Receive comments from on the alternatives
  • More than 350 attendees attended the
  • meeting. 50 comments were received.

March 22, 2016 Public Meeting

  • Receive comments from the public on the draft

recommendations and report

Steering Committee

  • Sarpy County, Bellevue, Springfield, Gretna,

Papillion, LaVista, MAPA and NDOR

  • 12 Steering Committee Meetings Held

Growth Summit Workshop

  • Half‐day workshop to examine future growth

patterns and discuss potential transportation alternatives

slide-8
SLIDE 8

Build Out Scenario

slide-9
SLIDE 9

Project Development Timeline

  • Next Steps

– Include in MAPA Long Range Plan and TIP – Include corridor in local land use plans – Continue to address short term projects – Preliminary Engineering (design) and Environmental (NEPA) – Design – Right of Way Acquisition and Construction

  • Typical timeframe for the first phase to begin

construction is a minimum of 10 years

slide-10
SLIDE 10

Project Contacts & Questions

– Michael Piernicky, PE, PTOE

Olsson Associates mpiernicky@olssonassociates.com

– Michael Felschow

Metropolitan Area Planning Agency mfelschow@mapacog.org