SANTA ANA RIVER TRAIL Phase III Phase IV, Reaches A, B & C - PowerPoint PPT Presentation

Regional Parks Department Division SANTA ANA RIVER TRAIL Phase III Phase IV, Reaches A, B & C Beahta Davis Director 6/25/20 www.SBCounty.gov SANTA ANA RIVER TRAIL Page 2 The Santa Ana River Trail (SART) corridor extends over


  1. Regional Parks Department Division SANTA ANA RIVER TRAIL Phase III Phase IV, Reaches A, B & C Beahta Davis Director 6/25/20 www.SBCounty.gov

  2. SANTA ANA RIVER TRAIL Page 2 The Santa Ana River Trail (SART) corridor extends over approximately 110 miles from the Pacific Ocean at Huntington Beach inland to the San Bernardino Mountains. Upon Completion, the SART will be the “Crest to Coast” regional trail link connection an area encompassing over four million residents in three counties (Orange, Riverside and San SAN BERNARDINO Bernardino). The County of San Bernardino’s portion of the SART is 21.5 miles. This segment has been divided into four phases, and of that phase four has been divided into several segments. To date, the County has completed the construction of phases one and two covering approximately 8 miles of SART from the Riverside County line to just west of Waterman Avenue in San Bernardino. This non-vehicular trail will provide safe use and enjoyment of open space, environmental education and serve as an essential regional trail system. REDLANDS ABOUT SANTA ANA RIVER TRAIL from Coast to Crest

  3. SANTA ANA RIVER TRAIL Page 3 CALIFORNIA ST ORANGE ST JUDSON ST GARNET ST WATERMAN AVE LA CADENA DR LEGEND PHASE I (Completed 2007) PHASE II (Completed 2005) PHASE III (In Design) PHASE IV, A (In Design) PHASE IV, B (In Design) PHASE IV, C (In Design) PHASE IV, D (Future) PHASE IV, E (Future) Overall Trail within San Bernardino County

  4. SANTA ANA RIVER TRAIL Page 4 SAN BERNARDINO REDLANDS Phase III Construction dependent on Waterman Avenue, San Bernardino to California Street, Redlands mitigation funding availability

  5. SANTA ANA RIVER TRAIL Page 5 REDLANDS Phase IV, Reach A Construction dependent on funding availability California Street to Orange Street, Redlands

  6. SANTA ANA RIVER TRAIL Page 6 REDLANDS Phase IV, Reaches B & C Construction dependent on funding availability Orange Street, Redlands to Opal Avenue, Mentone

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.