10/10/2017 OC Streetcar Project Jim Hecht, HDR, OC Streetcar Program Management Consultant, jim.hecht@hdrinc.com 1 OC Streetcar Project First modern urban rail transit project in Orange County 4.1 mile, modern streetcar, from SARTC to


slide-1
SLIDE 1

10/10/2017 1

OC Streetcar Project

1

Jim Hecht, HDR, OC Streetcar Program Management Consultant, jim.hecht@hdrinc.com

OC Streetcar Project

2

  • First modern urban rail transit project in Orange County
  • 4.1 mile, modern streetcar, from SARTC to Harbor/Westminster
  • 8 vehicles, 10/15 minute headways, 10 stops in each direction
  • Advertise for construction in about one month, scheduled to open Dec 2020
  • How did we get here?
slide-2
SLIDE 2

10/10/2017 2

What is a Modern Streetcar?

3

Measure M2

4

  • 2006 half-cent sales tax measure
  • Improvements to Metrolink
  • Transit Extensions to Metrolink
slide-3
SLIDE 3

10/10/2017 3

Go Local/Project S

5

  • Local agencies were invited to

submit proposals to OCTA for improved transit service to Metrolink Stations

  • Winners were awarded funding

for planning studies

  • Cities of Santa Ana and Garden

Grove were successful

Alternatives Analysis

6

slide-4
SLIDE 4

10/10/2017 4

Environmental Documents

7

FTA Capital Investment Grant (New Starts)

8

slide-5
SLIDE 5

10/10/2017 5

Value Engineering/Risk Assessment

9

Changes to Track Layout

Changed Bridge Type Westminster

10

Before After

slide-6
SLIDE 6

10/10/2017 6

Road Reconfiguration

11

Before After

CL of Streetcar

Traction Power Substation Locations

12

Before After

slide-7
SLIDE 7

10/10/2017 7

Station Design

13

Modifications to 4th Street

14

slide-8
SLIDE 8

10/10/2017 8

Santa Ana River Bridge

15

Pacific Electric ROW (West of Raitt St)

  • Two Bridges (DF Track)
  • Westminster Ave, 2-span, 231-feet-long, cast-in-place, post-tensioned,

concrete box girder bridge, cast-in-drilled hole (CIDH) piles

  • Santa Ana River, 3-span, 356-feet-long, precast, prestressed, Caltrans

wide-flange girder bridge, CIDH piles

  • Two At-Grade Railroad Crossings
  • Fairview Street and 5th Street
  • Ties and Ballast, 44 MPH, Two-Wire Catenary

16

slide-9
SLIDE 9

10/10/2017 9

Street Running (East of Raitt St)

  • WB: Santa Ana Blvd; EB: Sasscer Park, 4th Street,

Mortimer Street

  • Ross Street ByPass
  • Embedded Block Rail
  • Single Contact Wire plus underground feeder
  • New and Modified Traffic Signals, City Bike Lane

17

Maintenance and Storage Facility

slide-10
SLIDE 10

10/10/2017 10

What’s Left?

Construction Bids Construction Vehicle Manufacturing Operations and Maintenance Contract Start‐Up and Testing Opening

19

Questions?

20

slide-11
SLIDE 11

10/10/2017 11

Thank You!

21