OC Streetcar Project Jim Hecht, HDR, OC Streetcar Program Management - PDF document

10/10/2017 OC Streetcar Project Jim Hecht, HDR, OC Streetcar Program Management Consultant, jim.hecht@hdrinc.com 1 OC Streetcar Project First modern urban rail transit project in Orange County 4.1 mile, modern streetcar, from SARTC to


  1. 10/10/2017 OC Streetcar Project Jim Hecht, HDR, OC Streetcar Program Management Consultant, jim.hecht@hdrinc.com 1 OC Streetcar Project • First modern urban rail transit project in Orange County • 4.1 mile, modern streetcar, from SARTC to Harbor/Westminster • 8 vehicles, 10/15 minute headways, 10 stops in each direction • Advertise for construction in about one month, scheduled to open Dec 2020 • How did we get here? 2 1

  2. 10/10/2017 What is a Modern Streetcar? 3 Measure M2 • 2006 half-cent sales tax measure • Improvements to Metrolink • Transit Extensions to Metrolink 4 2

  3. 10/10/2017 Go Local/Project S • Local agencies were invited to submit proposals to OCTA for improved transit service to Metrolink Stations • Winners were awarded funding for planning studies • Cities of Santa Ana and Garden Grove were successful 5 Alternatives Analysis 6 3

  4. 10/10/2017 Environmental Documents 7 FTA Capital Investment Grant (New Starts) 8 4

  5. 10/10/2017 Value Engineering/Risk Assessment Changes to Track Layout 9 Changed Bridge Type Westminster Before After 10 5

  6. 10/10/2017 Road Reconfiguration Before CL of Streetcar After 11 Traction Power Substation Locations Before 12 After 6

  7. 10/10/2017 Station Design 13 Modifications to 4 th Street 14 7

  8. 10/10/2017 Santa Ana River Bridge 15 Pacific Electric ROW (West of Raitt St) • Two Bridges (DF Track) • Westminster Ave, 2-span, 231-feet-long, cast-in-place, post-tensioned, concrete box girder bridge, cast-in-drilled hole (CIDH) piles • Santa Ana River, 3-span, 356-feet-long, precast, prestressed, Caltrans wide-flange girder bridge, CIDH piles • Two At-Grade Railroad Crossings • Fairview Street and 5 th Street 16 • Ties and Ballast, 44 MPH, Two-Wire Catenary 8

  9. 10/10/2017 Street Running (East of Raitt St) • WB: Santa Ana Blvd; EB: Sasscer Park, 4 th Street, Mortimer Street • Ross Street ByPass • Embedded Block Rail • Single Contact Wire plus underground feeder 17 • New and Modified Traffic Signals, City Bike Lane Maintenance and Storage Facility 9

  10. 10/10/2017 What’s Left? Operations and Construction Vehicle Start ‐ Up and Construction Maintenance Opening Bids Manufacturing Testing Contract 19 Questions? 20 10

  11. 10/10/2017 Thank You! 21 11

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.