sampa linearity test results
play

SAMPA linearity test results SAMPAmeeting 11.03.2015 Sohail Musa - PowerPoint PPT Presentation

SAMPA linearity test results SAMPAmeeting 11.03.2015 Sohail Musa Mahmood on behalf of SAMPA team and Norwegian group Gain and Peaking time Setup configuration Connecting a small capacitance in series with the input cable. Applying an


  1. SAMPA linearity test results SAMPAmeeting 11.03.2015 Sohail Musa Mahmood on behalf of SAMPA team and Norwegian group

  2. Gain and Peaking time Setup configuration • Connecting a small capacitance in series with the input cable. • Applying an input signal (square wave, ramp up/down, exponential rise/fall ). • Connecting the input signal directly to the detector pads. • Setting the configuration of the analog chip. • Observe the differential output at the corresponding channel.

  3. Setup configuration

  4. Gain Results 30mV/fC 31.20 31.00 30.80 30.60 30.40 30.20 30.00 29.80 29.60 29.40 29.20 29.00 28.80 28.60 28.40 28.20 28.00 27.80 27.60 27.40 27.20 27.00 26.80 30mV/fC@160ns + 30mV/fC@160ns - 30mV/fC@80ns + 30mV/fC@80ns -

  5. Gain Results

  6. 30mV/fC@160 ns - Linearity

  7. 20mV/fC@160 ns - Linearity

  8. 30mV/fC@160 ns (pos) – Linearity – all channels

  9. 30mV/fC@160 ns (pos) – Linearity – mean value

  10. 30mV/fC@160 ns (pos)- Linearity INL

  11. 30mV/fC@160 ns (neg) – Linearity All channels

  12. 30mV/fC@160 ns – Linearity INL – ALL CHANNELS

  13. 30mV/fC@160 ns (neg) – Linearity MEAN

  14. 30mV/fC@160 ns (neg) – Linearity MEAN - INL

  15. 20mV/fC@160 ns (pos) – Linearity ALL channels

  16. 20mV/fC@160 ns (pos) – Linearity MEAN

  17. 20mV/fC@160 ns (pos) – Linearity MEAN - INL

  18. 20mV/fC@160 ns (neg) – Linearity ALL channels

  19. 20mV/fC@160 ns (neg) – Linearity MEAN

  20. 20mV/fC@160 ns (neg) – Linearity MEAN - INL

  21. Conclusion • Linearity seems to be good. • Some issues with the desired gain. • More oscillations on channel 1 than other channels. (tested 2 chips) • Some more linearity results for the chip 3 analog part (only for positive configurations)

  22. On going work and future plans • Analysing the results for statistical linearity measurements. • Preparing the setup for first irradition tests of SAMPA MPW1. • Single-Event Latchup tests on all 3 chips and Single Event Upset tests on shift registers (chip 3). • Planning to perform the first irradiation tests in the end of april in Uppsala (together with RCU2 testing).

  23. Thank you for your attention. Any questions ?

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.

Recommend


More recommend