risk engineering vs risk management timothy w bibbs
play

Risk Engineering vs Risk Management Timothy W Bibbs General Director - PowerPoint PPT Presentation

Risk Engineering vs Risk Management Timothy W Bibbs General Director Mensor Limited International Professional Forum Risk Management in Russia 17 -18 th September 2018 Sochi, Russia Contents Credentials Risk Management Risk


  1. Risk Engineering vs Risk Management Timothy W Bibbs General Director – Mensor Limited International Professional Forum Risk Management in Russia 17 -18 th September 2018 Sochi, Russia

  2. Contents  Credentials  Risk Management  Risk Engineering  Synergy  Estimated Maximum Losses  Recommendations  Ratings  Case Study  Conclusion

  3. Credentials Timothy Bibbs  37 years Engineering Experience  27 years in Russia  19 years in Risk Engineering  One of first in Russia  Surveys in all industries

  4. Credentials Mensor  Established in September 2011  Former Soviet Union  All industries  Russian/British engineers  Independent  International Quality Reports  Respected Reputation

  5. Risk Management  Assessment of Risks  Severity  Frequency  Strategy  Reduce Risk  Minimise Impact  Insurance

  6. Risk Engineering  For Insurance Purposes  Technical Assessment of Risks  Comparative Rating of Risk  All Aspects  Estimated Maximum Losses  Magnitude not Frequency  Physical Damage  Business Interruption  Risk Reduction Recommendations

  7. Synergies Estimated Maximum Losses  Identify Scenarios  Estimate Impact  Physical Damage  Business Interruption

  8. Synergies Synergies Recommendations  Purpose  Reduce Risk  Reduce Impact  Basis  International Best Practice  Previous Worldwide Losses  Not Conformance with Regulations

  9. Synergies Ratings  International Basis  Overall  All Aspects  Process  Protection  Organisation  All Risks  Loss History

  10. Case Study  Pumping Intermediate Product between Plants  Freezing & Fire: Major Impact  Actions  Circulation  Improve Fire Protection  Business Continuity Plan  Establish New Pump House  Process Feed in Alternative Plant  Result  Reduced Risk & Impact  Reduced EML

  11. Conclusion Risk Engineering Risk Management Reduced Risk Better Insurance Outcomes

  12. Thank you for your attention MENSOR The Surveyor Building 1, 28 Novoryazanskaya Street, Moscow Telephone: +7 (926) 095-32-31 E-mail : info@mensor.pro www. mensor.pro

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.

Recommend


More recommend