Rhode Island Stormwater Design and Installations Standards Manual - - PowerPoint PPT Presentation

rhode island stormwater design and installations
SMART_READER_LITE
LIVE PREVIEW

Rhode Island Stormwater Design and Installations Standards Manual - - PowerPoint PPT Presentation

Rhode Island Stormwater Design and Installations Standards Manual Public Workshop How to Use the Revised Manual January 13, 2011 Horsley W itten Group, I nc. Horsley W itten Group, I nc. Who Should Use the Manual? Municipal Officials


slide-1
SLIDE 1

Horsley W itten Group, I nc. Horsley W itten Group, I nc.

Rhode Island Stormwater Design and Installations Standards Manual

Public Workshop How to Use the Revised Manual January 13, 2011

slide-2
SLIDE 2

Horsley W itten Group, I nc. Horsley W itten Group, I nc.

Designers

Who Should Use the Manual?

Property Owners Regulatory Reviewers Municipal Officials

slide-3
SLIDE 3

Horsley W itten Group, I nc. Horsley W itten Group, I nc.

Steps to Designing an Approvable Stormwater System

slide-4
SLIDE 4

Horsley W itten Group, I nc. Horsley W itten Group, I nc.

Steps 1 and 2

  • What criteria are relevant

to your proj ect?

  • Other local ordinances to

consider?

  • Topography
  • Drainage area delineations
  • S
  • il, groundwater, geologic

constraints

  • Zoning restrictions
slide-5
SLIDE 5

Horsley W itten Group, I nc. Horsley W itten Group, I nc.

Steps 3 and 4

  • What volume requirements

must be met? (Rev, WQv, CPv, Qp)

  • What BMPs can be used?
  • Incorporate LID into your

proj ect at the initial design stages, before building layouts are finalized

slide-6
SLIDE 6

Horsley W itten Group, I nc. Horsley W itten Group, I nc.

Steps 5 and 6

  • Develop conceptual design
  • Coordinate with review

agencies

  • Collect more data and

revise as necessary

  • Move forward with a design

that meet standards 1-9

slide-7
SLIDE 7

Horsley W itten Group, I nc. Horsley W itten Group, I nc.

Important Sections of the Manual Relevant to Each Standard

  • S

tandard 1 – refer to Chapt. 3.3.1, Chapt. 4, and Appendix A

  • S

tandard 2 – refer to Chapt. 3.3.2, Chapt. 4.6 (S W Credit), Chapt. 5, App. F (specs) and App. H.1 (soil testing)

  • S

tandard 3 – refer to Chapt. 3.3.3, Chapt. 4.6 (S W Credit), Chapt. 5, Chapt. 6, App. B (landscaping), App. F (specs), App. H.3 (pollutant loading analyses), and App. J (TAP)

slide-8
SLIDE 8

Horsley W itten Group, I nc. Horsley W itten Group, I nc.

Cont’d

  • S

tandard 4 – refer to Chapt. 3.3.4, Chapt. 5 & 7, App. D (design exmp), App. H.4 (short-cut sizing), App. I (River/ S tream Order), and App. K (H/ H Modeling Guidance)

  • S

tandard 5 – refer to Chapt. 3.3.5 and 3.3.6, Chapt. 5 & 7, App. D, App. I (River/ S tream Order), and App. K (H/ H Modeling Guidance)

slide-9
SLIDE 9

Horsley W itten Group, I nc. Horsley W itten Group, I nc.

Cont’d

  • S

tandard 6 – refer to Chapt. 3.2.6, App. C (retrofit options)

  • S

tandard 7 –

  • App. G (Pollution prevention

and source control)

  • S

tandard 8 – refer to Tables 3-2 and 3-3,

  • Chapt. 5
  • S

tandard 9 –

  • Chapt. 3.2.9
slide-10
SLIDE 10

Horsley W itten Group, I nc. Horsley W itten Group, I nc.

Steps 7 and 8

  • Develop appropriate ES

C plan to meet standard 10

  • Develop appropriate O&M

plan to meet standard 11

  • S

pecific requirements in Chapters 5-7

  • Add’ l guidance in App. E
slide-11
SLIDE 11

Horsley W itten Group, I nc. Horsley W itten Group, I nc.

Step 9

  • Final Plan meeting all

requirements Refer to Appendix A throughout design process

slide-12
SLIDE 12

Horsley W itten Group, I nc. Horsley W itten Group, I nc.

slide-13
SLIDE 13

Horsley W itten Group, I nc. Horsley W itten Group, I nc.

slide-14
SLIDE 14

Horsley W itten Group, I nc. Horsley W itten Group, I nc.

slide-15
SLIDE 15

Horsley W itten Group, I nc. Horsley W itten Group, I nc.

slide-16
SLIDE 16

Horsley W itten Group, I nc. Horsley W itten Group, I nc.

slide-17
SLIDE 17

Horsley W itten Group, I nc. Horsley W itten Group, I nc.