Retrospective Updates
Issues Raised at RAASP Workshops - UPDATED
10th November 2015
1
Retrospective Updates Issues Raised at RAASP Workshops - UPDATED 10 - - PowerPoint PPT Presentation
Retrospective Updates Issues Raised at RAASP Workshops - UPDATED 10 th November 2015 1 Background Three workshops have taken place to walk through the processes and scenarios for Retrospective Updates During detailed design and working
1
3
Shipper submits a Retro Meter exchange Reconciliation – Released Retro Meter Exchange 4 Read marked as ‘Suspect’ Transfer Read Read marked as ‘Suspect’ Replaced by SAR Read marked as ‘Suspect’ R1 R2 R3 Read rec’d after retro update Reconciliation Released Rec held
Shipper submits a Retro Meter exchange Reconciliation – Released Retro Meter Exchange 5 Read marked as ‘Suspect’ Transfer Read Read marked as ‘Suspect’ Replaced by SAR Read marked as ‘Suspect’ R1 R2 R3 Read rec’d after retro update Reconciliation - Released
Data Item No Impact to Reads or Consumption Impact to Consumption Only Impact to Reads and Consumption Meter Metric/Imperial indicator Yes Read Factor (also updates ‘Read Units’) Yes Read Units (derived by the ‘Units
Factor’) *N/A Meter Status (clamped/capped) *Yes
Yes Meter Model Yes Meter mechanism Yes Manufacturer & Year Yes Meter Serial Number Yes * Different to statement in Retro Updates BRD v4.0
Shipper submits a retrospective update Re-Reconciliation Meter Installation Read Read 8
Shipper submits a retrospective update Re-Reconciliation Meter Installation Read marked as ‘Suspect’ 9 Read marked as ‘Suspect’ Latest read